Pennsylvania and New Jersey natural gas case study, Philadelphia area. November 2026

Philadelphia-area gas capacity: one utility's firm gap is met partly by delivered supply

PECO says its 2026-2027 design day requirement is 926,731 Mcf and shows a firm gap of 2% between total assets and design day demand, met partly with delivered supply; the state commission approved its settlement without addressing capacity.

926,731 McfPECO's design day requirement for the 2026-2027 winter, PECO system, per PECO
2% (16,853 Dth per day)PECO's stated gap between total assets and design day demand, 2026-2027, PECO system, per PECO
589 MMcfPGW's peak day gas requirement for 2026-2027, PGW system, per PGW
154,412 DthSouth Jersey Gas's stated 2026-27 design day excess of supplies over requirements, whole system

Metro used: the Philadelphia-Camden-Wilmington, PA-NJ-DE-MD metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). This page reads the records of PECO Energy Company (PECO), Philadelphia Gas Works (PGW), South Jersey Gas Company (South Jersey Gas), Public Service Electric and Gas Company (PSE&G), Delmarva Power, New Jersey Natural Gas, UGI Utilities and Columbia Gas of Pennsylvania. It does not cover Chesapeake Utilities or Elkton Gas, and the figures are system-wide, so confidence is Medium.14

Key takeaways

  • PECO said its supply resources, with peaking and delivered supply, will satisfy its design day requirement for 2026-2027, for its whole system.1
  • PECO's table lists a gap of 12,211 Dth per day (1%) for 2027-2028; PECO said it plans to meet that deficit through hedging, for its whole system.2
  • PECO will procure 36,000 Dth per day of delivered supply and is raising West Conshohocken LNG vaporization to 220,000 Mcf per day; no in-service date or budget.2
  • PGW's forms show net peak day gas supply equal to its requirement with no separate reserve margin; its storage list includes two Texas Eastern contracts ending April 30, 2030.3
  • South Jersey Gas lists its 75,000 Dth Adelphia/Columbia entitlement for 2026-27 only and called meeting design day without it its primary operational concern.4
  • PSE&G's company-wide Schedule F shows supply above requirements for 2026-2027, a surplus that is 4.7% of the requirement by our calculation.5

What is the outlook for Philadelphia gas capacity through 2029?

Discovery Energy rates the outlook for Philadelphia-area natural gas capacity through 2029 as Elevated (confidence: Medium): PECO's 2026 filing shows a firm gap between its total assets and its design day demand for the 2026-2027 winter, which it meets partly with delivered supply and a hedging program rather than firm assets.1 PECO gives no in-service date or budget for its increase in liquefied natural gas (LNG) vaporization at West Conshohocken.2 These figures are for whole systems, not the metro alone, and several utilities in the metro are not covered here.14 Documented risk factors: none beyond the gap in PECO's filing that sets this level. Three developments would change the assessment: PECO's next Purchased Gas Cost filing (the gap, the delivered supply and hedging volumes) and the status, date and budget of the West Conshohocken LNG vaporization increase; the end of South Jersey Gas's Adelphia/Columbia entitlement after 2026-27 and how it is replaced; PSE&G's next Schedule F and PGW's next resource planning report, which lists two Texas Eastern storage contracts ending April 30, 2030. For the Burlington County part of the metro, New Jersey Natural Gas's design day forecast in Workpaper 7, or another pipeline force majeure that restricts its firm capacity, would also be a trigger.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Philadelphia area?

The table sorts the record by utility, using our crosswalk of utilities to metro counties and the OMB county list. No filing allocates its figures to the metro's counties, so each figure describes a whole system, not the metro alone.1

Where Utility and what this page covers
Philadelphia County PGW: peak day requirement and supply forms (PGW serves only this county)
Bucks, Chester, Delaware and Montgomery counties, and part of Philadelphia PECO: design day requirement, assets and gap (system-wide)
Burlington, Camden and Gloucester counties South Jersey Gas: design day forecast (whole South Jersey Gas system, including areas outside the metro); PSE&G: Schedule F (company-wide, mostly outside the metro)
New Castle County (Delaware) Delmarva Power: 2025-26 gas cost filing, peak or design day supply and firm contracts (whole Delaware gas system, which the filing describes as its New Castle County service territory); covered in a section below
Cecil County (Maryland) and Chesapeake Utilities in Delaware Not covered here: the Chesapeake Utilities and Elkton Gas filings are not among the filings we reviewed
Burlington County New Jersey Natural Gas Company (NJNG): June 2026 filing we reviewed (whole NJNG system); its design day forecast is in Workpaper 7, which is not among the filings we reviewed, so NJNG's margin is not shown; covered in a section below
Chester County UGI Utilities, Inc. (UGI Gas) and Columbia Gas of Pennsylvania, Inc. (Columbia Gas PA): system-wide records we reviewed, covered in the next section; neither allocates figures to the county

Utility records by whether they fall inside the Philadelphia metro (OMB delineation). Source: utility filings in the Notes; county crosswalk from EIA-176.1

The New Jersey figures below are system-wide, and the New Jersey Board of Public Utilities (BPU) statewide findings are not specific to the metro.6 The firm contracts in the filings are on pipelines that also cross the area, including Transco, Columbia and Texas Eastern, and the supply sources are mostly outside it, so events on those pipelines matter here.26

What do the UGI Gas and Columbia Gas PA records show for Chester County?

