Pennsylvania natural gas case study, UGI Gas territory (Harrisburg, Lancaster, Reading, Allentown and Scranton). November 2026
Pennsylvania gas capacity: one thin peak-day margin and one supply line labeled "Supply TBD"
UGI Gas's January 2026 filing shows 2026-27 peak-day firm capacity of 2,340,671 Dth against requirements of 2,280,283 Dth, about 2.6% more, for its whole 46-county system; 30,436 Dth of that is labeled "Supply TBD".
Metro used: the Harrisburg-Carlisle, Lancaster, Reading, Allentown-Bethlehem-Easton and Scranton--Wilkes-Barre, PA metropolitan statistical areas, as delineated in OMB Bulletin No. 23-01 (July 21, 2023); the county lists are in Note 5. UGI Utilities, Inc. (UGI Gas) lists ten of their twelve counties in its tariff; its peak-day figures below are whole-system figures shared by the five metros, so items outside the metros are labeled system context.5
Key takeaways
- The capacity figures are UGI Gas's whole-system numbers for 46 counties; the record does not split them by metro.1
- Without the 30,436 Dth line labeled "Supply TBD", the margin is 29,952 Dth or about 1.3%, and the record does not say whether that line is contracted.2
- Peaking services from UGI Energy Services are the largest line in UGI Gas's supply subtotal, 479,187 Dth (21.0% of requirements); large-customer third-party capacity is 848,207 Dth.3
- On October 1, 2026 the Pennsylvania Public Utility Commission adopted UGI Gas's rate settlement without modification: $65 million in two steps.8
- In step one, residential takes 74.3% of the increase, non-residential N/NT 23.6% and large firm LFD 1.8%; the interruptible and XD-Firm classes show small decreases.7
- Rule 21: UGI Gas first tries interruption, flow orders and voluntary cuts; mandatory cuts to non-Priority 1 commercial and industrial customers are set without regard to priorities of use.9
What is the outlook for gas capacity in UGI Gas's Pennsylvania territory through 2029?
Discovery Energy rates the outlook for natural gas capacity in UGI Gas's Pennsylvania territory (the Harrisburg-Carlisle, Lancaster, Reading, Allentown-Bethlehem-Easton and Scranton--Wilkes-Barre metros) through 2029 as High (confidence: Medium): UGI Gas's own 2026-27 peak-day schedule shows a margin of about 2.6%, or about 1.3% without a supply line labeled "Supply TBD" that the record does not show as contracted. The record shows no approved or scheduled fix, negative balance or need date. Every capacity figure is system-wide. Two documented risks, listed next, add to that concern. Documented risk factors: two. The first is concentration (heavy reliance on one supply source), since UGI Energy Services peaking services are 21.0% of 2026-27 peak-day requirements, our calculation from UGI Gas's figures. The second is expiring supply: two Columbia Gas Transmission contracts, a storage service and a transportation service of 126,473 Dth per day each, both end March 31, 2030, and no replacement is shown in the record we reviewed. The transportation contract is 15.7% of UGI Gas's firm interstate pipeline capacity, our calculation from the contracts on UGI Gas's list, above the 10% we treat as key, and we count the two contracts once, as one arrangement.12 We do not count the proposed Newport Township data center campus as new load ahead of the fix: the only source is the developer, and no filing, gas volume or service date is given.14 With two documented risk factors, the level is raised from Elevated to High. Three developments would change the assessment: UGI Gas's next peak-day schedule, including whether the "Supply TBD" line is contracted or identified and what the margin is, or any approved or scheduled capacity addition; any change in UGI Gas's reliance on peaking services from UGI Energy Services; a capacity filing, or a rate case after the January 15, 2029 stay-out date, that shows a negative balance.
Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.
Who serves the Harrisburg, Lancaster, Reading, Allentown and Scranton areas?
