New York natural gas case study, New York City and Westchester. November 2026

New York City and Westchester gas capacity: no reserve margin, 4% delivered services

Con Edison and O&R said in May 2025 that their gas systems have no reserve margin for loss of supply on a peak day; their November 2023 plan shows delivered services at 4% of peak demand in winter 2026-2027.

4%Delivered services as a share of peak demand, winter 2026-2027, Con Edison and O&R joint system, 2023 plan
1,635 MDtCon Edison's actual peak day load, December 2025, Con Edison system, per Con Edison and O&R
62,500 Dt per dayIroquois ExC capacity for Con Edison's Hunts Point citygate, per the 2023 plan; not yet in service
No reserve marginCon Edison and O&R design basis is N-0, not N-1, per their May 2025 update

Metro used: the part of the New York-Newark-Jersey City, NY-NJ metropolitan statistical area (OMB Bulletin No. 23-01, July 21, 2023) served by Consolidated Edison Company of New York, Inc. (Con Edison) and Orange and Rockland Utilities, Inc. (O&R), whose records are the New York Public Service Commission's (the Commission's) Case 23-G-0147.7 That is New York, Bronx, Westchester and Rockland counties and part of Queens County; the other New York counties are on other pages.

Key takeaways

  • They assume all supply resources are available on a design day; losing an interstate pipeline, compressor station or gate station is likely to cut gas to firm customers.1
  • The plan projects delivered services falling to 5 MDt per day by winter 2028/2029 with both projects; they grew to 18% of peak demand needs in winter 2019/2020.1
  • Tennessee East 300, 115,000 Dt per day, was fully in service on November 16, 2023, allowing the Westchester moratorium in place since March 15, 2019 to be lifted.1
  • National Grid said in May 2026 that Iroquois is awaiting a Connecticut permit for ExC.4
  • The plan's first peak demand series gives 1,945 MDt per day jointly for 2027 by our calculation.1
  • The updates give actual peak day loads but do not state either as a share of design day.1

What is the outlook for New York City and Westchester gas capacity through 2029?

Discovery Energy rates the outlook for New York City and Westchester natural gas capacity through 2029 as Elevated (confidence: Medium): Con Edison and O&R design their gas systems with no reserve margin, so losing one supply source could cut gas to firm customers. They rely on delivered services for 4% of peak demand in winter 2026-2027, a thin margin. No further fix is approved or scheduled: East 300 is already in service, and as of National Grid's May 2026 update ExC was still awaiting its Connecticut permit. These figures are for the whole systems.

Documented risk factors: one recent supply event, Winter Storm Elliott in December 2022. We count it as a single factor.

Three developments would change the assessment: the Connecticut permit, construction and in-service dates for ExC against the November 2027 date National Grid gave, and the May 2027 annual update; any numeric statement of Con Edison's design day supply stack and reserve; any Commission action on a moratorium or reserve margin, or a repeat of the supply cuts of Winter Storm Elliott.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the New York City and Westchester area?

The table sorts the record by place, using each utility's territory statement, the Department of Public Service county table and the county lists in the notes. None of the filings allocates its figures to counties.12

Where Utility and what this page covers
New York (Manhattan), Bronx and Westchester counties Con Edison: long-term plan, 2025 and 2026 updates, Commission order of September 2024 and PA Consulting's report, system-wide and joint with O&R
Queens County, part Con Edison and National Grid both listed; places inside Queens are not assigned (National Grid's record is on the Brooklyn, Queens, Staten Island and Long Island page)
Rockland County O&R: Rockland system, covered by the same joint plan and order; Sloatsburg is in Rockland County
Putnam County Central Hudson Gas & Electric Corporation (Central Hudson) and New York State Electric & Gas Corporation listed; Central Hudson's Carmel gas-only district is in Putnam County; no Putnam figure read
Kings and Richmond counties On the Brooklyn, Queens, Staten Island and Long Island page; the sources differ on Richmond and Kings

Utility records sorted by place. Source: utility filings in the Notes; Department of Public Service county table (October 2022); USGS GNIS.2

Con Edison says it provides gas service in Manhattan, the Bronx, portions of Queens and portions of Westchester County, which gives New York, Bronx and Westchester counties and part of Queens County; O&R delivers gas through two separate systems, one of them in Rockland County.1