Two more gas utilities are listed for Chester County: UGI Gas's tariff lists Oxford borough and several townships,10 and Columbia Gas PA's tariff page lists Coatesville.11 Neither gives figures for the county; both below are system-wide.

UGI Gas's peak-day schedule for the year ending September 30, 2027 shows total firm capacity of 2,340,671 Dth and total requirements of 2,280,283 Dth for the whole UGI Gas system, which is 45 counties.10 The difference is about 2.6% of requirements, calculated from UGI figures.

Columbia Gas PA's Table 4 shows total firm design-day demand of 635.5 MDth per day and net firm capacity of 652.3 MDth per day for 2026-27, whole system.11 The table's last line prints a difference of 18.1; subtracting the two printed figures gives 16.8, about 2.6% of demand by our calculation, and the table does not explain the gap.

Both show capacity above requirements for the whole system but say nothing about the part serving Chester County, so neither changes the outlook, which rests on PECO's figures.

What does Delmarva Power's record show for New Castle County?

Delmarva Power said in its August 2025 gas cost filing with the Delaware Public Service Commission (the Delaware Commission) that it serves approximately 141,000 customers in its New Castle County service territory, which is the whole of its Delaware gas system as the filing describes it.12 The filing is a gas cost rate case, not a capacity plan, and neither figure below is a design day demand.

Delmarva Power said it will begin the 2025-26 gas cost period with 218,484 Mcf per day of peak or design day supply deliverability available to meet firm sales customer requirements, which counts 60,000 Mcf of design day vaporization at its Wilmington liquefied natural gas (LNG) facility.12 Its Schedule DPC-1 breaks the total into 119,456 Mcf per day of firm transportation, 39,028 of firm storage and 60,000 of LNG.12 The filing states no design day demand figure, so we show no margin for the Delaware system.

Contract (Schedule DPC-1) Mcf per day Expires Share of 218,484 Mcf per day supply Share of 119,456 Mcf per day firm transportation
Transco GSS (firm storage) 28,420 March 2028 13.0% not applicable (storage)
Transco Sentinel FT 24,155 May 2029 11.1% 20.2%
Columbia FTS (two contracts, 6,685 and 19,324) 26,009 March 2030 11.9% 21.8%
Columbia FSS (firm storage) 9,768 March 2030 4.5% not applicable (storage)
TETCO FT-1 9,662 October 2030 4.4% 8.1%

Delmarva Power contracts that expire in 2028 to 2030, as Schedule DPC-1 lists them (whole Delaware gas system); shares by our calculation from the schedule's figures.12

Two further Transco FT contracts, together 59,631 Mcf per day, are marked Evergreen, meaning no date of termination and at Delmarva Power's option.12 The filing does not say whether expiring contracts will be renewed or replaced.

The Delaware Commission found in Order No. 11056 (July 2026) that Delmarva Power's proposed gas cost rates and tariff changes are just and reasonable, and the order records that Delmarva Power will continue to take steps to mitigate increases in fixed costs when managing its pipeline capacity and storage portfolio; it is about gas cost rates and makes no finding on design day capacity.12

An Exeter Associates memorandum to Commission Staff (January 2026) says Exeter found that no changes to the proposed rates or gas procurement practices were appropriate or necessary; the Strategic Natural Gas Supply Plan it reviewed is not among the records we reviewed.12 Delmarva Power's tariff lists medium-volume and large-volume interruptible transportation services, but the text we reviewed gives no interruption sequence.

The record shows no shortfall, no margin and no Commission capacity finding for the Delaware system, so it does not change the outlook, which rests on PECO's figures.

What does New Jersey Natural Gas's record show for Burlington County?

New Jersey Natural Gas Company (NJNG) said in its June 2026 filing that in recent years there have been several pipeline events that have led to the restriction of firm capacity.13 It listed a force majeure at Transco's Station 517 in Columbia County, Pennsylvania, starting gas day December 13, 2025 and lasting 12 days, and a Columbia Milford Compressor force majeure of 7 days, with the start date printed as December 30, 2026, which appears to be a typographical error in the filing.13

NJNG's Exhibit JSS-2 lists 16 daily-balancing periods between December 4, 2025 and March 2, 2026 for interruptible customers, 25 customers, reason operational, and NJNG's Exhibit JSS-5 lists extensions of transportation contracts, so contract ends in the window are extended and not left unreplaced.13

NJNG said it considers ten-year design day projections of firm load to plan for needed capacity, and that its design day forecast and associated supplies through January 2036 are in Workpaper 7, which was filed separately and is not among the filings we reviewed.13 The filing gives whole-system figures and does not name Burlington County, which is placed in NJNG's territory by the EIA-176 crosswalk, so NJNG's margin is not shown.

