How far back utilities refund overcharges, by state
When a utility bills a business incorrectly, state law, commission rules or the utility's own tariff decide how many months or years of overcharges come back. This reference lists all 50 states with their regulator, and the rule, period and source for each state we have verified.
01 / 05
The short answer
It depends on the state, and the rules are not alike. Across all 50 states, each checked against its own statute, rule, tariff or commission statement, the answer runs from six months or a year in states such as North Dakota, Indiana and Oregon, to six years in Maine, Washington and Wisconsin, to the whole period of the error in Texas, Florida, Arizona and Nevada. Hawaii's main utilities refund a wrong rate schedule with no time limit, while about a dozen states leave the period to each utility's tariff. Two things decide most claims: whether the state counts back from the date you file or the date the error was found, and whether the start of the error can be dated.
02 / 05
Refund periods for utility overbilling, all 50 states
Investor-owned electric and gas utilities regulated by the state commission. Municipal utilities and cooperatives usually set their own rules.
| State | Refund period | Rule | Regulator |
|---|---|---|---|
| Alabama | 36 months | Ala. Admin. Code r. 770-X-3-.15 (electric billing inaccuracies) | Commission |
| Alaska | Set by utility tariff | 3 AAC 52.430 to 52.450 (Regulatory Commission of Alaska billing rules) | Commission |
| Arizona | Back to when the error began | Ariz. Admin. Code R14-2-210(E) (electric; gas rules in R14-2-310) | Commission |
| Arkansas | Refund of the overbilled amount | Arkansas PSC billing rules, as the Commission summarizes them | Commission |
| California | 3 years | PG&E Electric Rule 17.1 and Gas Rule 17.1, under rules the CPUC set in Decision 86-06-035 | Commission |
| Colorado | 2 years (gas) | 4 CCR 723-4, Rule 4402 (gas utilities), as quoted by the utility; rules text | Commission |
| Connecticut | Actual period of the meter error | Conn. Agencies Regs. §16-11-110 (electric) and §16-11-35 (gas meter error) | Commission |
| Delaware | Up to 3 years for meter errors (Delmarva) | Delmarva Power P.S.C. Del. No. 8 - Electric, Rules and Regulations Section IX (Adjustment of Charges), tariff effective September 1, 2026; PSC Docket No. 20-0217 | Commission |
| Florida | Whole period of the error | Rule 25-6.106(2), F.A.C. (electric); Rule 25-7.0851 (gas) | Commission |
| Georgia | Back to when a meter error began (Georgia Power) | Georgia Power Rules and Regulations for Electric Service, Section E.4 and E.9 (January 2023); Ga. Comp. R. & Regs. ch. 515-3 (PSC general rules) and O.C.G.A. §46-4-160.2 (gas marketers) | Commission |
| Hawaii | No limit for wrong rate schedule | Hawaiian Electric companies' tariff Rule No. 11, Section C, as described in the companies' 2015 filing with the Hawaii PUC | Commission |
| Idaho | Up to 3 years; 6 months if undated | IDAPA 31.21.01.203 (Utility Customer Relations Rule 203) and Idaho Code §61-642, as applied in IPUC Order No. 28298 | Commission |
| Illinois | 2-year filing window | 220 ILCS 5/9-252, 9-252.1 and 83 Ill. Adm. Code 280 | Commission |
| Indiana | 1 year | 170 IAC 5-1-14 (gas) and 170 IAC 4-1-14 (electric meter adjustments) | Commission |
| Iowa | 5 years | Iowa Utilities Commission adjustment-of-bills rules (text read: 199 IAC 21.4(6); electric and gas chapters 20 and 19 carry adjustment-of-bills subrules) | Commission |
| Kansas | 12 months, or back to a known error date (Evergy) | Evergy Kansas Central General Terms and Conditions, Section 4.05.09 (Correction of Erroneous Bills); No statewide refund rule found in KCC regulations; KCC-approved utility tariffs govern, e.g. Kansas Gas Service General Terms and Conditions §9.02.05 | Commission |
| Kentucky | 5 years | No refund statute; Public Service Commission practice, as described by its Executive Director in 2023 | Commission |
| Louisiana | Meter claims within 30 days of the bill (Entergy Louisiana) | Entergy Louisiana electric Terms and Conditions and legacy ELL Service Regulations, Rule 18; House Bill 478 (2026), enacted as Act 553; LPSC orders case by case | Commission |
| Maine | 6 years | 35-A M.R.S. §1308 and MPUC Chapter 815, §8 | Commission |
| Maryland | Whole period of the error | COMAR 20.50.04.05 (adjustment of bills, including section D on rate-schedule errors) | Commission |
| Massachusetts | Set by utility tariff | 220 CMR 26.00 (non-residential customer rules) and each utility's DPU-approved terms and conditions | Commission |