Queens County is split: Con Edison says it serves portions of Queens, PA Consulting says National Grid's KEDNY serves parts and KEDLI the Rockaway Peninsula, and the county table lists both utilities. The record we reviewed does not split Queens by neighbourhood and this page does not assign places inside it.2

Brooklyn (Kings County) and Staten Island (Richmond County) are covered on the Brooklyn, Queens, Staten Island and Long Island page: PA Consulting says KEDNY serves them, while the county table lists Con Edison for Richmond County and our crosswalk built from EIA Form EIA-176 lists Con Edison for Kings and Richmond, so the sources differ and neither page assigns their gas utility beyond stating this.2

Putnam County is listed in the county table for Central Hudson and New York State Electric & Gas Corporation; Central Hudson's gas-only Carmel district is in Putnam County, and its Mahopac Gate is in Somers, Westchester County.3 Central Hudson's record is system-wide and is covered on the Poughkeepsie-Newburgh page; Putnam County stays a partial gap here, as does Orange and Rockland's territory beyond Rockland County, covered on that page. Northern New Jersey is on the Northern New Jersey page.

The figures below are system-wide plans that the utilities and the Commission do not allocate by county, so they describe the joint Con Edison and O&R system, not any one borough or county; they are the most local figures the record has, which is why confidence is Medium. Pipelines and the Connecticut permit for Iroquois ExC sit outside the area but matter because the plan says ExC would add capacity for Con Edison's Hunts Point citygate.1

Has New York City and Westchester had gas supply problems since 2020?

The record documents one event in this area's winters. In December 2022, during Winter Storm Elliott, the Commission said National Grid and Con Edison required interruptible customers, including power generators, to move to alternate fuels and coordinated a public appeal to reduce gas use, and that their final action would have been to curtail firm customers.4 Its wording about the 30 minutes before curtailment of 30,000 customers is about National Grid and is on the Brooklyn page.

The Con Edison and O&R updates read report no later supply event. In its November 2023 plan O&R said that, at the moment, it does not have any gas supply constraints, after describing a 2020 concern in the Sloatsburg area about firm service to two potential large customers that had not materialized.1 The record we reviewed contains no Commission finding of a deficiency for Con Edison or O&R.

How much spare gas capacity does New York City and Westchester have on the coldest day?

Pipelines supplying the New York City and Westchester area N Tennessee Gas Pipeline Tennessee Gas Pipeline Iroquois Gas Transmission Iroquois Gas Transmission Transco Transco Texas Eastern Texas Eastern Iroquois Gas Transmission Iroquois Gas Transmission Tennessee Gas Pipeline Tennessee Gas Pipeline Transco Transco New York University Central Plant New York University Central Plant Yonkers Yonkers Bronx Co. Bronx Co. New York Co. New York Co. Putnam County Putnam County Queens Co. Queens Co. Rockland Co. Rockland Co. Westchester County Westchester County Newark Newark Paterson Paterson Bridgeport Bridgeport Elizabeth Elizabeth Stamford Stamford New Haven New Haven Waterbury Waterbury Norwalk Norwalk I-95 I-95 I-84 I-84 I-87 I-87 I-495 I-78 I-287 CT 15 NY 17 I-91 CT 8 NJ GSP I-80 NY SSP I-684 I-195 NJ 18 NY 27 US-6 NY SBP I-276 NY PIP Dutchess County Dutchess County Northwest Hills Northwest Hills Orange County Orange County Suffolk County Suffolk County Sullivan County Sullivan County Sussex County Sussex County Ulster County Ulster County Western Connecticut Western Connecticut Pipelines supplying the New York City and Westchester area Other gas pipelines Highways New York City and Westchester metro area (6 counties) County lines Cities and towns Gas-fired power plant named on this page
Figure 1. Major natural gas pipelines serving New York City and Westchester. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Form EIA-860 (2025).