The pipeline events could be read as one risk factor for NJNG's system; we did not count them as a risk for the outlook, and the events are one to watch.

How much spare gas capacity does Philadelphia have on the coldest day?

Pipelines supplying the Philadelphia-Camden-Wilmington area N Texas Eastern Texas Eastern Eastern Shore Natural Gas Eastern Shore Natural Gas Transco Transco Transco Transco Transco Transco Transco Transco Texas Eastern Texas Eastern Eastern Shore Natural Gas Eastern Shore Natural Gas Transco Transco Eddystone Generating Station Eddystone Generating Station Philadelphia Philadelphia Bucks County Bucks County Burlington County Burlington County Camden County Camden County Cecil County Cecil County Gloucester County Gloucester County Montgomery County Montgomery County Salem County Salem County New York New York Washington Washington Baltimore Baltimore Yonkers Yonkers Paterson Paterson Alexandria Alexandria Allentown Allentown Reading Reading I-95 I-95 I-80 I-80 I-76 I-78 I-78 NJ GSP NJ GSP I-81 I-81 I-295 I-476 I-495 I-83 I-287 US-1 US-22 US-22 NJ 55 I-695 US-222 I-180 PA 283 I-276 NJ 18 Pipelines supplying the Philadelphia-Camden-Wilmington area Other gas pipelines Highways Philadelphia-Camden-Wilmington metro area (11 counties) County lines Cities and towns Gas-fired power plant named on this page
Figure 1. Major natural gas pipelines serving Philadelphia-Camden-Wilmington. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Form EIA-860 (2025). Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Texas Eastern; Transco; Eastern Shore Natural Gas.
  • Gas-fired power plants marked: Eddystone Generating Station.
  • Metro counties outlined (11): Bucks County; Burlington County; Camden County; Cecil County; Chester County; Delaware County; Gloucester County; Montgomery County; New Castle County; Philadelphia County; Salem County.
  • Cities and towns labeled include: New York; Philadelphia; Washington; Baltimore; Yonkers; Paterson; Alexandria; Allentown.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

A design day is the coldest day a utility plans its supply to meet. A dekatherm (Dth) is a unit of energy of roughly a thousand cubic feet of gas, and Mcf means a thousand cubic feet.

PECO. PECO said its projected design day requirement for 2026-2027 is based on a design day temperature of zero degrees Fahrenheit, a wind speed of 13 miles per hour and no reserve factor.2 Its table compares design day demand with projected total assets, in Dth per day, as PECO filed it. PECO's advance filing states its winter design day requirement as "926,731 mcf or 961,020 dth", so the 926,731 Mcf in the summary and the 961,020 Dth in the table are the same design day quantity in two units, in PECO's own words.2

Winter Design day demand Projected total assets Gap % gap
2026-2027 961,020 977,873 16,853 2%
2027-2028 965,662 977,873 12,211 1%

PECO's Table SA-3, design day demand against projected total assets, Dth per day, PECO system, as filed. The 2026-2027 assets include 36,000 Dth per day of hedged gas under executed contracts. Source: PECO 2026 Purchased Gas Cost filing, testimony.1

PECO described the 2% as "the current firm gap between total assets and design day demand" that the acquisition of firm assets will eliminate, and said that by 2027-2028 it projects a deficit beyond the design day of 1%.1

PGW. PGW's Form IRP-Gas 1B lists total peak day gas requirements of 589 MMcf for 2026-2027 and 590 MMcf for 2027-2028, and Form 2A lists net peak day gas supply of the same volumes; the forms show no separate reserve margin, so the margin on the coldest day is not shown. PGW said its design day load is derived for a day at 0 degrees Fahrenheit and its design hour for a day at -5 degrees Fahrenheit, while a footnote to its forms says the peak day is forecast at 2 degrees; it also said that it intends to supply all current firm customers on the coldest day and assumes expiring contracts are renewed.3

PGW's figures come from its 2026-2027 gas cost filing (prefiling February 2026, tariff filing March 2026), which includes the Annual Resource Planning Summary Report PGW filed in March 2025; no later PGW resource plan was found.

South Jersey Gas. South Jersey Gas defines its design day as a day with an average temperature of 2 degrees Fahrenheit, or 63 heating degree days.4

Winter Design day requirements (Dth) Design day supplies (Dth) Excess (Dth)
2026-27 568,043 722,455 154,412
2027-28 577,135 647,455 70,320
2028-29 586,513 657,455 70,942

South Jersey Gas's design day forecast, Schedule MCM-6, Dth, whole South Jersey Gas system, as filed (excess is the schedule's "Excess / (Shortfall)" line).4

PSE&G. PSE&G's Schedule F gives peak day supply, requirements and surplus for its whole system, based on a 3% Loss of Load Probability.5

Winter Peak day supply (MDth) Peak day requirements (MDth) Surplus as % of requirements (calculated)
2026-2027 3,245.6 3,100.5 4.7%
2027-2028 3,243.9 3,088.9 5.0%
2028-2029 3,236.5 3,080.0 5.1%

PSE&G Schedule F, whole PSE&G system, MDth; the last column is our calculation of supply less requirements, divided by requirements.5

The BPU's June 2022 order, summarizing a consultant's report for New Jersey firm customers, said there would be a statewide surplus of 274 MDth per day under the winter design day and a shortfall of 153 MDth per day on a 1-in-90 design day.6

What is driving new natural gas demand?