UGI Gas's tariff lists 46 counties, including ten of the twelve counties in the five metros (see the table). Two are not, Perry County, Pennsylvania (Harrisburg-Carlisle) and Warren County, New Jersey (Allentown-Bethlehem-Easton), so the record does not identify the serving utility for either.5
| Where | Counties |
|---|---|
| Inside a metro, in UGI Gas's tariff (10) | Cumberland, Dauphin (Harrisburg-Carlisle); Lancaster (Lancaster); Berks (Reading); Carbon, Lehigh, Northampton (Allentown-Bethlehem-Easton); Lackawanna, Luzerne, Wyoming (Scranton--Wilkes-Barre) |
| Metro county not in UGI Gas's tariff (2) | Perry (Harrisburg-Carlisle); Warren, New Jersey (Allentown-Bethlehem-Easton) |
| Outside the five metros, system context (36) | The other counties of UGI Gas's territory, from Adams to York |
UGI Gas's tariff territory, by whether each county is in one of the five metros (OMB delineation). Source: UGI Gas tariff, Pa. P.U.C. No. 7, Description of Territory.5
Every capacity figure on this page is UGI Gas-wide. The record does not allocate any of it to a county or a metro, so the same figures apply to all five metros. It gives no UGI Gas customer count or load for any metro or county, and the filings reviewed do not say whether another gas utility serves part of these counties.
The tariff we reviewed, Pa. P.U.C. No. 7, lists ten of the twelve metro counties in one Description of Territory, and the whole-system peak-day schedule below lists supply lines by supplier and pipeline, not by contract; the firm transportation contracts list in the same filing shows peaking contracts with UGI Energy Services; the filings do not say which lines serve which area or how the 2026-27 schedule divides among them.12
System context: gas reaches these counties through pipelines outside the metros, so projects and notices elsewhere on UGI Gas's nine interstate pipelines may matter to a facility in the five metros even when they name no metro county; the filing does not show which pipelines feed which metro.11
Harrisburg-Carlisle
Cumberland, Dauphin and Perry counties. UGI Gas's tariff lists the City of Harrisburg and many Dauphin and Cumberland County boroughs and townships; Perry County is not listed.5
Lancaster
Lancaster County. UGI Gas's tariff lists Lancaster County, including the City of Lancaster, many boroughs and many townships.5
Reading
Berks County. UGI Gas's tariff lists Berks County, including the City of Reading, many boroughs and many townships.5
Allentown-Bethlehem-Easton
Carbon, Lehigh and Northampton counties in Pennsylvania and Warren County in New Jersey. UGI Gas's tariff lists Lehigh County, including the City of Allentown and part of the City of Bethlehem; Northampton County, including the City of Easton and part of Bethlehem; and six Carbon County boroughs.5
The tariff names municipalities and marks some "(part)", so it does not show that UGI Gas serves every address in a county. UGI Gas's peak-day data for February 18, 2025 list a daily average temperature of 20 degrees F for the weather area it labels Reading/Harrisburg/Lehigh/Lancaster/Altoona, which is wider than the metro.4
Scranton--Wilkes-Barre
Lackawanna, Luzerne and Wyoming counties. UGI Gas's tariff lists Lackawanna County, including the Cities of Carbondale and Scranton; Luzerne County, including the Cities of Hazleton, Nanticoke, Pittston and Wilkes-Barre; and five Wyoming County boroughs, and townships in each county.5 UGI Gas's peak-day data for February 18, 2025 list a daily average temperature of 15 degrees F for the weather area it labels Wilkes-Barre/Scranton.4
How much spare gas capacity does UGI Gas's Pennsylvania territory have on the coldest day?
In words: what the map shows
- Pipelines labeled: Tennessee Gas Pipeline; Eastern Gas Transmission and Storage; Columbia Gas Transmission; Texas Eastern; Transco.
- Metro counties outlined (12): Berks County; Carbon County; Cumberland County; Dauphin County; Lackawanna County; Lancaster County; Lehigh County; Luzerne County; Northampton County; Perry County; Warren County; Wyoming County.
- Cities and towns labeled include: Baltimore; Allentown; Reading; Scranton; Lancaster; Harrisburg.
- Other gas pipelines in the area are drawn in gray and are not labeled.
- Highways are drawn for orientation. A small state locator map sits in a corner.
