New York natural gas case study, Brooklyn, Queens, Staten Island and Long Island. November 2026

Brooklyn, Queens, Staten Island and Long Island gas capacity: National Grid's system called fragile

The Commission wrote in September 2025 that National Grid's downstate gas system is fragile; National Grid forecasts a shortfall and expects NESE and ExC in service for November 2027, but an undated Iroquois page lists 2028 for ExC.

Fragile and vulnerableThe Commission's description of National Grid's downstate gas system as configured and supplied, September 2025
Under 30 minutesTime before curtailing 30,000 customers, Winter Storm Elliott, December 2022, National Grid downstate, per the Commission
400,000 Dth per dayNESE capacity into National Grid's downstate systems, expected in service November 2027, per National Grid
At capacityNational Grid's 30-inch trunk line across the Narrows from Staten Island to Brooklyn, per PA Consulting for Staff

Metro used: this page covers the part of the New York-Newark-Jersey City, NY-NJ metropolitan statistical area (OMB Bulletin No. 23-01, July 21, 2023) served by National Grid's downstate gas systems, The Brooklyn Union Gas Company (KEDNY) and KeySpan Gas East Corporation (KEDLI), both doing business as National Grid, whose records are the New York Public Service Commission's (the Commission's) Case 24-G-0248. Confidence is Medium because the figures are for the two systems together, not split between KEDNY and KEDLI or by county.1

Key takeaways

  • National Grid told the Commission that, unlike the electric system, it has zero allowable contingency or reserve margin.1
  • In May 2026 Iroquois was awaiting a Connecticut permit, and Transco had commenced construction of certain NESE facilities.4
  • PA Consulting wrote that winter 2027-28 is the last season viable on a design day without ExC or Greenpoint 13 and 14.3
  • PA Consulting wrote that capacity limitations exist at the Narrows crossing.3
  • In Winter Storm Elliott the Commission said the system was not near a design day.1
  • National Grid said LNG was called on six days in the January 2026 Polar Vortex (Winter Storm Fern).4

What is the outlook for Brooklyn, Queens, Staten Island and Long Island gas capacity through 2029?

Discovery Energy rates the outlook for Brooklyn, Queens, Staten Island and Long Island natural gas capacity through 2029 as Elevated (confidence: Medium): the Commission wrote in September 2025 that National Grid's downstate gas system is fragile and vulnerable. National Grid forecasts a supply shortfall, and PA Consulting places the first design day shortfall in 2028-29 if either new supply source is not operating by then. National Grid operates with zero allowable contingency or reserve margin,1 the 30-inch trunk line across the Narrows is at capacity with no fix named in the record we reviewed,3 and as of National Grid's May 2026 update ExC was still awaiting a Connecticut permit.4 The level does not depend on whether ExC is in service in 2027 or 2028. All figures are for the two systems together.

Documented risk factors: recent supply events, which are Winter Storm Elliott in December 2022 and LNG called on six days in January 2026. We count them together as one factor.

Three developments would change the assessment: the Connecticut permit, construction and in-service dates for ExC and NESE against November 2027, and National Grid's May 2027 annual update; any Commission action on a moratorium or reserve margin; or a repeat of the supply cuts of Winter Storm Elliott.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Brooklyn, Queens, Staten Island and Long Island area?

National Grid serves the area through KEDNY, which PA Consulting says serves Staten Island, Brooklyn and parts of Queens, and KEDLI, which covers Nassau and Suffolk counties and the Rockaway Peninsula in Queens, giving Kings, Richmond, Nassau and Suffolk counties and part of Queens County.3 The Department of Public Service county table lists Con Edison for Richmond County and the EIA-176 crosswalk used in the first New York City run lists Con Edison for Kings and Richmond, while PA Consulting says KEDNY serves them; the sources differ and the page states both.2 Con Edison is covered on the New York City and Westchester page.