The utility filings we reviewed name no new large load by customer or service date. PECO said that its projected growth in design day and overall demand supports its continuing review of how to manage its natural gas supply portfolio.2 The one data center gas load with a stated size that we found is a backup-power plant in Bucks County, described below; a 2.5 MW combined heat and power engine at a Montgomery County plant is also planned.15

EIA's September 2026 generator inventory lists one planned natural gas-fired generator in the Pennsylvania counties: a 2.5 MW combined heat and power engine at Merck's West Point plant in Montgomery County, planned for December 2026.9 No record names its gas supplier. The inventory lists none in the four New Jersey counties.19 It also lists two 391 MW natural gas steam units at Eddystone Generating Station in Delaware County with a planned retirement in November 2026; they are electric generators.27

In our search of Federal Energy Regulatory Commission (FERC) pipeline notices from July 31 to October 29, 2026, one names a Pennsylvania metro county: the October 2026 Eastern Shore notice for Chester County, described under "What's new".28 A June 2025 Transco notice on its Northeast Supply Enhancement project also names Chester County; it names no utility read for this page and no gas load.30

Data centers: As of October 29, 2026, the one data center gas load we found is Amazon's campus at 600 Ben Fairless Drive in Falls Township, Bucks County. In April 2026 Amazon applied to the Pennsylvania Department of Environmental Protection (DEP) to install 280 natural gas-fired generator engines of 4,287 horsepower each and three diesel engines, which DEP says would provide backup electricity only during a main utility power interruption and for limited testing.15 DEP's page lists the proposed approval and no final approval.17

The records we reviewed do not name the gas supplier. Williams presented a "Keystone Meter Station" at DEP's July 14, 2026 public meeting, and PECO's slides there covered electric service only.18 We cannot say whether the engines would draw gas from PECO's system, making this a load on PECO, or directly from a pipeline, bypassing it.16

Nearby: Transco's Leidy Access Expansion is in Luzerne County, Pennsylvania, which is not in the metro, and its notice names no shipper, so we cannot tie it to a utility here.21

Are upgrades arriving in time?

For 2026-2027 PECO said it will use 36,000 Dth per day of delivered supply from its Ratable Hedging program against 16,853 Dth per day of required delivered supply, and it will issue a request for proposals for any further delivered resources. For the longer term it said it is evaluating pipeline open seasons and capacity releases and is continuing its LNG investment at West Conshohocken, with the objective of eliminating the peak-day supply gap.2

The Pennsylvania Public Utility Commission (the Commission) approved without modification PECO's 2026 gas cost settlement on October 1, 2026 and PGW's 2026-2027 settlement on July 16, 2026; neither order addresses design day or capacity.7

South Jersey Gas said its 75,000 Dth Adelphia/Columbia entitlement is listed for 2026-27 and not after, that its primary operational concern is meeting design day requirements without that path, and that asset management agreements and more Columbia supply substantially mitigate the risk.4

Who gets gas first in a shortage?

PGW's tariff says customers on its interruptible transportation rate are subject to curtailment or interruption at any time, and that PGW may curtail or interrupt whenever, at its sole discretion, it determines that available capacity in all or a portion of its system is projected to be insufficient. This is the tariff's wording, not a statement that any curtailment is expected.8 This page does not cover the tariffs of PECO, South Jersey Gas and PSE&G.

Winter and market context

NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the Ohio Valley and mid-Atlantic regions, a discussion that names regions and not counties.B1 National inventory, El Nino and liquefied natural gas export figures are in a note.25

NJNG's June 2026 filing lists the pipeline force majeure events described above. Transco, Texas Eastern and Columbia informational postings are not covered here, so we do not know of later notices.29

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal at the Philadelphia International Airport station in 2023-24 and 2024-25 and about at normal in 2025-26.22 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the Philadelphia area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027.23 The airport is one station standing for the metro, and NOAA's figures are probabilities for a three-month average, not a forecast of days.24

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 3289 3801 -13.5%
2024-25 3561 3801 -6.3%
2025-26 3822 3801 +0.6%

Heating degree days at the Philadelphia International Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

What's new (as of October 29, 2026)

Eastern Shore Natural Gas applied on September 24, 2026 (FERC docket CP26-585-000) for a project that includes a 2.55-mile pipeline loop in Chester County and would add 15,800 Dth per day of firm service for Chesapeake Utilities' Delaware Division and Easton Utilities Commission.20 Transco applied on September 4, 2026 to add 183,100 Dth per day of firm transportation in Luzerne County, which is not in the metro.21 As of October 29, 2026, DEP's page lists Amazon's 280-engine application in Bucks County as a proposed approval with no final approval.17

What should Philadelphia-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which service. Confirm whether each site takes firm or interruptible service; PGW's tariff says interruptible transportation customers are subject to curtailment or interruption at any time.
  • Which utility. Confirm whether the site is served by PECO, PGW, PSE&G, South Jersey Gas, New Jersey Natural Gas, Delmarva Power or another utility, because the records differ by utility.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track PECO's next Purchased Gas Cost filing and its LNG project, and South Jersey Gas's next BGSS filing.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Philadelphia businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does Philadelphia have on the coldest day?' for what each utility's filing says about its whole system.