UGI Gas said its distribution systems are fed directly by nine interstate pipelines, including Tennessee Gas Pipeline, Columbia Gas Transmission, Transcontinental Gas Pipe Line Company (Transco), Texas Eastern and Eastern Gas Transmission and Storage; some systems are fed by several pipelines and others are isolated feeds, and the filing does not say which pipeline serves which county.11
UGI Gas's schedule, headed "Peak Day Capacity Requirements and Supply Options" for the year ending September 30, 2027, is in dekatherms (Dth).1
| Peak-day item, year ending September 2027 | Dth |
|---|---|
| Company supply and capacity subtotal (includes 30,436 labeled "Supply TBD") | 1,492,464 |
| Third-party capacity held for large customers | 848,207 |
| Total firm capacity | 2,340,671 |
| PGC-1 requirements | 963,774 |
| CHOICE requirements | 243,984 |
| Firm transportation requirements | 1,072,525 |
| Total requirements | 2,280,283 |
| Firm capacity minus requirements (our calculation, illustrative) | 60,388 |
| Same, excluding the "Supply TBD" line (our calculation, illustrative) | 29,952 |
UGI Gas's peak-day capacity and requirements for the year ending September 2027, system-wide, from its January 2026 data request response. The last two rows are our subtraction.12
Discovery Energy's outlook method treats a projected reserve below 5% of design day as a thin margin; both figures above are below it. UGI Gas's schedule is headed "Peak Day Capacity Requirements and Supply Options" and does not call the figure a design day, so we apply the 5% measure to its total requirements. The schedule shows no negative balance, no need date and no project.
UGI Gas's annual peak-day sendout, interruptible service included, was 1,648.9 MDth in February 2023, 1,705.6 in January 2024 and 1,694.6 in February 2025. On those three days, respectively, the Reading, Harrisburg, Lehigh, Lancaster and Altoona area temperature was 16, 18 and 20 degrees Fahrenheit. These are actual days, a different measure from the 2026-27 requirements schedule, and the record does not compare them.4
What is driving new natural gas demand?
We found one proposed data center campus in the five metros that would use natural gas: Fit Energy's in Newport Township, Luzerne County, in the Scranton--Wilkes-Barre metro.14 The UGI Gas books reviewed document no data center, gas-fired generator or other new large load in any of the five metros.10
A search of other official records found no planned gas-fired generator in any of the 11 Pennsylvania counties: EIA's September 2026 generator inventory lists none, and PJM's Transition Cycle 1 Phase III list shows eight Pennsylvania projects, all solar or solar with storage. Our Federal Register search of FERC notices since January 1, 2025 found none naming eight of the counties; the notices that name Luzerne, Lancaster and Berks county are described below.13 The search did not find a filing for a new delivery point or lateral to UGI Gas, and what the record does not show is listed in the section What this page does not cover.
Data centers: As of October 29, 2026, Fit Energy proposes a campus of about 1,386 acres on former mining land in Newport Township, Luzerne County, which the township zoned for a data center and a fuel cell power use in August 2026.14
Fit Energy says natural gas service would support on-site fuel cells that supply part of the campus's power, with grid power for the rest, that gas routing, metering, pressure control and delivery facilities are being evaluated, and that the points of interconnection and ownership are under study.15
Newport is among the Luzerne County townships in UGI Gas's tariff territory, so the campus is in UGI Gas's listed area, but no filing we found says who would supply its gas or how much it would use.16
We found no other data center gas load in the 11 Pennsylvania counties of the five metros.10 This page does not cover Warren County, New Jersey.
Elsewhere in Pennsylvania: UGI Energy Services, the UGI affiliate that is not the gas utility, and Prime Data Centers announced in May 2026 a plan for a dedicated pipeline to an on-site gas-fired plant for a data center in Pennsylvania's northern tier, with gas demand expected to exceed 100,000 Dth a day within three to five years; the release names no county and does not say UGI Gas would serve the campus; it lists the UGI Utilities distribution network only among the supply systems present in the northern tier.17
PPL, an electric utility, reported on August 7, 2026 a Pennsylvania data center pipeline of 31.8 GW in advanced stages of planning; the release names no county and does not say how much would use gas.18
In the Allentown-Bethlehem-Easton metro: EIA lists two 850.5 MW natural gas steam units at Talen's Martins Creek plant in Northampton County with planned retirement in June 2035; they are electric generators, not gas load.19
Two FERC items name other metro counties. Transco asked on May 29, 2025 to reissue its certificate for the Northeast Supply Enhancement Project, which includes a 10.17-mile Quarryville Loop in Lancaster County; the notice does not mention UGI Gas.23 UGI LNG, Inc. asked FERC on March 17, 2025 for a declaratory order that a new LNG storage and trucking terminal at its Temple LNG Plant in Berks County would not be subject to FERC jurisdiction; we did not find FERC's answer.24
What does this mean for business gas costs?