In words: what the map shows

  • Pipelines labeled: Tennessee Gas Pipeline; Texas Eastern; Transco; Iroquois Gas Transmission.
  • Gas-fired power plants marked: New York University Central Plant.
  • Metro counties outlined (6): Bronx County; New York County; Putnam County; Queens County; Rockland County; Westchester County.
  • Cities and towns labeled include: Newark; Yonkers; Paterson; Bridgeport; Elizabeth; Stamford; New Haven; Waterbury.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

The Commission's September 2024 order says Con Edison and O&R have 77 individual pipeline and storage contracts in service providing 1,794 MDt per day of capacity to their gate stations, and that they expect firm design day demand to peak in about 2027 and then begin to decrease.3

The plan's Appendix B lists peak demand forecast series for Con Edison and for O&R; the text extract does not carry the series labels. The first series, read here as the Reference Case because it peaks about 2027, gives 1,713 MDt per day for Con Edison and 232 for O&R in 2027, 1,945 MDt per day jointly by our calculation.1

The plan's Figure 28, titled "Con Edison and O&R Forecasted Growth Requires No New Citygate Commitments," draws the supply stack against the design peak as an image with no table of values, so a numeric reserve margin is not shown here. The plan says East 300 and ExC together will provide sufficient additional citygate pipeline capacity to reliably meet firm customer peak demand over the full planning horizon.1

Winter Delivered services, East 300 only, MDt per day (share of peak demand) Delivered services, East 300 and ExC, MDt per day (share)
2026-2027 78 (4%) 16 (1%)
2028-2029 67 (3%) 5 (0%)

Con Edison and O&R plan of November 2023, Figure 29, joint system, as printed; the plan lists 0 in both columns from winter 2033-2034.1

The Companies said in May 2025 that their design basis is N-0, not N-1, with no reserve margin for loss of supply on a peak day, and that 100% of gas supply resources are assumed available on a peak design day.1 Con Edison's actual peak day load was 1,635 MDt on December 26, 2025 and O&R's was 218 MDt on February 7, 2026; the update does not state either as a share of design day.1 PA Consulting, the consultant to the Commission's Staff, wrote that for winter 2027-28 either East 300 or ExC must be in service for Con Edison's forecasted design day demand; East 300 has been in service since November 2023.3

What is driving new natural gas demand?

The filings we reviewed name no new large load by customer or service date.1

EIA's September 2026 generator inventory lists two planned natural gas-fired generators in the metro's New York counties, both at New York University's central plant in New York County: about 5.5 MW in total (2.6 MW and 2.9 MW), planned for 2026 and July 2027.5 Our Federal Register search since January 1, 2025 found four notices of the Federal Energy Regulatory Commission (FERC) that name a county of the whole metro (note 18): two on Transco's Northeast Supply Enhancement project naming Queens County, one naming Hudson County and one naming Middlesex County, New Jersey, which no utility on this page serves; none names Con Edison, Orange and Rockland or a gas load.18

Data centers: As of October 29, 2026, we found no data center gas load in the counties this page covers. The New York Independent System Operator's September 30, 2026 queue lists data center requests for electric service in Rockland County, in O&R's area, and one in Westchester County, in Con Edison's area, and the rows give no gas information, so we cannot say whether any would take gas.8 A July 2026 state notice says the Databank Phase II data center in Orangetown, Rockland County, needs a draft environmental impact statement; it lists standby power equipment and names no fuel.9

Nearby: The FERC notices since August 2026 that name Iroquois, Texas Eastern or Millennium are rate and standards filings, and none names a county this page covers or a new gas load.13

Are upgrades arriving in time?

For Con Edison, the Commission's September 2024 order says the Tennessee East 300 project, in service since November 2023, allowed the moratorium on new customer load that began on March 15, 2019 to be lifted, and that the Iroquois ExC project was not yet in service.3 Con Edison and O&R said they do not project the need for any new service moratoria.1

The plan said ExC would add 125,000 Dt per day, split equally between Con Edison's Hunts Point citygate in the Bronx and National Grid's South Commack citygate (62,500 Dt per day for Con Edison), and in November 2023 did not expect it before November 2025 because it lacked all required approvals from the New York or Connecticut environmental agencies.1 National Grid said in May 2026 that Iroquois had the necessary FERC and New York State authorization, was awaiting a Connecticut permit, and that ExC is expected in service for November 2027.4 The Con Edison and O&R updates read give no newer in-service date.