Is there spare gas capacity in the Philadelphia area on the coldest day?

It depends on the utility, and the record is system-wide. PECO lists a firm gap, PGW's supply equals its requirement, and South Jersey Gas shows an excess. See 'How much spare gas capacity does Philadelphia have on the coldest day?'

Did the Commission decide whether PECO has enough gas capacity?

No. The Commission approved the settlement of PECO's 2026 gas cost proceeding without modification on October 1, 2026; the order does not address design day or capacity. See 'Are upgrades arriving in time?'

Is new demand driving gas use in the Philadelphia area?

PECO said its projected growth in design day and overall demand supports a continuing review of its supply portfolio, and Amazon has applied for gas-fired backup engines at a Bucks County data center. See 'What is driving new natural gas demand?'

Who is cut first if PGW must curtail service?

PGW's tariff says interruptible transportation customers are subject to curtailment or interruption at any time. This page does not cover the interruption terms of the other utilities.

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Whether gas supply events since 2020 affected the systems serving Philadelphia. No official record we reviewed reports one.
  • Who pays when capacity is short, and the order of interruption. The records we reviewed do not give cost allocation among customer classes or the interruption terms for PECO, South Jersey Gas, PSE&G or Delmarva Power.
  • When PECO's added LNG vaporization will be in service, what it will cost, and whether the Commission has approved it. The filing refers to PECO's petition, but we did not find its outcome.
  • Design-day demand for Delmarva Power and New Jersey Natural Gas, and any figures for Chesapeake Utilities and Elkton Gas in Delaware and Maryland. The records we could use do not give them.
  • Capacity figures specific to Chester County. The UGI Gas and Columbia Gas PA records give system-wide figures only.