On October 1, 2026 the Commission adopted, without modification, the settlement of UGI Gas's base rate case, which allows $65 million in base rate increases in two steps: $40 million from October 1, 2026 and $25 million from October 1, 2027. The settlement bars UGI Gas from filing a general rate increase on or before January 15, 2029.8
| Rate class (step one) | Share of the $40.0 million increase | Change to present class revenue |
|---|---|---|
| R/RT residential | 74.3% | 3.7% |
| N/NT non-residential | 23.6% | 3.5% |
| DS | 0.7% | 0.8% |
| LFD large firm | 1.8% | 1.2% |
| XD-Firm | -0.2% | -0.2% |
| Interruptible | -0.2% | -0.3% |
Whole system, step one only: step-one revenue change by rate class as settled, UGI Gas-wide (Settlement Appendix B, proof of revenue). The second step's class split is not summarized here.7
This is the whole-system class allocation of a revenue increase. The record does not show how the capacity items above are costed by class, or any dollar effect on a customer in the five metros.7
Who gets gas first in a shortage?
UGI Gas's tariff Rule 21 says that, if time permits, before curtailing customers the company will use reasonable efforts to interrupt all interruptible services, issue operational flow orders or daily flow directives, and call for voluntary usage reductions. A mandated reduction on commercial and industrial customers that are not Priority 1 is "determined by the Company without regard to priorities of use" and lasts at most five consecutive business days unless the Commission extends it.9
Winter and market context
NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for regions it calls the Ohio Valley and mid-Atlantic; its discussion names regions, not Pennsylvania counties.B1 The national inventory, El Nino and liquefied natural gas export figures from EIA and NOAA do not bear on UGI Gas's system, so they sit in a note.30
Columbia Gas Transmission, one of the nine pipelines UGI Gas lists, has asked FERC to abandon three storage fields in Greene and Washington counties, Pennsylvania, and Marshall County, West Virginia; its notice says the facilities are no longer required to meet its current firm service obligations, does not say whether UGI Gas relies on them, and puts FERC's environmental assessment at November 30, 2026.22
Winter weather and NOAA's outlook
Heating degree days, a measure of how much heating the weather called for, come from one NOAA station near each metro, not the metro as a whole. NOAA's outlook issued October 15, 2026 gives each metro at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027, and Scranton--Wilkes-Barre at least 50% for the second period; these are probabilities for a three-month average, not a forecast of specific days.29
| Station (metro) | Winter 2023-24 | Winter 2024-25 | Winter 2025-26 | 1991-2020 normal |
|---|---|---|---|---|
| Harrisburg International Airport (Harrisburg-Carlisle and Lancaster) | 3597 (-13.9%) | 4082 (-2.3%) | 4433 (+6.1%) | 4178 |
| Reading Regional Airport (Reading) | 3608 (-14.1%) | 3935 (-6.4%) | 4240 (+0.9%) | 4202 |
| Lehigh Valley International Airport (Allentown-Bethlehem-Easton) | 3997 (-7.3%) | 4332 (+0.4%) | 4690 (+8.7%) | 4314 |
| Wilkes-Barre/Scranton International Airport (Scranton--Wilkes-Barre) | 4019 (-12.6%) | 4528 (-1.5%) | 4909 (+6.8%) | 4598 |
Heating degree days, base 65 degrees F, November to March, with the difference from the 1991-2020 normal in brackets. Source: NOAA Regional Climate Centers.
Harrisburg-Carlisle. Winters ran below the 1991-2020 normal at Harrisburg International Airport in 2023-24 and 2024-25 and above it in 2025-26.25
Lancaster. Lancaster has no station of its own, so the Harrisburg International Airport figures above stand in for it.