| Michigan | 3 years (billing); 12 months (meters) | Mich. Admin. Code R 460.126a (billing error) and R 460.115 (meter error) | Commission |
| Minnesota | 3 years | Minn. R. 7820.3800 (electric) and 7820.4000 (gas) | Commission |
| Mississippi | 3 months for meter errors (Entergy Mississippi) | Entergy Mississippi Service Policy (meter testing and bill adjustment); 39 Miss. Code R. 3-1-10 (PSC billing and meter-adjustment rule) and PSC orders | Commission |
| Missouri | Up to 60 months | 20 CSR 4240-13.025 and utility tariffs such as Evergy's Missouri rules | Commission |
| Montana | No refund limit in tariff (NorthWestern) | NorthWestern Energy Montana Electric Tariff, Rule No. 10 (Billing), section 10-6; ARM 38.5.901 and 38.5.902 (billing errors) and each utility's PSC-approved tariff | Commission |
| Nebraska | Gas: refund of meter overcharge; electric: set by each utility | 291 Neb. Admin. Code ch. 9, §017.09A (natural gas); electric utilities set their own rules | Commission |
| Nevada | Back to when the error began, with interest | NV Energy Rule 5(H) on billing-error adjustments, as cited by PUCN staff, and a 2025 state law requiring full refunds of overcharges (reporting on the bill) | Commission |
| New Hampshire | 2 years before filing | RSA 365:29 (orders for reparation) | Commission |
| New Jersey | Period of the meter error | N.J.A.C. 14:3-4.6 (adjustment of charges for meter error) | Commission |
| New Mexico | From when the error began; 6 months if unknown (gas meters) | 17.9.560.12 NMAC (electric, non-residential service standards) and 17.10.650 NMAC (gas) | Commission |
| New York | No fixed period | Public Service Law §118(3); 16 NYCRR 13.9 for non-residential backbills | Commission |
| North Carolina | Period of the error; 12 months if unknown | NCUC Rule R8-44 (electric billing errors) and R6-15 (gas) | Commission |
| North Dakota | Up to 6 months (electric meters) | N.D. Admin. Code 69-09-02-12 (electric meter errors); refunds under 69-09-02-13; gas meter errors under 69-09-01-23 | Commission |
| Ohio | Period of the meter error | Ohio Adm. Code 4901:1-10-05 (meter inaccuracy) | Commission |
| Oklahoma | Whole period of the meter error (gas) | OAC 165:45-5-2 (gas meter error); electric billing rules in OAC 165:35 subchapter 19 | Commission |
| Oregon | 12 months | ORS 757.077(3) and OAR 860-021-0135 | Commission |
| Pennsylvania | 4 years before complaint | 66 Pa.C.S. §1312(a) | Commission |
| Rhode Island | Set by PUC order and tariff | 815-RICR-30-00-1.7.5 (meter billing adjustments) and PUC orders | Commission |
| South Carolina | Period of the error under the rule | S.C. Code Regs. 103-340 (electric) and 103-440 (gas) | Commission |
| South Dakota | 6 months for meter errors; 1 year if not registering | ARSD 20:10:17:06 and 20:10:17:07 (gas and electric billing rules, as amended in the Commission's 2010 rulemaking) | Commission |
| Tennessee | Half the time since last test | Tenn. Comp. R. & Regs. 1220-04-04-.18 (electric meter adjustments) | Commission |
| Texas | Whole period of the error | 16 TAC §25.28(c) (electric utilities) and §25.480 (retail electric providers) | Commission |
| Utah | 24 months (gas) | Utah Admin. Code R746-320-9 (natural gas overbilling) | Commission |
| Vermont | No look-back in tariff; $35 credit per inaccurate bill (GMP) | Green Mountain Power Terms and Conditions for Electric Service, Tariff V.P.U.C. 10 (effective June 21, 2025); Vermont PUC Rules 3.300 and 3.400 and each utility's PUC-approved tariff, e.g. Green Mountain Power's Tariff V.P.U.C. 10 | Commission |
| Virginia | 3 years (Dominion), longer with old bills | Dominion Energy Virginia terms and conditions, as reported by WHSV/AP (2017); 20VAC5-10 (SCC rules governing utility service) and each utility's SCC-approved terms and conditions | Commission |
| Washington | 6 years | WAC 480-90-178 (gas) and WAC 480-100-178 (electric) | Commission |
| West Virginia | Not in tariff; PSC decides (Appalachian Power) | Appalachian Power P.S.C. W.Va. Tariff No. 16 (searched in full); W. Va. Code R. 150-3 (PSC rules for electric utilities) and each utility's PSC-approved tariff | Commission |
| Wisconsin | 6 years | Wis. Adm. Code PSC 113.0406; Wis. Stat. 893.93(1)(a) as applied in utility rules | Commission |
| Wyoming | Full excess over filed rates | Wyo. Stat. §37-2-218 (refund of excess charges) | Commission |
03 / 05
Four ways states set the limit
- A fixed look-back in the tariff. California's utilities refund three years of a billing error under a tariff rule, or less if the error is known to be shorter.