Queens County is split: Con Edison says it serves portions of Queens, PA Consulting says KEDNY serves parts and KEDLI the Rockaway Peninsula, and the county table lists both utilities. The record we reviewed does not split Queens by neighbourhood, and this page does not assign places inside it.

Where Utility and what this page covers
Kings and Richmond counties (Brooklyn and Staten Island) KEDNY: Commission order of September 2025, May 2026 update, PA Consulting report; gates Tetco-Goethals (Staten Island), Transco-Narrows and Transco-Rockaway (Brooklyn)
Queens County, part (and the Rockaway Peninsula) KEDNY and KEDLI; Con Edison also serves portions of Queens; places not assigned
Nassau and Suffolk counties (Long Island) KEDLI: same record; gates Transco-Long Beach and Iroquois-South Commack

Source: National Grid filings, the Commission and PA Consulting, in the Notes.1

None of the filings splits its figures between KEDNY and KEDLI or allocates them to counties, so the figures here describe National Grid's downstate systems as a whole, not this area alone.3 The long-distance interstate pipelines, including Transco and Iroquois, are outside the area, but their gates into National Grid's systems are inside it; the systems depend on those pipelines.6 FERC notices place the Transco NESE Raritan Bay Loop onshore and offshore in Queens and Richmond counties, and one notice says New York State waters.17

Has Brooklyn, Queens, Staten Island and Long Island had gas supply problems since 2020?

The record documents events in two winters. In December 2022, during Winter Storm Elliott, the Commission said National Grid and Con Edison required interruptible customers, including power generators, to move to alternate fuels, ran LNG plants and coordinated a public appeal to reduce gas use, and that their final action would have been to curtail firm customers; it said National Grid was less than 30 minutes from curtailing an initial group of 30,000 customers.1 National Grid said that during the January 2026 Polar Vortex (Winter Storm Fern) LNG was called on six days from its Greenpoint and Holtsville plants, that non-firm customers were interrupted as tariffs allow, and that design day conditions did not occur in winter 2025/26.4

How much spare gas capacity does Brooklyn, Queens, Staten Island and Long Island have on the coldest day?

Pipelines supplying the Brooklyn, Queens, Staten Island and Long Island area N Iroquois Gas Transmission Iroquois Gas Transmission Transco Transco Arthur Kill Generating Station Arthur Kill Generating Station New York New York Kings Co. Kings Co. Nassau County Nassau County Suffolk County Suffolk County Newark Newark Yonkers Yonkers Paterson Paterson Bridgeport Bridgeport Stamford Stamford New Haven New Haven Waterbury Waterbury Norwalk Norwalk I-95 I-95 I-84 I-84 I-78 I-495 I-287 CT 15 I-80 NJ GSP I-91 CT 8 NY 25 NY 27 I-684 CT 9 NY 17 CT 2 NJ 18 NY SBP Orange Co. Orange Co. Pipelines supplying the Brooklyn, Queens, Staten Island and Long Island area Other gas pipelines Highways Brooklyn, Queens, Staten Island and Long Island metro area (5 counties) County lines Cities and towns Gas-fired power plant named on this page
Figure 1. Major natural gas pipelines serving Brooklyn, Queens, Staten Island and Long Island. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Form EIA-860 (2025). Counties, places, state outline and population: U.S. Census Bureau. Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Transco; Iroquois Gas Transmission.
  • Gas-fired power plants marked: Arthur Kill Generating Station.
  • Metro counties outlined (5): Kings County; Nassau County; Queens County; Richmond County; Suffolk County.
  • Cities and towns labeled include: New York; Newark; Yonkers; Paterson; Bridgeport; Stamford; New Haven; Waterbury.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

The design day is the coldest day the system is planned to serve. The Commission's order says National Grid projects downstate design day demand will rise from 2,829,000 Dt per day in winter 2023/24 to 3,551,000 Dt per day in 2049/50, and that slower growth may delay the projected supply gap until 2041/42 in its preliminary 2025 forecast.1 National Grid said, as the Commission quotes it, that there is zero allowable contingency or reserve margin, and the Commission wrote that the system as currently configured and supplied is fragile and vulnerable.1

