Massachusetts natural gas case study, Worcester, Massachusetts. November 2026
Worcester gas capacity: the utility's plan shows a design day deficiency every year
NSTAR Gas's plan shows its design day exceeds its resources in each forecast year, by 23.5 BBtu in 2024-25 and 46.8 BBtu in 2028-29 for four divisions together, mostly on the pipeline serving Worcester; state regulators found supplies adequate.
Metro used: the Worcester, MA metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). The gas utility identified in the record is NSTAR Gas Company, doing business as Eversource Energy (NSTAR Gas), whose territory includes a Worcester division served by Tennessee Gas Pipeline. Its plan gives most figures for its four divisions together, so those figures are system-wide and labeled that way.1
Key takeaways
- NSTAR Gas's July 2024 plan uses a 1:50 design day standard; the Department recorded 88 equivalent degree days for Worcester and Framingham.2
- The Department's July 2025 order found NSTAR Gas can reasonably be expected to secure incremental supplies, and directed its next plan by July 17, 2026.4
- NSTAR Gas has contracts for 40,000 MMBtu per day of Tennessee Gas Pipeline capacity to its Upland Street station in Worcester but says it lacks sufficient long haul capacity.3
- We found no planned gas-fired generator in Worcester County in EIA's September 2026 inventory and no Federal Energy Regulatory Commission (FERC) notice naming it since 2025.6
What is the outlook for Worcester gas capacity through 2029?
Discovery Energy rates the outlook for Worcester-area natural gas capacity through 2029 as Elevated (confidence: Medium): NSTAR Gas's own plan shows its design day exceeding its resources in every forecast year, for its four divisions together, mostly on the Tennessee Gas Pipeline system that serves Worcester. The plan fills the gap with winter service supplies, and the record shows no contract tying the Constellation LNG volumes to the Worcester division's gap. The Department found in July 2025 that NSTAR Gas can reasonably be expected to secure incremental supplies.
Documented risk factors: we counted none beyond the design day deficiency itself.
Three developments would change the assessment: NSTAR Gas's next forecast and supply plan (due July 2026, not yet read), the plan now before the Department as D.P.U. 26-94, and the Department's orders on them; any contract for the incremental winter supplies on the Tennessee Gas Pipeline system; the end of the Constellation LNG contract on May 31, 2030.
Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.
Who serves the Worcester area?
NSTAR Gas said its territory has four major operating divisions: Worcester, Framingham, Cambridge and New Bedford. It said Worcester is served by Tennessee Gas Pipeline, and that its Hopkinton LNG facility sits on the boundary between its Framingham and Worcester divisions. Eversource Gas Company of Massachusetts (EGMA) was checked; its plan names no Worcester division. Other gas utilities in Worcester County are not shown in the record.1
| Where | Item in NSTAR Gas's plan |
|---|---|
| Inside the metro | The Worcester division, served by Tennessee Gas Pipeline, including its Upland Street take station in Worcester |
| Outside the metro, but part of NSTAR Gas's system | The four-division totals (design day sendout, deficiency); the Framingham, Cambridge and New Bedford divisions served by Algonquin; the Constellation LNG contract |
| Unclear | The towns in the Worcester division; other gas utilities in Worcester County; Windham County, Connecticut (outside the OMB county list) |
Source: Forecast and Supply Plan, D.P.U. 24-106.1
Only the location of the deficiency, mostly the Tennessee Gas Pipeline system, points to the Worcester division; the plan gives no Worcester-only design day or deficiency, so the four-division figures describe NSTAR Gas's whole system. The other divisions and the Constellation LNG contract are outside the metro but matter because NSTAR Gas says it plans to address its shortfall with supplies from Constellation LNG at Everett.3
How much spare gas capacity does Worcester have on the coldest day?
In words: what the map shows
- Pipelines labeled: Tennessee Gas Pipeline; Algonquin.
- Metro counties outlined (1): Worcester County.
- Cities and towns labeled include: Boston; Worcester; Providence; Springfield; Hartford; Lowell; Manchester; Waterbury.
- Other gas pipelines in the area are drawn in gray and are not labeled.
- Highways are drawn for orientation. A small state locator map sits in a corner.
NSTAR Gas plans for a 1:50 design day, the cold day its plan is built to serve.2 For its four divisions together, its base-case design day resources fall short of the design day in each of the five forecast years, and the plan fills the gap with winter service supplies.3
| Gas year | Design day sendout (BBtu) | Winter service supplies filling the gap (BBtu) |
|---|---|---|
| 2024-25 | 544.8 | 23.5 |
| 2025-26 | 550.2 | 28.9 |
| 2026-27 | 556.2 | 34.9 |
| 2027-28 | 562.1 | 40.8 |
| 2028-29 | 568.1 | 46.8 |
NSTAR Gas's base-case design day adequacy, BBtu, four divisions together, per NSTAR Gas. Source: Forecast and Supply Plan, D.P.U. 24-106, Figure 47.