Reading. Winters ran below the normal at Reading Regional Airport in 2023-24 and 2024-25 and above it in 2025-26.26
Allentown-Bethlehem-Easton. Winters ran below the normal at Lehigh Valley International Airport in 2023-24 and above it in 2024-25 and 2025-26.27
Scranton--Wilkes-Barre. Winters ran below the normal at Wilkes-Barre/Scranton International Airport in 2023-24 and 2024-25 and above it in 2025-26.28
What's new (as of October 29, 2026)
On September 4, 2026 Transco applied to FERC for a 3.38-mile pipeline loop in Luzerne County that would add 183,100 Dth a day of firm transportation, with a target in-service date in the fourth quarter of 2027; the notices do not name the shippers.20 On October 6, 2026 Fit Energy announced the Newport Township data center described above.14 On October 5, 2026 UGI Gas filed Supplement 69 to its tariff, effective October 2, 2026, in compliance with the Commission's October 1 order.21
What should Pennsylvania facilities in UGI Gas's territory check now?
- Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
- Rate class and utility. Confirm each site's UGI Gas rate class and, for sites in Perry County, Pennsylvania, and Warren County, New Jersey, the serving utility.
- Firm or interruptible, and the terms. Know whether each account is firm or interruptible and the flow-order, reduction and plant-protection terms in Rule 21 before the first cold snap.
- Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
- Settlement step two. The second step of the base rate increase takes effect on October 1, 2027.
What to check in your contracts
| Area | What to check |
|---|---|
| Winter price spikes | Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes. |
| Delivery constraints | Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first. |
| Operational flow orders | What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you. |
| Expansion plans | Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date. |
Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.
Frequently asked questions
Will Harrisburg, Lancaster, Reading, Allentown and Scranton businesses face natural gas shortages this winter?
The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does UGI Gas's Pennsylvania territory have on the coldest day?'
How much spare gas capacity does UGI Gas have on its coldest day?
In its January 2026 data request response, UGI Gas's firm capacity exceeded peak-day requirements for the year ending September 2027 by 60,388 Dth, by our subtraction. That is a utility schedule for its whole system, not a Commission finding. We rate the outlook High (confidence: Medium): the margin is thin, and two documented risk factors, concentration on one supply source and expiring supply, raise the level. See 'How much spare gas capacity does UGI Gas's Pennsylvania territory have on the coldest day?'
Who is cut first if UGI Gas must curtail service?
Under Rule 21, UGI Gas first tries to interrupt interruptible service, issue flow orders and call for voluntary reductions. Mandatory reductions for commercial and industrial customers that are not Priority 1 are set without regard to priorities of use. See 'Who gets gas first in a shortage?'
How much did UGI Gas's rates go up in October 2026?
The Commission adopted a settlement on October 1, 2026 that allows $65 million in base rate increases in two steps. See 'What does this mean for business gas costs?'
Do the Harrisburg, Lancaster, Reading, Allentown and Scranton areas have a data center driving gas demand?
One campus is proposed: Fit Energy's data center with on-site natural gas fuel cells in Newport Township, Luzerne County, whose gas supply is not yet set. The UGI Gas filings document no data center load, and we found none in the other counties. See 'What is driving new natural gas demand?'
Related case studies
Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.
- Philadelphia area natural gas capacity case study (outlook: Elevated)
- York natural gas capacity case study (outlook: Elevated)
- Northern New Jersey natural gas capacity case study (outlook: Elevated)
- Albany natural gas capacity case study (outlook: Elevated)
- New York City and Westchester natural gas capacity case study (outlook: Elevated)
All gas capacity ratings by U.S. metro
Background for commercial and industrial energy buyers: Utility cost intelligence
Understand your capacity exposure
Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.
Schedule a reviewWhat this page does not cover
- Whether another gas utility serves part of Lancaster, Berks, Carbon, Lehigh, Northampton, Lackawanna, Luzerne or Wyoming County, and what the local stations, local capacity and local large loads are in the five metros. Only UGI Gas's filings are covered.
- Supply events since 2020 affecting UGI Gas. The filings give annual peak days only.
- Whether new large loads, data centers, capacity projects or new pipeline delivery points are planned. None showed up in the UGI filings. State air plan approvals and PJM's 2026 interconnection applications by county are not covered here.
- Whether any expiring supply contract has a decided replacement. UGI Gas's filing lists an end date for each contract and the record we reviewed does not say whether any has a replacement. We counted the Columbia contracts ending March 31, 2030 because no replacement is shown; a replacement shown later would change that count.
- Whether any pipeline serving UGI Gas has had a safety order or reduced pressure since 2020, and whether any storage withdrawal cap, permit or court delay for a fix, or choice supplier default applies. None showed up in the records this page draws on. Pipeline safety enforcement records are not covered here.