PA Consulting wrote that winter 2027-28 is the last season the system is viable on a design day without incremental supply from Iroquois ExC or Greenpoint vaporizers 13 and 14, that if either is not operational by 2028-29 a design day supply shortfall occurs under National Grid's Reference Case, and that its modeling assumes no disruption to upstream pipeline deliveries.3

PA also wrote that pipeline capacity limitations exist at the Narrows crossing from Staten Island into Brooklyn, that the existing 30-inch trunk line is at capacity, and that National Grid has identified vulnerabilities in the Brooklyn and Queens regions.3 National Grid said its Greenpoint LNG facility can supply up to 291,000 Dt per day, 10.3% of the 2023/24 design day by our calculation, though the years differ.1 National Grid's May 2026 update says its downstate system is forecasted to face a supply shortfall described in its LTP Addendum, which is not among the filings we reviewed.4

What is driving new natural gas demand?

National Grid projects downstate design day demand to grow; the filings we reviewed name no new large load by customer or service date.1

A search of other official records found two planned natural gas-fired generator records in the metro's New York counties, both at New York University's central plant in New York County, which is not one of this page's five counties, none in Kings, Queens, Richmond, Nassau or Suffolk County, and, since January 1, 2025, two Federal Energy Regulatory Commission notices on Transco's Northeast Supply Enhancement project that name Queens and Richmond Counties; none names National Grid or a gas load.5 EIA lists Arthur Kill unit GT1 in Richmond County (18 MW), an electric generator, as retired in May 2025.10

Data centers: As of October 29, 2026, we found no data center gas load in the five counties: EIA lists no planned gas unit in them, and a search of FERC notices since July 31, 2026 for the counties, Long Island, Brooklyn and Staten Island found no gas notice.11

Nearby: The two New York University generator records are in New York County, which is not one of this page's five counties, and no record we reviewed ties them to National Grid's systems.5

Are upgrades arriving in time?

National Grid said in May 2026 that it expects the Transco Northeast Supply Enhancement project (NESE), which will deliver an additional 400,000 Dth per day into the Rockaway Lateral, and the Iroquois Enhancement by Compression project (ExC), of which KEDLI holds 62,500 Dth per day, in service for November 2027.4 The PA Consulting report places the first design day supply shortfall under the Reference Case in 2028-29 if either ExC or Greenpoint 13 and 14 is not operational.3

As of National Grid's May 2026 update, Iroquois had the necessary FERC and New York State authorization and was awaiting a Connecticut permit before starting construction, and Transco had commenced construction of certain NESE facilities.4 National Grid's update does not state that Transco holds every approval for NESE; Williams, Transco's parent company, said on April 14, 2026 that with federal and state construction permits in hand NESE remains on track for the fourth quarter of 2027.14 An undated Iroquois project page, as of October 29, 2026, lists a FERC partial notice to proceed with construction dated September 23, 2026, and a proposed in-service date of calendar year 2028, revised due to regulatory delays.12

National Grid said the Greenpoint project to raise vaporization to 350,000 Dth per day is not being pursued.4 PA Consulting names the same project as Greenpoint vaporizers 13 and 14.3 National Grid also said that it plans to supply its five Long Island CNG sites, which can provide up to 88,000 Dth per day, as contingency for possible delays to NESE and ExC.4 It also said in May 2026 that it was letting a KEDNY contract of 25,253 Dth per day at Iroquois South Commack expire on September 30, 2026 and had secured alternative short-term supply; the contract is 0.9% of the 2023/24 design day by our calculation.1

What does this mean for business gas costs?

National Grid's May 2026 update compares the cost of its peaking resources, in a table whose columns are CNG, city gate peaking and LNG: annual demand costs of $49,396,874, $13,931,095 and $28,014,123, based on winter 2027/28 projections for CNG and city gate and fiscal 2025 revenue requirements for LNG fixed costs; the update does not state how they are allocated among customer classes.4

Who gets gas first in a shortage?