By our calculation, the winter service supplies are 4.3% of the design day sendout in 2024-25 and 8.2% in 2028-29 (the plan states no share). The plan says the deficiency is mostly on the pipeline that serves Worcester, the Tennessee Gas Pipeline system, and NSTAR Gas's SENDOUT design-weather run for 2024-25 shows system unserved of zero, a modeled result for its whole system; the plan maintains a design hour criterion, the peak hour on a design day, but gives no hourly requirement and no take-station balance, so spare capacity at the Worcester gate stations is not shown here.3
What is driving new natural gas demand?
We found no documented new gas load with a service date in Worcester County. The passages of NSTAR Gas's plan we reviewed for this page name no large new gas load there.1
EIA's September 2026 generator inventory lists no planned natural gas-fired generator in Worcester County, and a search of Federal Register notices of FERC since January 1, 2025 found no pipeline notice naming the county.6 EIA lists one retirement in the county since 2024, a 6.3 MW industrial natural gas steam turbine retired in December 2024 that no record we reviewed ties to NSTAR Gas's system.9
Data centers: As of October 29, 2026, we found no data center gas load in Worcester County, whether served by NSTAR Gas, bypassing it with its own gas supply, or electric-only. Air permit, grid operator queue and local siting records are not in the files we could read, so a project there could be missed.10
Nearby: The FERC notices we reviewed since July 31, 2026 for Tennessee Gas Pipeline and Algonquin name no new load in Massachusetts.11
Are upgrades arriving in time?
NSTAR Gas said the deficiency for its four divisions together would be addressed with additional supplies, and that it plans to address its shortfall with supplies from Constellation LNG at Everett Marine Terminal. The record shows no contract tying the Constellation volumes to the Worcester division's gap. The Constellation LNG peaking contract approved on May 17, 2024 has a total maximum daily quantity of 15,000 Dth and runs through May 31, 2030; its volumes serve the New Bedford, Plymouth and Cambridge areas or the pipeline at Everett, not Worcester directly.3
The Department directed NSTAR Gas to file its next plan by July 17, 2026; that plan is not in the record we reviewed for this page.4
Winter and market context
NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 discussion puts the highest odds of warmer than normal conditions over, among other areas, the interior Northeast; the discussion names regions, not counties.B1
We found no FERC notice since July 31, 2026 that bears on NSTAR Gas's Worcester division; the Tennessee Gas Pipeline and Algonquin filings we reviewed concern rates, compliance and a Texas project.11 Either pipeline's own informational postings are not covered here, so we do not know of any operating notices.
Winter weather and NOAA's outlook
Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal at the Worcester Regional Airport station in 2023-24 and 2024-25 and above it in 2025-26.12 NOAA's October 15, 2026 outlook gives the Worcester area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and at least 50% for December 2026 to February 2027.13 The airport is one station, and NOAA's figures are three-month probabilities, not forecasts of specific days.14
| Winter (November to March) | Heating degree days | 1991-2020 normal | Difference from normal |
|---|---|---|---|
| 2023-24 | 4390 | 5074 | -13.5% |
| 2024-25 | 4733 | 5074 | -6.7% |
| 2025-26 | 5279 | 5074 | 4.0% |
Heating degree days at the Worcester Regional Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.
What's new (as of October 29, 2026)
NSTAR Gas's long-range forecast and supply plan for November 2026 through October 2031 is before the Department as D.P.U. 26-94, filed October 30, 2025, with a public hearing on October 6, 2026; the filings we reviewed do not include the plan itself.7 On August 26, 2026 FERC staff issued an environmental assessment for the Constitution Pipeline and Wright Interconnect projects in Pennsylvania and New York, which mentions a delivery meter to the Tennessee Gas Pipeline but does not name NSTAR Gas or Massachusetts.8
What should Worcester-area facilities check now?
- Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff and that riders, demand and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
- Which utility and which service. Confirm which gas utility serves each site, whether it takes firm or interruptible service, and the interruption terms in the current approved tariff.
- Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible and fuel and resupply are in place before December.
- Upcoming proceedings. Track NSTAR Gas's 2026 plan, the D.P.U. 26-94 proceeding and the Department's orders.
What to check in your contracts
| Area | What to check |
|---|---|
| Winter price spikes | Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes. |
| Delivery constraints | Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first. |
| Operational flow orders | What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you. |
| Expansion plans | Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date. |
Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.
