Paper mills, converting plants and corrugated box plants buy large volumes of natural gas for steam and electricity for motor-driven lines, and mills with their own generation also pay for standby service from the grid. We audit those electricity and natural gas bills against the tariffs that govern them, off-site and on contingency, and recover what should not have been billed.
01 / 07
Why utility costs matter in paper and packaging
Paper is one of the most energy-intensive industries in the US. Its industry association ranks purchased energy among the largest costs of running a mill, and the US Energy Information Administration (EIA) groups paper with chemicals and petroleum as the three subsectors that use most manufacturing energy.
- 3rd largest
- Purchased energy is the third-largest operating cost for the paper and wood products industry, according to the American Forest & Paper Association (AF&PA).
- Nearly 77%
- Share of US manufacturing energy used in 2022 by three subsectors: chemicals, petroleum and coal products, and paper (EIA).
- 617 trillion Btu
- Natural gas burned as fuel by the US paper subsector in 2022, against 170 trillion Btu of net electricity, out of 2,003 trillion Btu of total fuel use (EIA MECS).
- 986 trillion Btu
- Fuel used by paperboard mills alone in 2022, about half of the paper subsector. Paperboard mills make the board used for boxes and cartons.
- 63%
- Share of electricity AF&PA member mills generated themselves in 2020. The rest is bought, often under standby and supplemental tariffs.
Many paper mills run combined heat and power (CHP) plants that burn purchased natural gas, coal or black liquor, a pulping byproduct, to make steam and electricity. AF&PA reports that 63% of the energy used at member facilities in 2022 came from biomass. That makes mill bills unusual: a mill may buy relatively little grid energy, yet pay large fixed charges to keep grid capacity on call.
Converting and box plants look different. They usually buy all their electricity and run corrugators on steam from gas-fired boilers. A packaging company with a dozen box plants can have a dozen utilities, each with its own schedules and riders.
02 / 07
How mills and box plants are billed
These tariff features decide most paper and packaging bills.
| Tariff feature | What it means | Where it goes wrong |
|---|---|---|
| Standby or partial requirements service | Service for plants that generate on-site. Usually a reservation or contract demand charge for capacity on call, plus a charge on standby power actually used. | Contract demand not updated after a generator is derated, rebuilt or retired, or as-used charges billed for the wrong hours. |
| Demand ratchet | A minimum demand charge set by a past peak. EPA describes a typical ratchet as billing a share of the peak for each of the following 11 months. | A generator trip or restart sets a grid peak that the ratchet then carries for a year, sometimes when the tariff says it should not. |
| Service voltage | Mills taking primary or transmission voltage often qualify for lower rates. | Account billed at the wrong voltage level or with loss adjustments applied twice. |
| Power factor | Some tariffs add a charge or raise billed demand when power factor drops. Large motor loads, common on paper machines and converting lines, lower it. | Charge applied after correction equipment was installed, or based on a faulty reading. |
| Interruptible or curtailable service | Lower electric or gas rates in return for cutting load when the utility calls. | Credits missing, penalties billed for events the plant was not called for, or a plant left on terms it no longer meets. |
| Gas transportation and large-volume schedules | Large boiler loads can buy gas from a marketer and pay the utility only for delivery, on firm or interruptible terms. | Plants left on sales or general-service schedules, or balancing and capacity charges billed incorrectly. |
| Therm factor and pressure base | Factors that convert metered gas volume into billed energy. | A wrong heat content or pressure factor repeats on every bill until someone checks it. |
Illustrative example, not a client result
A mill's standby contract was set at 20 MW when its turbine generator was installed. After a rebuild, the unit's net capacity falls to 15 MW, but no one updates the contract. The mill keeps paying a reservation charge on 5 MW of capacity it can no longer need from the grid as backup. Whether that is recoverable depends on the tariff and contract terms.
03 / 07
Where paper and packaging companies overpay
The errors we look for first on mill and plant accounts.
Standby charges on outdated terms
Reservation demand that no longer matches the generator, or standby energy billed when the unit was running.
Demand and ratchet errors
Billed kW that does not match interval data, or ratchets set by outage peaks the tariff excludes. See demand charge errors.
Boiler gas on the wrong schedule
Steady, high-volume boiler load left on a general-service or sales schedule instead of a large-volume or transportation schedule. See rate misclassification.
Gas conversion factors
Heat content or pressure factors that do not match the utility's published values for that meter.
Power factor charges
Charges that continue after capacitors were added, or that use the wrong calculation from the tariff.
Meter multiplier errors
After a new line or a service upgrade, the multiplier on the bill must change with the metering equipment. See meter multiplier errors.