The record shows interruptible service ending first in practice. In Winter Storm Elliott National Grid and Con Edison required interruptible customers to move to alternate fuels before the last step of curtailing firm customers.1 National Grid said non-firm customers were interrupted as tariffs allow in January 2026.4 This page does not cover the tariff that sets the order of interruption.

Winter and market context

National layer. NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the Ohio Valley and mid-Atlantic regions, a discussion that names regions and not counties.B1 National inventory, El Nino, liquefied natural gas export and Henry Hub figures do not bear on National Grid's downstate gates and sit in a note.15

Regional layer. This area lies in EIA's East storage region, whose working gas EIA's weekly storage table, released October 22, 2026, lists at 900 billion cubic feet for the week ending October 16, 2026; this page does not give the five-year-average comparison that EIA carries in its weekly report.C1 EIA's New York state citygate series, the nearest regional price, shows 8.07 dollars per thousand cubic feet for July 2026, the latest month.C2

Pipeline notices. A search of Federal Register FERC notices since July 31, 2026 found no pipeline notice naming this area's counties, though notices naming Transco or Iroquois exist; we reviewed only some of them, and either pipeline's own posting site is not covered here, so recent winter or critical notices for them are not shown here.16 Our search since January 1, 2025 found four notices that name a county of the whole metro (note 17), two on Transco NESE naming Queens and Richmond counties and two naming Hudson and Middlesex counties, New Jersey; none names National Grid or a gas load.17

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal at the JFK International Airport station in the winters of 2023-24 and 2024-25 and above it in 2025-26.7 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027.8 The airport is one station standing in for the area, and NOAA's figures are probabilities for a three-month average.9

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 3499 3963 -11.7%
2024-25 3475 3963 -12.3%
2025-26 4243 3963 +7.1%

Heating degree days at the JFK International Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

Policy context

New York City's Local Law 154 of 2021 adds a section to Title 24 of the Administrative Code, under which no person shall permit the combustion of any substance that emits 25 kilograms or more of carbon dioxide per million British thermal units within a building subject to it, with exceptions that include buildings under seven stories with an application on or before December 31, 2023, and buildings of seven stories or more with an application on or before July 1, 2027.P1

A New York State Department of Public Service Staff white paper dated February 27, 2025 on the All-Electric Buildings Act (Part RR of Chapter 56 of the Laws of 2023) says the Act's provisions apply to new buildings seven stories or less, with exceptions, effective December 31, 2025 and will apply to all new buildings effective December 31, 2028, and, as applied by the Code Council, to permit applications substantially complete as of December 31, 2025; we did not confirm the Act's current status from an official source.P2

What's new (as of October 29, 2026)

An undated Iroquois project page for ExC, as of October 29, 2026, lists a FERC partial notice to proceed dated September 23, 2026 and a proposed in-service date of calendar year 2028.12 On August 26, 2026 FERC staff issued an environmental assessment for the Constitution Pipeline and Iroquois's Wright Interconnect project in Schoharie County, New York; the notice does not mention National Grid.13 We found no notice since July 31, 2026 naming a county in this area.11

What should Brooklyn, Queens, Staten Island and Long Island facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which service. Confirm whether each site takes firm or interruptible service, since interruptible customers are moved first.
  • Which utility. Confirm whether the site is served by National Grid (KEDNY or KEDLI), Con Edison or another utility, because the records differ by utility and Queens is served by more than one.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track the in-service dates of NESE and ExC and the annual updates in the Commission's long-term plan case for National Grid.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Brooklyn, Queens, Staten Island and Long Island businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. National Grid said design day conditions did not occur in winter 2025/26 and its systems performed well; see 'Has Brooklyn, Queens, Staten Island and Long Island had gas supply problems since 2020?'

Is there spare gas capacity in Brooklyn, Queens, Staten Island and Long Island on the coldest day?