Notes

  1. PECO Energy Company, 2026 Section 1307(f) Purchased Gas Cost filing, testimony and exhibits (Pennsylvania PUC Docket R-2026-3062148; filed on or about June 1, 2026), PDF 13 (design day requirement), PDF 24 and PDF 25 (Table SA-3 and the testimony on the gap and deficit); Pennsylvania PUC dockets listed in the Discovery Energy utility-to-county crosswalk; metro counties from the OMB Bulletin No. 23-01 county list. Utility statements. ↩
  2. PECO Energy Company, same filing, PDF 22 and PDF 23 (delivered supply, Ratable Hedging program, LNG vaporization, peak-day supply gap), PDF 21 (growth in design day); and PECO's advance filing information, Section 16, PDF 189 (design day basis) and PDF 198 (design day requirement stated as "926,731 mcf or 961,020 dth"). Table SA-3 as filed: the page reproduces its figures and PECO's words and does not restate the table's sign convention. PECO's LNG vaporization capability at West Conshohocken, in Montgomery County, is 160,000 Mcf per day now, and PECO said it continues to take actions to raise it to 220,000 Mcf per day. ↩
  3. Philadelphia Gas Works, 2026-2027 Gas Cost Rate prefiling (Docket R-2026-3060186; prefiling February 2026), Tab 04, Annual Resource Planning Summary Report filed March 2025, Forms IRP-Gas 1B (PDF 500), 2A (PDF 502), 2C (PDF 504), Sections I and IV (PDF 508 and PDF 517). Volumes in MMcf; PGW's peak day is forecast at a 2 degree temperature (footnote to the forms, PDF 500 and 502: "Peak Day is forecasted at a 2 degree temperature"; a second footnote gives 5 degrees for the current year). Section IV (PDF 517) states the design day load "for a 0 degrees Fahrenheit day" and the design hour for -5 degrees; the filing does not say why the two differ. The expiration dates are matched to the storage rows by their order. Utility statements. PGW's figures come from its 2026-2027 gas cost filing (prefiling February 2026, tariff filing March 2026), which includes the Annual Resource Planning Summary Report PGW filed in March 2025; no later PGW resource plan was found. ↩
  4. South Jersey Gas Company, 2026-27 BGSS and CIP filing (June 1, 2026), Schedule MCM-6 (PDF 147) and testimony of Maria C. Mendoza (PDF 115 and PDF 213). Utility statements. The 12.2% is our calculation (illustrative): 70,320 divided by 577,135. By our calculation the excess for 2027-28 is 12.2% of that year's design day requirement, from 70,320 and 577,135. ↩
  5. Public Service Electric and Gas Company, 2026 BGSS-RSG filing (May 29, 2026), Item 16 Schedule F Peak Day Gas Requirements and Supply, PDF 94. Utility statements. The surplus percentages are our calculation (illustrative): supply less requirements, divided by requirements. The two later winters in the same schedule (3,225.7 and 3,208.9 MDth of supply against 3,080.6 and 3,078.6 MDth of requirements) calculate to 4.7% and 4.2%; this page shows the first three winters. ↩
  6. New Jersey Board of Public Utilities, Order, Gas Capacity (June 29, 2022), summarizing the report of London Economics International (public, redacted copy saved). Commission order; statewide. ↩
  7. Pennsylvania Public Utility Commission, Orders at Docket R-2026-3060186 (public meeting July 16, 2026) and Docket R-2026-3062148 (public meeting October 1, 2026). Commission orders. The Commission is the Pennsylvania Public Utility Commission. ↩
  8. Philadelphia Gas Works, Gas Services Tariff, Supplement 188 (effective September 2026), Rate Schedule IT, PDF 110 and PDF 157. Utility tariff. ↩
  9. EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to the Pennsylvania, New Jersey, Delaware and Maryland metro counties by our own calculation, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, also our own calculation. Our first search used the singular form (for example "Chester County") and missed notices that name counties in the plural; a second search of the plural forms found the notice in note 30. A notice that spells a place differently would still be missed. ↩
  10. UGI Utilities, Inc. - Gas Division, 2026 base rate case (Pennsylvania PUC Docket R-2025-3059523), Book II, Attachment SDR-COS-10 page 5 (PDF 22) and Book X, tariff Supplement No. 59, Description of Territory (PDF 11). Utility statements, system-wide. The 2.6% is our calculation (illustrative): capacity less requirements, divided by requirements. ↩
  11. Columbia Gas of Pennsylvania, Inc., 30-day 1307(f) pre-filing (Docket R-2026-3060762), Exhibit 5, Table 4 (PDF 171), and tariff Supplement No. 221 filed in Volume 5 of its 2024 rate case (Docket R-2024-3046519; PDF 21). Utility statements, system-wide. The 16.8 and 2.6% are our calculation (illustrative) from the printed Net Capacity and Total Demand. ↩
  12. Delmarva Power & Light Company, Application for approval of its 2025-2026 Gas Cost Rate (Delaware Public Service Commission Docket 25-0832, filed August 28, 2025; public version), direct testimony and Schedules DPC-1 (PDF 64) and DPC-2; Delaware Public Service Commission, Findings, Opinion and Order No. 11056 (July 15, 2026); Exeter Associates memorandum to Staff (January 20, 2026); tariff compliance filing (July 20, 2026). Utility statements, a Commission order and a consultant memorandum; Delmarva Power's figures are for its whole Delaware gas system. The shares in the table are our calculation (illustrative): contract volume divided by 218,484 and by 119,456. The six firm transportation rows add to 119,457; the schedule prints a subtotal of 119,456 (a difference of 1, in the source), and the shares use the printed subtotal. The records read do not give, for Delmarva Power, a design day demand figure, the margin, who pays among customer classes, the interruption sequence, supply events since 2020, or the text of the Strategic Natural Gas Supply Plan. Exeter reviewed Delmarva Power's 2025-2026 through 2030-2031 Strategic Natural Gas Supply Plan. By our calculation the LNG share is 27.5% of the 218,484 Mcf per day of supply deliverability (supply, not demand). ↩
  13. New Jersey Natural Gas Company, 2027 BGSS and CIP annual filing (petition, testimony of Shah, Micak and Peracchio, exhibits JSS-1 to JSS-5), BPU Docket GR26060281, June 1, 2026, PDF 92 and 93 (planning and pipeline events), PDF 102 and 103 (Exhibits JSS-2 and JSS-3) and PDF 106 (Exhibit JSS-5). Utility statements;, October 26, 2026. The county placement is from the EIA-176 crosswalk, not the filing. ↩
  14. The metro's counties are Philadelphia, Bucks, Chester, Delaware and Montgomery in Pennsylvania; Burlington, Camden, Gloucester and Salem in New Jersey; New Castle in Delaware; and Cecil in Maryland (OMB Bulletin No. 23-01, July 21, 2023). Serving utilities are taken from the Discovery Energy crosswalk built from EIA-176 county lists: PECO and PGW in Pennsylvania, with UGI Utilities and Columbia Gas of Pennsylvania also listed for Chester County; PSE&G, South Jersey Gas and New Jersey Natural Gas in New Jersey; Delmarva Power and Chesapeake Utilities in Delaware; and Chesapeake Utilities and Elkton Gas in Maryland. This page reads the records for PECO, PGW, South Jersey Gas, PSE&G and Delmarva Power, New Jersey Natural Gas's June 2026 filing (a section below, for events, interruptions and contract changes, not its design day), and, for Chester County, the system-wide records of UGI Utilities and Columbia Gas of Pennsylvania (a section below). It does not cover Chesapeake Utilities or Elkton Gas in the metro: those are coverage gaps, and New Jersey Natural Gas's design day forecast was not read, so confidence is Medium. The figures are system-wide tables that the utilities do not allocate by county; they are the most local figures the record has, and each is labeled by its geography. ↩