- A limit counted from the complaint. Pennsylvania lets the commission order refunds of payments made within four years before a complaint is filed; Illinois counts two years. In these states, the day a claim is filed sets how much is still recoverable.
- The whole period of the error. Texas and Florida rules require the correction to cover the full period of the overbilling, limited in practice by the records available.
- Commission practice. Where no statute sets a refund period, as in Kentucky and New York, the commission applies a general limitation period or decides case by case.
Back-billing, where the utility collects for undercharges, usually runs on a different and shorter clock. New York limits non-residential backbills to 12 months when the utility caused the error, and Kentucky limits them to two years. The two periods are not symmetrical, so a refund claim cannot assume the same window.
04 / 05
What this means for a refund claim
- File promptly. In complaint-window states, every month a known error goes unfiled is a month that falls off the refund.
- Date the error. Rules that refund the whole period, or that make an exception when the start can be fixed, reward evidence: the date of the meter exchange, the plant expansion, the account change or the tariff revision.
- Read the tariff's own rule. Most utilities repeat or extend the commission's rule in the rules and regulations section of their tariff, often under a heading on billing or meter error.
- Separate errors from options. A wrong calculation under the assigned rate is a billing error. Moving to a cheaper rate the site always qualified for is often treated differently, and some utilities refund only from the date of the request.
- Keep records. Utilities keep billing records for limited periods, and refunds are often computed from what records remain.
Discovery Energy reviews 36 to 48 months of history on every account and pursues the longest period each jurisdiction allows. See how overcharge recovery works for the steps from finding to refund.
How to check a state that is not listed
- Search the state administrative code for the commission's rules on billing adjustments, overbilling or meter error.
- Read the utility's tariff rules for billing error and meter error adjustments.
- Check the public utility statute for sections on refunds, reparations or complaints, which often hold the time limit.
- Ask the commission's consumer staff how the limit is applied to non-residential customers. Each regulator is linked in the table above.
Sources
- Arkansas: Arkansas PSC billing rules, as the Commission summarizes them
- California: PG&E Electric Rule 17.1 and Gas Rule 17.1, under rules the CPUC set in Decision 86-06-035
- Colorado: 4 CCR 723-4, Rule 4402 (gas utilities), as quoted by the utility; rules text
- Florida: Rule 25-6.106(2), F.A.C. (electric); Rule 25-7.0851 (gas)
- Illinois: 220 ILCS 5/9-252, 9-252.1 and 83 Ill. Adm. Code 280
- Indiana: 170 IAC 5-1-14 (gas) and 170 IAC 4-1-14 (electric meter adjustments)
- Kentucky: No refund statute; Public Service Commission practice, as described by its Executive Director in 2023
- Michigan: Mich. Admin. Code R 460.126a (billing error) and R 460.115 (meter error)
- Minnesota: Minn. R. 7820.3800 (electric) and 7820.4000 (gas)
- Missouri: 20 CSR 4240-13.025 and utility tariffs such as Evergy's Missouri rules
- New York: Public Service Law §118(3); 16 NYCRR 13.9 for non-residential backbills
- Ohio: Ohio Adm. Code 4901:1-10-05 (meter inaccuracy)
- Oregon: ORS 757.077(3) and OAR 860-021-0135
- Pennsylvania: 66 Pa.C.S. §1312(a)
- Texas: 16 TAC §25.28(c) (electric utilities) and §25.480 (retail electric providers)
- Washington: WAC 480-90-178 (gas) and WAC 480-100-178 (electric)
- Wisconsin: Wis. Adm. Code PSC 113.0406; Wis. Stat. 893.93(1)(a) as applied in utility rules
- Alabama: Ala. Admin. Code r. 770-X-3-.15 (electric billing inaccuracies)
- Alaska: 3 AAC 52.430 to 52.450 (Regulatory Commission of Alaska billing rules)
- Arizona: Ariz. Admin. Code R14-2-210(E) (electric; gas rules in R14-2-310)