Connecticut's environmental agency (DEEP) gave notice on July 24, 2026 of a second tentative determination to approve air permits for four compressor units at Iroquois's Brookfield station, and a July 27, 2026 hearing officer's report records three hearing petitions filed in September 2025 and an informational hearing on January 8, 2026; neither names ExC.10 A New York environmental agency page, undated, as of October 29, 2026, says the Connecticut air permit for the ExC project was pending.11

The plan also says the on-system Queens Transmission Project, with existing pipeline capacity bought at the Texas Eastern LM citygate, increased the supply portfolio serving the Bronx, mid-upper Manhattan and Queens and decreased reliance on delivered services; it gives no cost.1 The one budget in the record is the $250 million Westchester Clean Energy Investment Program announced in 2019 by NYSERDA, the Commission and the New York Power Authority to reduce demand and accommodate new customers.1

What does this mean for business gas costs?

The record we reviewed states no cost or allocation among customer classes for Con Edison's or O&R's supply resources; its one budget, the $250 million Westchester program, is for demand reduction, not gas supply.1 This page does not cover the rate cases that set cost allocation.

Who gets gas first in a shortage?

The record shows interruptible service ending first in practice. In Winter Storm Elliott National Grid and Con Edison required interruptible customers to move to alternate fuels before the last step of curtailing firm customers.4 This page does not cover the tariffs that set the order of interruption for Con Edison and O&R.

Winter and market context

National layer. NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the Ohio Valley and mid-Atlantic regions, a discussion that names regions and not counties.B1 National inventory, El Nino, liquefied natural gas export and Henry Hub figures do not bear on these systems and sit in a note.17

Regional layer. This area lies in EIA's East storage region, whose working gas EIA's weekly storage table, released October 22, 2026, lists at 900 billion cubic feet for the week ending October 16, 2026; this page does not give the five-year-average comparison that EIA carries in its weekly report.C1 EIA's New York state citygate series, the nearest regional price, shows 8.07 dollars per thousand cubic feet for July 2026, the latest month.C2

Pipeline notices. On the Tennessee Gas Pipeline, whose East 300 project serves Con Edison's Westchester gates, the critical notices list shows pipeline conditions notice 405255, restrictions for the October 27, 2026 timely cycle, listed on October 26, 2026; the list holds only postings dated October 24, 25 and 26, 2026.C4 Notices from the Iroquois pipeline, whose ExC project would serve Con Edison's Hunts Point citygate, and from the Texas Eastern pipeline are not covered here, so they are not shown.

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran 14.0% and 3.5% below the 1991-2020 normal in the winters of 2023-24 and 2024-25 and 6.8% above it in 2025-26 at the Central Park station.14 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the New York City area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027.15 Central Park is one station standing in for the metro, and NOAA's figures are probabilities for a three-month average.16

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 3259 3789 -14.0%
2024-25 3658 3789 -3.5%
2025-26 4047 3789 +6.8%

Heating degree days at the NY City Central Park station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

Policy context

New York City's Local Law 154 of 2021 adds a section to Title 24 of the Administrative Code, under which no person shall permit the combustion of any substance that emits 25 kilograms or more of carbon dioxide per million British thermal units within a building subject to it, with exceptions that include buildings under seven stories with an application on or before December 31, 2023, and buildings of seven stories or more with an application on or before July 1, 2027.P1

A New York State Department of Public Service Staff white paper dated February 27, 2025 on the All-Electric Buildings Act (Part RR of Chapter 56 of the Laws of 2023) says the Act's provisions apply to new buildings seven stories or less, with exceptions, effective December 31, 2025 and will apply to all new buildings effective December 31, 2028, and, as applied by the Code Council, to permit applications substantially complete as of December 31, 2025.P2 The Act's current status was not confirmed from an official source.

What's new (as of October 29, 2026)

On July 24, 2026 Connecticut's environmental agency gave notice of a second tentative determination to approve air permits for four compressor units at Iroquois's Brookfield station.10 A New York environmental agency page, undated, as of October 29, 2026, says the Connecticut air permit for the ExC project was pending, and the Connecticut notice does not name ExC.11 The newest filing on the Commission's list for the Con Edison and O&R plan case is dated May 15, 2026, so we found no new filing there in the past 90 days.12

What should New York City and Westchester facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which service. Confirm whether each site takes firm or interruptible service, since interruptible customers are moved first.
  • Which utility. Confirm whether the site is served by Con Edison, National Grid, O&R or another utility, because the records differ by utility and Queens is served by more than one.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track the in-service date of Iroquois ExC and the annual updates in the Commission's long-term plan case for Con Edison and O&R.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will New York City and Westchester businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. Con Edison and O&R design with no reserve margin; see 'How much spare gas capacity does New York City and Westchester have on the coldest day?'