National Grid said it has zero allowable contingency or reserve margin. See 'How much spare gas capacity does Brooklyn, Queens, Staten Island and Long Island have on the coldest day?' for the consultant's findings.

What are NESE and ExC, and when are they expected?

They are the Transco Northeast Supply Enhancement project and the Iroquois Enhancement by Compression project. National Grid expects both in service for November 2027, and as of National Grid's May 2026 update Iroquois was awaiting a Connecticut permit; an undated Iroquois project page, as of October 29, 2026, lists 2028 for ExC; see 'Are upgrades arriving in time?'

Did the Commission find a gas supply deficiency in Brooklyn, Queens, Staten Island or Long Island?

The Commission wrote in September 2025 that National Grid's downstate system is fragile and vulnerable; the Commission's findings do not describe the system as deficient, and the record we reviewed shows no curtailment of firm customers.

Who is cut first if gas service must be curtailed?

In Winter Storm Elliott, the Commission said interruptible customers were moved to alternate fuels before firm customers would have been curtailed. This page does not cover the tariff sequence; see 'Who gets gas first in a shortage?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Who pays for the upgrades, and which customers are interrupted first. The public record does not show how costs are shared among customer classes or the order of interruption in the tariff.
  • National Grid's Long-Term Plan addendum on the NESE pipeline project, and whether Transco holds every approval for it. National Grid states only that construction of certain facilities has begun.
  • How the downstate figures split between National Grid's Brooklyn and Long Island utilities. The sources do not separate them.
  • Which utility serves Richmond and Kings counties. The sources differ.
  • Whether state air permits, interconnection queue entries or federal pipeline certificate filings show other large new gas users. Those records are not covered here.