- One non-utility holder's share of a pipeline's firm capacity, and the previous design-day standard.
Notes
- UGI Utilities, Inc. - Gas Division, Docket R-2025-3059523, Book II, response to SDR-COS-10, Attachment SDR-COS-10 page 5 of 5 (PDF 22), delivered January 28, 2026; utility filing, system-wide, quantities in Dth. ↩
- Same attachment. 2,340,671 minus 2,280,283 is 60,388 Dth, or 2.65% of requirements; excluding the 30,436 Dth "Supply TBD" line, 29,952 Dth, or 1.31%. Illustrative, our own calculation. The record does not say whether the "Supply TBD" line is contracted. ↩
- Same attachment: UGI Energy Services Peaking Services 479,187 Dth, 21.0% of 2,280,283; third-party capacity for large customers 848,207 Dth, 37.2%; illustrative. The share is a Discovery Energy calculation from UGI Gas's figures: 479,187 ÷ 2,280,283 = 21.0%. ↩
- Attachment SDR-COS-10 page 1 of 5 (PDF 18): peak-day sendout by rate class and temperature by area. ↩
- UGI Gas tariff, Pa. P.U.C. No. 7, Supplement No. 59 (Book X), Description of Territory (PDF 9 to 24): 46 county headings counted by us, 10 in the five metros, 36 outside; Perry County and Warren County, New Jersey, have no heading. County boundaries from OMB Bulletin No. 23-01 (the 2023 delineation file). The metros' counties are Cumberland, Dauphin and Perry (Harrisburg-Carlisle); Lancaster (Lancaster); Berks (Reading); Carbon, Lehigh and Northampton in Pennsylvania and Warren in New Jersey (Allentown-Bethlehem-Easton); and Lackawanna, Luzerne and Wyoming (Scranton--Wilkes-Barre). The tariff lists Cumberland, Dauphin, Lancaster, Berks, Carbon, Lehigh, Northampton, Lackawanna, Luzerne and Wyoming counties and does not list Perry County, Pennsylvania, or Warren County, New Jersey. The tariff also names, in Harrisburg-Carlisle, Camp Hill, Carlisle, Lemoyne and Mechanicsburg; in Lancaster, the boroughs Columbia, Elizabethtown, Ephrata, Lititz, Manheim and Mount Joy; in Reading, the boroughs Birdsboro, Boyertown, Hamburg, Kutztown, Shillington and Wyomissing; in Allentown-Bethlehem-Easton, the boroughs Catasauqua, Emmaus, Macungie, Bangor, Hellertown and Nazareth and the Carbon County boroughs Jim Thorpe, Lehighton and Palmerton; and in Scranton--Wilkes-Barre, Dunmore, Dickson City and the Wyoming County boroughs Factoryville, Laceyville, Meshoppen, Nicholson and Tunkhannock. ↩
- U.S. Census Bureau, Annual Resident Population Estimates for Metropolitan Statistical Areas, Vintage 2025 (July 1, 2025), used to confirm the five metros. Population figures are not shown on this page.
- Joint Petition for Approval of Settlement of All Issues, filed July 6, 2026, paragraph 35 (PDF 14) and Appendix B, Proof of Revenue Summary, page 1 of 7 (PDF 123). Settlement among UGI Gas, the Office of Consumer Advocate, the Office of Small Business Advocate, the Bureau of Investigation and Enforcement and the Retail Energy Supply Association. ↩
- Commission Opinion and Order, adopted and entered October 1, 2026, ordering paragraph 1 (the Commission adopted the Initial Decision of the administrative law judges dated July 31, 2026). ↩
- UGI Gas tariff, Pa. P.U.C. No. 7, Rule 21, Gas Emergency Planning, Supplement No. 59 as filed (Book X PDF 77 to 78). Under Rule 21 a mandated reduction may not go below the minimum usage for plant protection except when Priority 1 service itself cannot be met. ↩
- EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to the 11 Pennsylvania counties of the five metros by us, and the PJM Transition Cycle 1 Phase III project list (Pennsylvania rows; the list has no county column), both our own calculation. ↩
- UGI Utilities, Inc. - Gas Division, Docket R-2025-3059523, Book I, response to I-C-1 part a. (PDF 62), delivered January 28, 2026; utility filing, system-wide. The same sentence also names UGI Sunbury, UGI Mt. Bethel Pipeline, Adelphia Gateway and UGI Storage, which the map does not draw. ↩