  15. Pennsylvania Department of Environmental Protection, news release "DEP to Host Community Meeting on Proposed Air Quality Permit for Amazon Data Center in Falls Township, Bucks County," July 13, 2026, accessed October 29, 2026: Amazon submitted a plan approval application in April 2026 for 280 natural gas-fired generator engines and three diesel-fired emergency generator engines, which "will only provide backup electricity to the data center in the event of a main utility power supply interruption" and for limited testing and maintenance. DEP's information sheet places the campus at 600 Ben Fairless Drive. ↩
  16. DEP, Air Quality Proposed Plan Approval 09-0261A, Amazon Data Services Inc. (Source ID 104, PDF 25: 280 INNIO Jenbacher J620 natural gas-fired backup engines, each 4,287 horsepower and 3,000 kilowatts of electric output; PDF 22: 27,331 cubic feet per hour of natural gas per source line; PDF 31: fuel limit of 7,453 million standard cubic feet in a rolling 365-day period for the gas engines while their emission controls operate; PDF 33: compliance by using pipeline-quality natural gas). By our calculation 280 engines at 27,331 cubic feet per hour would use about 7.65 million cubic feet per hour at full load, 280 times 3,000 kilowatts is 840 MW of backup capacity, and the annual limit averages about 20.4 million cubic feet per day; these are permit figures for backup use, not forecasts of gas deliveries, and none names the gas supplier. We make no comparison with any utility's design day. ↩
  17. DEP Southeast Regional Office web page, section "Amazon Data Center - Falls Township," accessed October 29, 2026: it lists Air Quality Proposed Plan Approval 09-0261A and the Phase 2 application and no final approval. ↩
  18. Williams Companies, slides "Keystone Meter Station," DEP public meeting, July 14, 2026, slides 1 and 6 (slide 6 describes a meter station as the point where distribution companies and major users receive gas from transmission pipelines; slides 3 and 4 are images we could not read); PECO Energy Company, slides "Understanding Data Centers and their Impact on the Electric Grid," July 14, 2026, slide 5 (electric transmission and distribution service for the Falls Township project); Amazon, slides, July 14, 2026, slide 7 ("Generators are used infrequently, mostly for testing and emergency situations"). Company slides posted by DEP. News reports on the supply route are leads only and are not cited. ↩
  19. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, Planned sheet, row 326: West Point (PA), operator Merck & Co Inc-West Point, Montgomery County, industrial combined heat and power, 2.5 MW natural gas internal combustion engine, under construction and more than 50 percent complete, planned December 2026. An earlier version of this page gave 2 MW; the row says 2.5 MW. The Planned sheet lists no planned gas unit in the four New Jersey counties. ↩
  20. Federal Register, Federal Energy Regulatory Commission, Notice of Application and Establishing Intervention Deadline, Eastern Shore Natural Gas Company, Docket CP26-585-000, document 2026-20659, published October 8, 2026, pages 64368 and 64369: application filed September 24, 2026 for the Delmar Regional Enhancement Project, including the approximately 2.55-mile, 24-inch Parkesburg-Daleville Loop in Chester County, Pennsylvania, replacement of two segments of the Tidewater Line in New Castle County, Delaware, and a 1.85-mile loop in Cecil County, Maryland; the project is fully subscribed, would provide 15,800 dekatherms per day of incremental firm transportation to Easton Utilities Commission and Chesapeake Utilities Corporation--Delaware Division at negotiated rates, and is estimated to cost $75,130,000. The shippers are not PECO, PGW or the other utilities read for this page. ↩
  21. Federal Register, Federal Energy Regulatory Commission, Notice of Application and Establishing Intervention Deadline, Transcontinental Gas Pipe Line Company, LLC, Docket CP26-576-000, document 2026-19580, published September 24, 2026, page 60613: Leidy Access Expansion Project, application filed September 4, 2026, 3.38 miles of 42-inch loop and related facilities, all in Luzerne County, Pennsylvania, 183,100 dekatherms per day of incremental firm transportation, estimated cost $54.7 million; the notice names no shipper. ↩
  22. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Philadelphia International Airport (station USW00013739). Sums are our calculation. Heating degree days behind the percentages: 3289 in 2023-24, 3561 in 2024-25 and 3822 in 2025-26, against a 1991-2020 normal of 3801. ↩
  23. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Philadelphia location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for both periods Philadelphia has at least a 40% chance of above-normal temperatures, about 33% near-normal and no more than 27% below-normal. ↩
  24. The station is Philadelphia International Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  25. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. NOAA's Climate Prediction Center puts the probability of at least a strong El Nino continuing through January to March 2027 at 80% (source B1). These are national and regional facts, not statements about these utilities' systems. ↩
  26. The contracts are listed in the filings cited in Notes 3, 4, 14 and 15: PGW's storage list includes Texas Eastern contracts; South Jersey Gas's Adelphia/Columbia entitlement; Delmarva Power's Transco, Columbia and TETCO contracts; NJNG's Transco and Columbia events and TETCO contract. ↩
  27. U.S. Energy Information Administration, EIA-860M, September 2026, Operating sheet, rows 4592 and 4594: Eddystone Generating Station, Constellation Power, Inc., Delaware County, units 3 and 4, 391 MW each, natural gas steam turbine, planned retirement November 2026. Mickleton Station (Calpine New Jersey Generation LLC, Gloucester County, 71.2 MW natural gas combustion turbine) is on the Retired sheet as retired in June 2024. All are electric generators. ↩
  28. Federal Register search of FERC notices published July 31 to October 29, 2026, by county phrase and by pipeline and utility name; it found no notice naming Montgomery, Delaware, Bucks, Gloucester, Burlington or Camden county, South Jersey Gas or Philadelphia Gas Works, and one naming Chester County, Pennsylvania and New Castle County (the Eastern Shore notice in Note 20). It found no abandonment, deactivation or pressure-restriction notice for a pipeline serving the metro. The Transco, Texas Eastern, Columbia, Eastern Gas Transmission, Adelphia and Tennessee combined notices of filings were not read one by one. The search covered notices published since July 31, 2026. ↩
  29. Transco, Texas Eastern and Columbia informational postings are JavaScript portals that we could not capture; no pipeline posting is cited on this page. ↩
  30. Federal Register, Federal Energy Regulatory Commission, Transcontinental Gas Pipe Line Company, LLC, Notice of Petition and Establishing Intervention Deadline, document 2025-10389, published June 9, 2025, pages 24272 to 24274 (dockets CP17-101-007 and CP20-49-001): Transco's petition of May 29, 2025 to reissue its certificate for the previously approved Northeast Supply Enhancement Project, which it says is designed to provide 400,000 Dth per day of incremental firm transportation, at an estimated cost of about $926.5 million. The facilities include adding 21,902 horsepower "at its Compressor Station (CS) 200 in Chester County, Pennsylvania", plus loops and a compressor station in New Jersey and Pennsylvania counties outside this metro's utilities, such as Middlesex County, New Jersey. The notice names no shipper or utility and no gas load. We did not read the petition itself. Our Federal Register search covered notices since January 1, 2025. This note 30 lists the June 2025 Transco notice; the October 2026 Eastern Shore notice is in note 28. ↩