Is there spare gas capacity in New York City and Westchester on the coldest day?

Con Edison and O&R state no numeric reserve. See 'How much spare gas capacity does New York City and Westchester have on the coldest day?'

What is Iroquois ExC, and when is it expected?

National Grid said in May 2026 that it expects ExC in service for November 2027 and that Iroquois was awaiting a Connecticut permit. See 'Are upgrades arriving in time?'

Did the Commission find a gas supply deficiency in New York City or Westchester?

The record we reviewed contains no Commission finding of a deficiency for Con Edison or O&R. See 'Are upgrades arriving in time?' for what they said about new service moratoria.

Who is cut first if gas service must be curtailed?

In Winter Storm Elliott, interruptible customers moved to alternate fuels before firm customers would have been curtailed. This page does not cover the tariff sequence; see 'Who gets gas first in a shortage?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • How costs are split among customer classes, and who Con Edison and O&R would interrupt first. The record we reviewed does not show the allocation or the tariff interruption sequences.
  • A numeric design day supply stack and reserve margin for Con Edison and O&R. The plan shows the supply stack only as a chart image, so we can't give its figures.
  • O&R's own design day figure. The record we reviewed does not give it separately.
  • Con Edison's own current in-service date for the Iroquois ExC project. The record we reviewed does not give it.
  • Gas service in Putnam County and in the rest of Queens. Putnam County's gas utility figures are not shown, and we can't say which gas utility serves the remaining part of Queens.