Notes

  1. New York Public Service Commission, Order Regarding Long-Term Natural Gas Plan and Requiring Further Actions, Case 24-G-0248 (issued September 18, 2025), PDF 21, PDF 27, PDF 64 to 66, PDF 104 and 105. National Grid's KEDNY and KEDLI figures are given for its downstate systems together and are not split. The percentages are our calculation (illustrative): Greenpoint 291,000 and the Iroquois contract 25,253, each divided by 2,829,000. The metro counties are Kings, Queens (part), Richmond, Nassau and Suffolk; the EIA and Federal Register filters we ran covered the whole New York-Newark-Jersey City county list and we kept only these counties. ↩
  2. Con Edison, Final Gas System Long-Term Plan (November 29, 2023), PDF 18; Department of Public Service, Electric and Gas Utility Service Territory by County (October 2022), read in full. The EIA-176 crosswalk used in the first New York City run lists Con Edison for Kings and Richmond counties; the sources differ, and the page states both. ↩
  3. PA Consulting, Final Report on National Grid's Long-Term Gas Plan, for DPS Staff, PDF 14, 70, 71 and 111; Staff analysis. National Grid's gate list: May 2026 update, PDF 12. The statement that National Grid has identified vulnerabilities in the Brooklyn and Queens regions is on PDF 72. PA Consulting's description of the Greenpoint vaporizers 13 and 14, which would bring Greenpoint to 350 thousand Dth per day, is on PDF 54. ↩
  4. National Grid, Annual Gas System Long-Term Plan Update (May 15, 2026), PDF 21 to 24 and PDF 52. Utility statements. ↩
  5. EIA-860M inventory for September 2026 (Planned sheet), filtered to the metro's New York counties by us, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, both our own calculation. Our first search used the singular form (for example "Kings County") and missed notices that name counties in the plural; a second search of the plural forms found the notices in note 17. A notice that spells a place differently would still be missed. ↩
  6. National Grid, Annual Gas System Long-Term Plan Update (May 15, 2026), PDF 12 (city gates of KEDNY: Tetco-Goethals on Staten Island, Transco-Narrows and Transco-Rockaway at Floyd Bennett Field; of KEDLI: Transco-Long Beach and Iroquois-South Commack). Utility statement; the sentence about dependence on these pipelines is our reading of the gate list. ↩
  7. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: JFK International Airport (station USW00094789). Sums are our calculation. Heating degree days behind the percentages: 3499 in 2023-24, 3475 in 2024-25 and 4243 in 2025-26, against a 1991-2020 normal of 3963. ↩
  8. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Brooklyn, Queens and Long Island location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for both periods the area has at least a 40% chance of above-normal temperatures, about 33.3% near-normal and no more than 26.7% below-normal. ↩
  9. The station is JFK International Airport; one airport station is not a measurement of the whole area. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  10. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, Retired sheet, Arthur Kill Generating Station, unit GT1 (operator Arthur Kill Power, LLC, 18 MW natural gas combustion turbine, in service 1970, retired May 2025, Richmond County). The Planned sheet lists no planned gas unit in Kings, Queens, Richmond, Nassau or Suffolk County; its planned units there are batteries, solar, offshore wind and one landfill gas unit (our filter). ↩
  11. Federal Register API search of FERC notices published July 31 to October 29, 2026 (accessed October 29, 2026) for "Nassau County," "Suffolk County," "Kings County," "Richmond County, New York," "Queens County," "Brooklyn," "Staten Island," "KeySpan," "Brooklyn Union," "Northeast Supply Enhancement" (none) and "Long Island" (one hit: document 2026-15769, August 4, 2026, a complaint by the Long Island Power Authority about an electric transmission system, docket EL26-94, which is not a gas matter). A notice that spells a place differently would be missed. Searches of EIA-860M above; news items about Long Island data centers were leads only and are not cited. ↩
  12. Iroquois Gas Transmission System, L.P., "Enhancement by Compression (ExC) Project" web page, accessed October 29, 2026 (the page is undated): Project Highlights ("Proposed In-Service Calendar Year 2028"), Proposed Timeline (footnote "Revised due to regulatory delays"; construction expected to begin by summer/fall 2027 upon receiving all necessary permits, including state air permits), and the Applications and Filings list (FERC Docket CP20-48-000: certificate March 25, 2022; extension of time February 19, 2025; partial notice to proceed with construction September 23, 2026). The page describes ExC as adding 125 million cubic feet per day at Waddington, NY for redelivery to New York utilities. The page names New York air permits and does not mention the Connecticut permit; we did not read FERC's notice itself, and the date pairing in the list was confirmed on the rendered page. ↩
  13. Federal Register, FERC Notice of Availability of the Environmental Assessment for the Proposed Constitution Pipeline and Wright Interconnect Projects, document 2026-17399, published August 26, 2026 (dockets CP13-499-006 and CP13-502-003), first paragraph; comments were due September 21, 2026. The notice does not mention National Grid. ↩
  14. Williams, press release "Williams Breaks Ground on NESE Project to Deliver Reliable, Affordable Clean Energy to the Northeast," April 14, 2026, accessed October 29, 2026; we paraphrase it. It reports a groundbreaking ceremony at Floyd Bennett Field in Brooklyn. It is a company statement, and we did not check it against the permits themselves. ↩
  15. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and its October 2026 Short-Term Energy Outlook says prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. NOAA's Climate Prediction Center puts the probability of at least a strong El Nino continuing through January to March 2027 at 80%. EIA's Henry Hub spot price for the first reported day of the incomplete week of October 19 to 23, 2026 was 3.28 dollars per million Btu (source C3). These are national and regional facts, not statements about National Grid's systems. ↩
  16. Federal Register API search of FERC notices published July 31 to October 29, 2026 (accessed October 29, 2026): 11 documents name Transcontinental Gas Pipe Line and 9 name Iroquois Gas Transmission; we read the text of those from August 26 to October 6, 2026 (for example the standards compliance filings in dockets RP26-1091 and RP26-1128) and not the rest. Transco's Leidy Access Expansion Project (docket CP26-576, September 24, 2026) is in Luzerne County, Pennsylvania, and no notice we read ties it to this area. The pipelines' own posting sites could not be read. ↩
  17. Federal Register, Federal Energy Regulatory Commission notices on Transcontinental Gas Pipe Line Company, LLC projects, found by a plural-county search since January 1, 2025. (a) Notice of Availability of the Draft General Conformity Determination Reevaluation for the Northeast Supply Enhancement Project, document 2025-11967, published June 27, 2025, pages 27537 and 27538, and (b) the Final Reevaluation notice, document 2025-15560, published August 15, 2025, pages 39388 and 39389 (dockets CP17-101-007 and CP20-49-001): air-quality reviews of facilities that include the Raritan Bay Loop "Queens and Richmond Counties, New York"; they conclude the project would conform through the purchase of emission reduction credits and name no utility or shipper. (c) Notice of Request Under Blanket Authorization, document 2026-09687, published May 14, 2026, pages 27325 to 27327 (docket CP26-488-000): a request of May 1, 2026 to abandon about 291 feet in place and about 196 feet by removal of 24-inch pipeline and install about 490 feet in Hudson County, New Jersey, to accommodate a rail bridge replacement (estimated cost $14,779,979). (d) Notice of Petition, document 2025-10389, published June 9, 2025, pages 24272 to 24274: Transco's petition to reissue the certificate for the Northeast Supply Enhancement Project, which includes the Raritan Bay Loop in Middlesex County, New Jersey and, in the notice's words, "New Jersey and New York State waters". The New Jersey counties are in the whole metro but outside this page's five counties, and we did not read the filings themselves. ↩