- Connecticut: Conn. Agencies Regs. §16-11-110 (electric) and §16-11-35 (gas meter error)
- Maryland: COMAR 20.50.04.05 (adjustment of bills, including section D on rate-schedule errors)
- Tennessee: Tenn. Comp. R. & Regs. 1220-04-04-.18 (electric meter adjustments)
- Utah: Utah Admin. Code R746-320-9 (natural gas overbilling)
- Iowa: Iowa Utilities Commission adjustment-of-bills rules (text read: 199 IAC 21.4(6); electric and gas chapters 20 and 19 carry adjustment-of-bills subrules)
- New Hampshire: RSA 365:29 (orders for reparation)
- New Jersey: N.J.A.C. 14:3-4.6 (adjustment of charges for meter error)
- North Carolina: NCUC Rule R8-44 (electric billing errors) and R6-15 (gas)
- Virginia: Dominion Energy Virginia terms and conditions, as reported by WHSV/AP (2017); 20VAC5-10 (SCC rules governing utility service) and each utility's SCC-approved terms and conditions
- South Carolina: S.C. Code Regs. 103-340 (electric) and 103-440 (gas)
- Georgia: Georgia Power Rules and Regulations for Electric Service, Section E.4 and E.9 (January 2023); Ga. Comp. R. & Regs. ch. 515-3 (PSC general rules) and O.C.G.A. §46-4-160.2 (gas marketers)
- Massachusetts: 220 CMR 26.00 (non-residential customer rules) and each utility's DPU-approved terms and conditions
- Louisiana: Entergy Louisiana electric Terms and Conditions and legacy ELL Service Regulations, Rule 18; House Bill 478 (2026), enacted as Act 553; LPSC orders case by case
- Oklahoma: OAC 165:45-5-2 (gas meter error); electric billing rules in OAC 165:35 subchapter 19
- Kansas: Evergy Kansas Central General Terms and Conditions, Section 4.05.09 (Correction of Erroneous Bills); No statewide refund rule found in KCC regulations; KCC-approved utility tariffs govern, e.g. Kansas Gas Service General Terms and Conditions §9.02.05
- Nevada: NV Energy Rule 5(H) on billing-error adjustments, as cited by PUCN staff, and a 2025 state law requiring full refunds of overcharges (reporting on the bill)
- New Mexico: 17.9.560.12 NMAC (electric, non-residential service standards) and 17.10.650 NMAC (gas)
- South Dakota: ARSD 20:10:17:06 and 20:10:17:07 (gas and electric billing rules, as amended in the Commission's 2010 rulemaking)
- North Dakota: N.D. Admin. Code 69-09-02-12 (electric meter errors); refunds under 69-09-02-13; gas meter errors under 69-09-01-23
- Idaho: IDAPA 31.21.01.203 (Utility Customer Relations Rule 203) and Idaho Code §61-642, as applied in IPUC Order No. 28298
- Montana: NorthWestern Energy Montana Electric Tariff, Rule No. 10 (Billing), section 10-6; ARM 38.5.901 and 38.5.902 (billing errors) and each utility's PSC-approved tariff
- Wyoming: Wyo. Stat. §37-2-218 (refund of excess charges)
- Maine: 35-A M.R.S. §1308 and MPUC Chapter 815, §8
- Rhode Island: 815-RICR-30-00-1.7.5 (meter billing adjustments) and PUC orders
- Mississippi: Entergy Mississippi Service Policy (meter testing and bill adjustment); 39 Miss. Code R. 3-1-10 (PSC billing and meter-adjustment rule) and PSC orders
- Delaware: Delmarva Power P.S.C. Del. No. 8 - Electric, Rules and Regulations Section IX (Adjustment of Charges), tariff effective September 1, 2026; PSC Docket No. 20-0217
- Hawaii: Hawaiian Electric companies' tariff Rule No. 11, Section C, as described in the companies' 2015 filing with the Hawaii PUC
- Nebraska: 291 Neb. Admin. Code ch. 9, §017.09A (natural gas); electric utilities set their own rules
- Vermont: Green Mountain Power Terms and Conditions for Electric Service, Tariff V.P.U.C. 10 (effective June 21, 2025); Vermont PUC Rules 3.300 and 3.400 and each utility's PUC-approved tariff, e.g. Green Mountain Power's Tariff V.P.U.C. 10
- West Virginia: Appalachian Power P.S.C. W.Va. Tariff No. 16 (searched in full); W. Va. Code R. 150-3 (PSC rules for electric utilities) and each utility's PSC-approved tariff
- Pennsylvania PUC national list of utility commissions
Refunds recover the past; energy procurement and correct account setup lower the future. For portfolios in many states, see multi-site energy management.