Notes

  1. Consolidated Edison and Orange and Rockland, Final Gas System Long-Term Plan (filed November 29, 2023), Case 23-G-0147, PDF 4 of the Appendices (Appendix B), and PDF 18, 27, 29, 31, 51, 52 and 56 of the plan; Annual Updates (May 2025, PDF 8; May 2026, PDF 9). The plan's chart of the supply stack (Figure 28) is an image and is not used for any figure. Utility statements. PDF 27 carries the statement that the need for delivered services is projected to be eliminated by winter 2028/2029 (a page the earlier citation list omitted); PDF 51 carries the 125,000 Dt per day ExC split between Con Edison's Hunts Point citygate and National Grid's South Commack citygate. ↩
  2. Territory statements: PA Consulting's final report on National Grid's plan, PDF 14 and 111, for DPS Staff; Department of Public Service, Electric and Gas Utility Service Territory by County (October 2022), parsed by us. The EIA-176 crosswalk we built for the first draft of this page lists Con Edison for Kings and Richmond counties; the two documents and the crosswalk differ and the difference is recorded in our working papers. ↩
  3. New York Public Service Commission, Order Regarding Long-Term Natural Gas Plan and Requiring Further Actions, Case 23-G-0147 (issued September 20, 2024), PDF 8, 9 and 12; PA Consulting final report for DPS Staff, PDF 42; Central Hudson, Final Gas System Long-Term Plan (November 21, 2024), PDF 23, for the Carmel district; USGS GNIS for Carmel and Somers. The Commission's order and the PA Consulting report are Commission and Staff records. ↩
  4. New York Public Service Commission, Order Regarding Long-Term Natural Gas Plan and Requiring Further Actions, Case 24-G-0248 (issued September 18, 2025), for Winter Storm Elliott (PDF 64); National Grid, Annual Gas System Long-Term Plan Update (May 15, 2026), PDF 21 (printed page 20, section 4.2), for ExC and its Connecticut permit. National Grid's statements about ExC are about a project that also serves Con Edison. ↩
  5. EIA-860M inventory for September 2026 (Planned sheet), filtered to the metro's New York counties by us, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, both our own calculation (the search is described in note 13). Our first search used the singular form (for example "Westchester County") and missed notices that name counties in the plural; a second search of the plural forms found the notices in note 18. A notice that spells a place differently would still be missed. The two planned units are a 2.6 MW natural gas engine (planned October 2026, under construction more than 50 percent complete) and a 2.9 MW nameplate natural gas combined cycle unit (planned July 2027, regulatory approvals not initiated), both at the New York University Central Plant; the earlier text gave 2026 for both, which was the earliest planned year. The Retired sheet lists a 2.4 MW combined cycle unit at the same plant retired in September 2024, a customer's generator and not part of the utilities' supply. ↩
  6. The joint 2027 peak (1,945 MDt per day) is our calculation (illustrative): 1,713 plus 232. The series labels in Appendix B are not in the text extract; the reading of the first series as the Reference Case is ours and is not stated by the utilities.
  7. The counties this page covers are New York, Bronx, Westchester and Rockland, and part of Queens; Kings and Richmond are on the Brooklyn, Queens, Staten Island and Long Island page, and Putnam is a partial gap. Our EIA and Federal Register searches covered the ten New York counties of the whole metropolitan statistical area (Bronx, Kings, Nassau, New York, Putnam, Queens, Richmond, Rockland, Suffolk and Westchester) and the 22 counties of the whole metro; we keep here only the counties and utilities this page covers.
  8. New York Independent System Operator, Interconnection Queue dated September 30, 2026, Load Projects sheet (accessed October 25, 2026; a newer queue was not checked): in Rockland County, utility O&R, queue 1633 Suffern Quarry Data Center (200 MW, proposed backfeed January 2026), queue 1682 and queue 1714 both named Hudson Valley Data Center (50 MW each, February 2027; the rows do not say whether they are one project), queue 1713 Project Sycamore Orangeburg (22.3 MW) and queue 1715 1547 CSR Orangeburg (30 MW; the row's state field reads NJ while its county is Rockland); in Westchester County, utility Con Edison, queue 1717 proposed data centers at 450 Broadway, Buchanan (200 MW, proposed backfeed September 2028). They are electric load requests; the rows give no fuel or gas information. ↩
  9. New York State Department of Environmental Conservation, Environmental Notice Bulletin of July 22, 2026, Positive Declaration, Town of Orangetown, Databank Phase II (2000 Corporate Drive, Rockland County), accessed October 29, 2026: "a 22,571 sf standby power equipment yard." The notice names no fuel for the standby equipment. ↩
  10. Connecticut Department of Energy and Environmental Protection, Notice of Tentative Determination (Second Notice) of July 24, 2026, Iroquois Gas Transmission System, L.P., Brookfield, Application Nos. 202003147, 202003148, 202003146 and 202003805 (the applicant asked to raise carbon monoxide limits from 3.25 to 12.25 tons per year; a hearing may be held if requested); and Hearing Officer Report of July 27, 2026, PDF 1 (petitions from the Town of Brookfield, Stop the Brookfield Compressor Station Expansion and Save the Sound; the matter was not a contested case), both accessed October 29, 2026. Neither document names ExC; the connection to ExC rests on New York's statement in note 11. ↩
  11. New York State Department of Environmental Conservation, notable project page "Iroquois Enhancement by Compression (ExC) Project" (the page shows no update date), accessed October 29, 2026: the project requires air permitting approval from Connecticut DEEP for compressor station upgrades in Connecticut, and "this remains pending before CT DEEP." ↩
  12. New York Department of Public Service, Case 23-G-0147 document list (119 filings, accessed October 29, 2026; matter 70344): the newest filings are the "Con Edison, O&R LTP May 2026 Update" and its cover letter, both filed May 15, 2026. ↩
  13. Federal Register search of FERC notices published July 31 to October 29, 2026 for Westchester County, Rockland County, Bronx, New York County, Queens, Westchester, Manhattan and New York City (no notice returned for the singular forms; the plural forms are in note 18) and for Con Edison and O&R (electric filings), Iroquois, Texas Eastern, Tennessee Gas Pipeline and Millennium. Examples: Iroquois negotiated-rate filings, docket RP26-1292-000 (document 2026-20217, October 2, 2026), and Texas Eastern's A2M II recourse rate compliance filing, docket RP26-1304-000 (document 2026-20420, October 6, 2026); both notices name no county. The earlier search since January 1, 2025 by county phrase is our own calculation. ↩
  14. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: NY City Central Park (station USW00094728). Sums are our calculation. Heating degree days behind the percentages: 3259 in 2023-24, 3658 in 2024-25 and 4047 in 2025-26, against a 1991-2020 normal of 3789. ↩
  15. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the New York City location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for both periods the area has at least a 40% chance of above-normal temperatures, about 33% near-normal and no more than 27% below-normal. ↩
  16. The station is NY City Central Park; one station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  17. NOAA's Climate Prediction Center puts the probability of at least a strong El Nino continuing through January to March 2027 at 80%. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027 (source A1), and its Henry Hub spot price for the week ending October 23, 2026 was 3.28 dollars per million Btu on the first day reported (source C3). These are national facts, not statements about Con Edison's or O&R's systems. ↩
  18. Federal Register, Federal Energy Regulatory Commission notices on Transcontinental Gas Pipe Line Company, LLC projects, found by a plural-county search since January 1, 2025. (a) Notice of Availability of the Draft General Conformity Determination Reevaluation for the Northeast Supply Enhancement Project, document 2025-11967, published June 27, 2025, pages 27537 and 27538, and (b) the Final Reevaluation notice, document 2025-15560, published August 15, 2025, pages 39388 and 39389 (dockets CP17-101-007 and CP20-49-001): air-quality reviews of facilities that include the Raritan Bay Loop "Queens and Richmond Counties, New York"; Queens is partly covered by this page and Richmond by the Brooklyn, Queens, Staten Island and Long Island page. (c) Notice of Request Under Blanket Authorization, document 2026-09687, published May 14, 2026, pages 27325 to 27327 (docket CP26-488-000): a request of May 1, 2026 to abandon in place about 291 feet and by removal about 196 feet of 24-inch pipeline and to install about 490 feet in Hudson County, New Jersey (Hudson West End Lateral Pipeline Replacement Project) to accommodate a rail bridge replacement, at an estimated cost of $14,779,979. (d) Notice of Petition, document 2025-10389, published June 9, 2025, pages 24272 to 24274 (dockets CP17-101-007 and CP20-49-001): Transco's petition to reissue the certificate for the Northeast Supply Enhancement Project, whose Raritan Bay Loop is in Middlesex County, New Jersey. None of the four names a utility, a shipper or a gas load; the New Jersey counties are part of the whole metro but no utility on this page serves them, and we did not read the filings themselves. ↩