Market and weather sources

Public web sources, as of October 25 and 26, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
  3. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
  4. C1. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, release of October 22, 2026. Link ↩
  5. C2. U.S. Energy Information Administration, Natural Gas Citygate Price in New York, monthly. Link ↩
  6. C3. U.S. Energy Information Administration, Henry Hub Natural Gas Spot Price, daily, release of October 21, 2026. Link

Policy sources

Official sources, as of October 26, 2026. They are context, separate from the regulatory record cited in the Notes.

  1. P1. City of New York, Local Law 154 of 2021. Link ↩
  2. P2. New York State Department of Public Service, Staff White Paper to Implement the All-Electric Buildings Act, Case 25-M-0149, February 27, 2025. Link ↩

Sources

  1. New York Public Service Commission, Case 24-G-0248, long-term gas plans of National Grid. Link
  2. New York Public Service Commission, Case 23-G-0147, long-term gas plans of Consolidated Edison and Orange and Rockland. Link
  3. New York State Department of Public Service, Electric and Gas Utility Service Territory by County (October 2022). Link
  4. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  5. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  6. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  7. Iroquois Gas Transmission System, L.P., Enhancement by Compression (ExC) Project page. Link
  8. Federal Register (FERC), Notice of Availability of the Environmental Assessment for the Proposed Constitution Pipeline and Wright Interconnect Projects, document 2026-17399, August 26, 2026. Link
  9. Williams (Transco's parent company), Press release: Williams Breaks Ground on NESE Project, April 14, 2026. Link
  10. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00094789 (JFK International Airport). Link
  11. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-15560, 2025-08-15. Link
  12. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-11967, 2025-06-27. Link
  13. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2026-09687, 2026-05-14. Link
  14. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-10389, 2025-06-09. Link

Corrected November 9, 2026: The earlier version said Iroquois was awaiting a Connecticut permit without a date; that was National Grid's May 2026 statement, and the page now says so. The summary and the answer on upgrades also gave only November 2027 for ExC; they now add that an undated Iroquois project page, as of October 29, 2026, lists 2028 The page also now says a design day supply shortfall occurs in 2028-29 if either ExC or Greenpoint 13 and 14 is not operational (it earlier said if neither is), as PA Consulting words it, and no longer says the order does not use the word deficient: the Commission's findings do not describe the system as deficient.