Market and weather sources

Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
  3. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩

Sources

  1. PECO Energy Company, 2026 Section 1307(f) filing, Pennsylvania PUC Docket R-2026-3062148. Link
  2. Philadelphia Gas Works, 2026-2027 Gas Cost Rate filing, Pennsylvania PUC Docket R-2026-3060186. Link
  3. South Jersey Gas Company, 2026-27 BGSS and CIP filing. Link
  4. Public Service Electric and Gas Company, 2026 BGSS-RSG filing. Link
  5. New Jersey Board of Public Utilities, Order, Gas Capacity, June 29, 2022. Link
  6. Philadelphia Gas Works, Gas Services Tariff. Link
  7. Delaware Public Service Commission, Docket 25-0832, Delmarva Power & Light Company 2025-2026 Gas Cost Rate (DelaFile; logged in the source register).
  8. New Jersey Natural Gas Company, 2027 BGSS and CIP annual filing, New Jersey Board of Public Utilities Docket GR26060281, June 1, 2026. Link
  9. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  10. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  11. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  12. Pennsylvania Department of Environmental Protection, News release: DEP to Host Community Meeting on Proposed Air Quality Permit for Amazon Data Center in Falls Township, Bucks County, July 13, 2026. Link
  13. Pennsylvania Department of Environmental Protection (Southeast Regional Office), Air Quality Proposed Plan Approval 09-0261A, Amazon Data Services Inc., Falls Township. https://files.dep.state.pa.us/RegionalResources/SERO/SEROPortalFiles/Community%20Info/AmazonDCFallsTwp/Air%20Quality%20Proposed%20Plan%20Approval,%2009-0261A.pdf
  14. Williams Companies (presentation posted by Pennsylvania DEP), Keystone Meter Station, PA DEP Public Meeting, July 14, 2026. Link
  15. PECO Energy Company (presentation posted by Pennsylvania DEP), Understanding Data Centers and their Impact on the Electric Grid, July 14, 2026. Link
  16. Federal Register (FERC Notice), Eastern Shore Natural Gas Company; Notice of Application and Establishing Intervention Deadline, Docket CP26-585-000, FR 2026-20659, October 8, 2026. Link
  17. Federal Register (FERC Notice), Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, Docket CP26-576-000, FR 2026-19580, September 24, 2026. Link
  18. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00013739. Link
  19. Federal Energy Regulatory Commission (Federal Register), Federal Register document 2025-10389, 2025-06-09. Link

Corrected November 9, 2026: the earlier version said no Federal Energy Regulatory Commission pipeline notice since January 1, 2025 named a Pennsylvania county in the metro; a June 2025 Transco notice names Chester County, and the page now says so. It also gave the West Point plant engine as 2 MW; the EIA inventory lists 2.5 MW.