Market and weather sources

Public web sources, as of October 25 and 26, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
  3. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
  4. C1. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, release of October 22, 2026. Link ↩
  5. C2. U.S. Energy Information Administration, Natural Gas Citygate Price in New York, monthly. Link ↩
  6. C3. U.S. Energy Information Administration, Henry Hub Natural Gas Spot Price, daily, release of October 21, 2026. Link
  7. C4. Tennessee Gas Pipeline Company, L.L.C., informational postings, critical notices, as posted October 26, 2026. Link ↩

Policy sources

Official sources, as of October 26, 2026. They are context, separate from the regulatory record cited in the Notes.

  1. P1. City of New York, Local Law 154 of 2021. Link ↩
  2. P2. New York State Department of Public Service, Staff White Paper to Implement the All-Electric Buildings Act, Case 25-M-0149, February 27, 2025. Link ↩

Sources

  1. New York Public Service Commission, Case 23-G-0147, long-term gas plans of Consolidated Edison and Orange and Rockland. Link
  2. New York Public Service Commission, Case 24-G-0248, long-term gas plans of National Grid. Link
  3. New York Public Service Commission, Case 23-G-0676, long-term gas system plan of Central Hudson Gas & Electric Corporation. Link
  4. New York State Department of Public Service, Electric and Gas Utility Service Territory by County (October 2022). Link
  5. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  6. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  7. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  8. New York Independent System Operator, Interconnection Queue (September 30, 2026), Load Projects sheet. Link
  9. Connecticut Department of Energy and Environmental Protection (DEEP), Iroquois Gas Transmission System LP, Brookfield (Second Notice), Notice of Tentative Determination, July 24, 2026. Link
  10. New York State Department of Environmental Conservation, Iroquois Enhancement by Compression (ExC) Project, notable project page. Link
  11. New York State Department of Environmental Conservation, Environmental Notice Bulletin, July 22, 2026: Town of Orangetown - Databank Phase II (Positive Declaration). Link
  12. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-20217, published October 2, 2026. Link
  13. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-20420, published October 6, 2026. Link
  14. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00094728 (NY City Central Park). Link
  15. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-15560, 2025-08-15. Link
  16. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-11967, 2025-06-27. Link
  17. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2026-09687, 2026-05-14. Link
  18. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-10389, 2025-06-09. Link