Capacity and transmission tags
In some markets, load during a few system peak hours sets a year of capacity cost. A generator outage on one of those hours can inflate the tag. See capacity tag errors.
Account classification
Converting plants set up as commercial accounts, so industrial rates and riders never apply. See corporate classification errors.
Acquired and closed plants
Box plants bought or closed in a consolidation that keep the previous owner's setup, or keep billing after shutdown. See site changes.
04 / 07
What we have found in comparable plants
We have not published a paper and packaging case study. The closest comparable results come from other energy-intensive, multi-plant manufacturers with the same tariff features: large gas loads, demand-billed electric service and plants in several states.
At a national steel company that already had an energy manager, an independent audit found 17 misclassified accounts in 7 states. One natural gas account in San Antonio, Texas was billed on Schedule G when it qualified for large-volume Schedule LVG, a difference of $33,554 a year on that account.
Total documented savings for comparable multi-site industrial clients:
| Industrial equipment and precision medical, 56 locations | $1,778,902 |
| Metal coating and galvanizing, 60 locations | $421,845 |
Since 2000, recoveries have most often equaled 3% to 15% of annual utility spend, depending on the utilities and billing history. Read the steel company case study or all case studies.
05 / 07
How an audit works for a mill or plant network
The audit is an off-site review of bills, interval meter data, tariffs and, for mills with generation, standby agreements. There is no hardware, no site visit and no production interruption.
Accounts and authorization
You send a list of accounts or one recent bill per plant, and sign a letter of authorization (LOA) so we can request billing history and meter data from each utility.
History and tariff review
We review 36 to 48 months of electricity and natural gas bills against the tariffs and agreements in force at the time.
Findings
First findings usually arrive in 30 to 60 days, each tied to the tariff section and bill lines behind it. No change is made to any account without your written approval.
Claims and corrections
We file claims and move accounts to the correct terms. Refunds usually take a further 60 to 120 days. How far back a refund can go is set by each state and utility, typically 1 to 5 years.
What to gather
- Plant list with utilities and account numbers, mills and converting plants marked
- Standby, interconnection or interruptible agreements, with generator ratings and any derates
- Gas transportation contracts and the marketer for each plant
- Major changes in the last five years: machine rebuilds, boiler changes, new lines, closures
The fee is contingent: usually 15% to 50% of refunds and verified savings, paid only when you receive them. Utilities never pay us. A 15-account pilot audit or a free rate class check is available to test the process.
06 / 07
After the audit
The audit can be engaged on its own. Where clients want more, the corrected account inventory supports:
- Energy procurement for plant electricity and boiler gas in deregulated markets, with any supplier commission disclosed up front.
- Utility bill pay for every plant, with a 30 to 45 day transition and cost allocation to plants or product lines. Water and sewer bills can be included in bill pay.
- TaraBase reporting on savings, usage and contracts, including Scope 2 data from purchased electricity.
- Utility Cost Intelligence to catch new errors as machines, boilers and generators change.
07 / 07
Questions buyers ask
Fees, results, and how an audit fits beside the broker or energy manager you already have.
Do you audit mills with on-site generation?
Yes. Standby and supplemental charges are checked against the tariff and your contract demand, along with any ratchets set by generator outages.
Could our boiler gas move to transportation or interruptible service?
It depends on the utility, the plant's volume and whether it can run on backup fuel or curtail. The audit checks eligibility and setup for every gas account and shows the tariff terms behind each option.
Do you have a paper and packaging case study?
Not a published one. The results on this page come from comparable multi-plant manufacturers and are labelled that way.
Are box plants big enough to audit?
Often, yes, as part of a network. Box plants are demand-billed, burn boiler gas and change hands in consolidations, so the same error tends to repeat.
Does the audit need a site visit?
No. It works from bills, meter data, tariffs and agreements obtained under a letter of authorization. Production is not interrupted.
What does it cost?
Nothing upfront. The fee is usually 15% to 50% of refunds and verified savings, paid only when you receive them. See pricing.
Sources
- American Forest & Paper Association, Facts about energy use and the paper industry, purchased energy as third-largest operating cost; biomass and self-generation shares.
- US EIA, Use of energy explained: energy use in industry, three subsectors at nearly 77% of 2022 manufacturing energy; paper mill CHP fuels.
- US EIA, 2022 Manufacturing Energy Consumption Survey, Table 3.2, fuel consumption, paper subsector and paperboard mill fuel use by source.
- US EPA Combined Heat and Power Partnership, Standby Rates for Customer-Sited Resources (2009), standby charge structure and the typical 11-month ratchet.
Find out what your bills should have cost.