Frequently asked questions
Will Worcester businesses face natural gas shortages this winter?
The record does not show a shortage, and this page predicts no outages. NSTAR Gas projects a design day deficiency for its four divisions together in each forecast year; the Department found it can reasonably be expected to secure incremental supplies. See 'How much spare gas capacity does Worcester have on the coldest day?'
Is there spare gas capacity in the Worcester area on the coldest day?
NSTAR Gas's plan shows a design day deficiency for its four divisions together in every forecast year and gives no Worcester-only margin. See 'How much spare gas capacity does Worcester have on the coldest day?'
Which utility serves Worcester, and does the EGMA plan cover it?
The NSTAR Gas plan names a Worcester division served by Tennessee Gas Pipeline; EGMA's plan names no Worcester division, and other utilities in Worcester County are not shown. See 'Who serves the Worcester area?'
Did the Department approve NSTAR Gas's plan?
The Department's July 2025 order found NSTAR Gas has adequate supplies for its expected requirements and can reasonably be expected to secure incremental supplies under design conditions. See 'Are upgrades arriving in time?'
Is a data center or power plant driving gas demand in Worcester?
The record does not show one. See 'What is driving new natural gas demand?'
Related case studies
Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.
- Boston natural gas capacity case study (outlook: High)
- Poughkeepsie-Newburgh area natural gas capacity case study (outlook: High)
- Albany natural gas capacity case study (outlook: Elevated)
- New York City and Westchester natural gas capacity case study (outlook: Elevated)
- Pennsylvania UGI Gas territory natural gas capacity case study (outlook: High)
All gas capacity ratings by U.S. metro
Background for commercial and industrial energy buyers: Utility cost intelligence
Understand your capacity exposure
Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.
Schedule a reviewWhat this page does not cover
- Whether Worcester-area gas supply has been disrupted since 2020. We found no event in an official record.
- How costs are split among customer classes, and the interruption order. The tariff is not covered here.
- Which towns the Worcester division covers, and whether Unitil, National Grid or another utility serves part of Worcester County. The record we reviewed does not say.
- NSTAR Gas's 2026 forecast and supply plan. It was due July 17, 2026 and is not covered here.
Notes
- NSTAR Gas Company d/b/a Eversource Energy, Forecast and Supply Plan, Massachusetts DPU D.P.U. 24-106 (filed July 19, 2024), service territory pages and PDF 93 (Hopkinton LNG and the Worcester division). Utility statements. The metro's county, Worcester County (CBSA 49340), is from the OMB 2023 delineation; our classification of plan items by whether they fall inside the metro is kept with the case study. EGMA (D.P.U. 23-125) checked and excluded: its saved plan has no Worcester text. Windham County, Connecticut: not in the OMB 2023 county list for CBSA 49340; Yankee Gas (Eversource Connecticut) serves part of Windham County (a search lead, not saved); Connecticut Natural Gas's website timed out on its robots check and was not fetched. EGMA's plan names the Brockton, Lawrence and Springfield divisions. Windham County, Connecticut is outside this page. ↩
- Same plan, PDF 14 (design day standard) and Massachusetts DPU, Order on D.P.U. 24-106 (July 14, 2025), PDF 7 and 36. Department finding. The standard of 88 equivalent degree days (EDDs) is the Department's record of the design day for the Worcester and Framingham divisions. ↩
- Same plan, PDF 93, 98, 101, 103, 104, 106 and 377 (Figure 47 and related text; SENDOUT run). Shares are our calculation (illustrative): 23.5 divided by 544.8 is 4.3% and 46.8 divided by 568.1 is 8.2%; the EMT contract's 15,000 Dth per day is 2.75% of the 2024-25 design day. The document was saved for the Boston case study from a manual DPU download. In its high growth case discussion the plan says the Tennessee Gas Pipeline deficiencies would be purchased at either Dracut or Everett and transported on the pipeline's Zone 6 to Zone 6 capacity. ↩
- Massachusetts DPU, Order on D.P.U. 24-106, PDF 35 and 36. Department finding. ↩
- The Constellation LNG contract and the Algonquin-system items belong to other NSTAR Gas divisions; they are system-wide items outside the metro, and the plan does not tie them to the Worcester division.
- EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to Worcester County, and a Federal Register search of FERC notices since January 1, 2025 by county phrase. A notice that spells a place differently would be missed. ↩
- Massachusetts DPU, Notice of Filing, Public Hearing, and Request for Comments, D.P.U. 26-94, dated August 10, 2026, PDF 1 (Long-Range Forecast and Supply Plan for the five-year period of November 1, 2026, through October 31, 2031; petition filed October 30, 2025; virtual public hearing on Tuesday, October 6, 2026 at 2:00 p.m.) and PDF 2 (the Attorney General filed a notice to intervene and asked to spend up to $150,000 on experts). Accessed October 19, 2026. The notice gives no plan figures, so we do not know the plan's design day or deficiency numbers, and the notice does not say that this plan is the one the Department directed for July 17, 2026. ↩
- Federal Register, FERC Notice of Availability of the Environmental Assessment for the Proposed Constitution Pipeline and Wright Interconnect Projects, document 2026-17399, published August 26, 2026, pages 55089-55090 (dockets CP13-499-006 and CP13-502-003); the last bullet on page 55090 refers to "modification and upgrade of the existing delivery meter to the Tennessee Gas Pipeline or construction of a new delivery meter." The notice says the assessment is not a decision document and does not name NSTAR Gas or Massachusetts. ↩
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, Retired sheet, row 313 (Newark America Mill, plant ID 57103, industrial combined heat and power, 6.3 MW natural gas steam turbine, in service February 2007, retired December 2024). The Operating and Planned sheets were also read for Worcester County; the Planned sheet lists no planned gas unit there. ↩
- Federal Register API search of FERC notices published July 31 to October 29, 2026 for "Worcester County, Massachusetts," "Worcester, Massachusetts," "NSTAR Gas," "Upland Street" and "Hopkinton LNG" (no hits), with EIA-860M (note 9) and the plan text. Not searched or not saved: Massachusetts Department of Environmental Protection air permits, ISO New England queue entries by county, Massachusetts Environmental Policy Act filings and town planning records (the state's site returns an error to automated requests). ↩
- Federal Register, FERC notices published July 31 to October 29, 2026 that name Tennessee Gas Pipeline or Algonquin Gas Transmission: documents 2026-15770 (August 4), 2026-15976 (August 6), 2026-18147 (September 4), 2026-20217 (October 2), 2026-20747 (October 9), 2026-20853 (October 13) and 2026-21188 (October 16), which are Combined Notices of Filings listing negotiated rate agreements, a NAESB compliance filing and Algonquin's September 2026 operational flow order penalty disbursement report; 2026-18995 (September 16; South Texas Enhancement Project, docket CP26-540-000) and 2026-21075 (October 15; Line 20M-100 pressure reduction in Harris County, Texas, docket CP27-2-000). The two Eversource hits (2026-16172 and 2026-21987) concern electric transmission and ISO New England filings. ↩
- NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Worcester Regional Airport (station USW00094746). Sums are our calculation. Heating degree days behind the percentages: 4390 in 2023-24, 4733 in 2024-25 and 5279 in 2025-26, against a 1991-2020 normal of 5074. ↩
- NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Worcester location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for November 2026 to January 2027 Worcester has at least a 40% chance of above-normal temperatures, about 33% near-normal and no more than 26.7% below-normal, and for December 2026 to February 2027 at least 50%, about 33% and no more than 16.7%. ↩
- The station is Worcester Regional Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
- EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and its October 2026 Short-Term Energy Outlook says prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. NOAA's Climate Prediction Center puts the probability of at least a strong El Nino continuing through January to March 2027 at 80%. These are national and regional facts, not statements about NSTAR Gas's system.
Market and weather sources
Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.
- A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
- A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
- B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
Sources
- NSTAR Gas Company d/b/a Eversource Energy, Forecast and Supply Plan, D.P.U. 24-106 (filed July 19, 2024). Massachusetts Department of Public Utilities file room .
- Massachusetts Department of Public Utilities, Order on D.P.U. 24-106 (July 14, 2025), and Joint Order on D.P.U. 25-133 and 25-134 (January 30, 2026). Massachusetts Department of Public Utilities file room .
- Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
- Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
- Massachusetts Department of Public Utilities, D.P.U. 26-94 Notice of Filing, Public Hearing, and Request for Comments (August 10, 2026). DPU File Room, docket 26-94 (exact link not recorded)
- NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00094746 (Worcester Regional Airport). Link
- Federal Register (FERC notice), Constitution Pipeline Company, LLC, Iroquois Gas Transmission System, L.P.; Notice of Availability of the Environmental Assessment for the Proposed Constitution Pipeline and Wright Interconnect Projects, Federal Register document 2026-17399, published August 26, 2026. Link
Corrected November 9, 2026: An earlier version said the record shows no contract for the incremental winter supplies; the record shows a Constellation LNG contract of 15,000 Dth per day, which the plan does not tie to the Worcester division's gap, and the page now says that. The page also now states that the design day deficiency is for NSTAR Gas's four divisions together, not for Worcester alone.