- UGI Gas tariff Book X, Description of Territory (PDF 9 to 23), for Carbon, Lehigh, Northampton, Lackawanna, Luzerne and Wyoming counties; Book III (PDF 66) on the October 1, 2020 merger of UGI Central Penn Gas and UGI Penn Natural Gas into UGI Gas; Book VI (PDF 195); Book II (PDF 18 and PDF 31; PDF 31 is the firm transportation contracts list, Attachment SDR-COS-14(a), page 2 of 2). Utility statements. Contracts ending 2028 to 2030: Columbia contracts 79028 (storage) and 79133 (transportation), each 126,473 Dth per day, end March 31, 2030 (Attachment SDR-COS-14(a), page 1 of 2, PDF 30); the two have the same quantity and end date and are counted once. 126,473 divided by 803,922 is 15.7%, where 803,922 Dth per day is our sum of the 56 firm transportation contracts on the same attachment (PDF 30 and 31, the two variable Tennessee contracts at their stated maximums), so it is our figure, not one UGI Gas states; 126,473 divided by 2,280,283 is 5.5% of peak-day requirements (the requirement is in note 2); our calculations. The attachment lists contracts as of November 1, 2025, gives end dates only and shows no replacement. UGI Gas, UGI Penn Natural Gas and UGI Central Penn Gas are separate names; the filings read treat them as one company since 2020, and do not say which supply lines serve which former area. UGI Gas said in its January 2026 filing that UGI Central Penn Gas, Inc. and UGI Penn Natural Gas, Inc. merged into UGI Gas on October 1, 2020; its depreciation study calls the former parts UGI North (the former Penn Natural Gas), UGI Central and UGI South (UGI Gas). ↩
- EIA-860M inventory for September 2026 (Planned and Operating sheets), a Federal Register search of FERC notices since January 1, 2025 and the PJM Transition Cycle 1 Phase III list, by county, our own calculation for Carbon, Lehigh, Northampton, Lackawanna, Luzerne and Wyoming counties; Census Bureau Vintage 2025 population estimates. Warren County, New Jersey, not searched. Existing generation is not new load. EIA's inventory lists generator records that list natural gas (existing generation) in Northampton County, 15 records with 3,439.1 MW of total net summer capacity, and none in Carbon or Lehigh County; Lackawanna County 5 records with 1,425.7 MW; Luzerne County 9 records with 1,315.8 MW; and Wyoming County 8 records with 125.9 MW. The October 2026 search of the Federal Register for FERC notices since January 1, 2025 (see Note 20, Note 23 and Note 24) found notices naming Luzerne, Lancaster and Berks counties. The Federal Register search found no notice naming Cumberland, Dauphin, Perry, Carbon, Lehigh, Northampton, Lackawanna or Wyoming county. EIA's inventory lists no planned gas unit in any of the 11 Pennsylvania counties. ↩
- Fit Energy (project developer), Newport Twp. Data Center project web page (newportdatacenter.com), home page, "We're proposing to put about 1,386 acres of it back to work as a data center campus," accessed October 29, 2026; the Fit Energy press release dated October 6, 2026, posted on the same project web page and accessed October 29, 2026: "following Township zoning approval in August 2026 for both uses." Developer statements, not a filing. The township is in Luzerne County. ↩
- Same project web page, open house boards of October 28, 2026, Power and air board: "Natural gas service supports the fuel-cell facilities"; "Gas routing, metering, pressure control, and delivery facilities are being evaluated"; "Points of interconnection and ownership remain under study." The board gives a projected 160 MW of information-technology load for each current data center building, which is an electric load, not a gas volume, and the page gives no gas volume. ↩
- UGI Gas tariff, Pa. P.U.C. No. 7, Supplement No. 59 (Book X), Description of Territory, Luzerne County, Townships (PDF 17): the list includes "Lehman Nescopeck Newport." The tariff names municipalities and does not say whether every address in a township is served. ↩
- UGI Corporation news release (copies of the Business Wire version and of UGI Corporation's own news page, accessed October 30, 2026), "UGI Energy Services and Prime Data Centers Forge Strategic Partnership to Power Data Center Campus," published May 6, 2026, first paragraphs: "major natural gas supply infrastructure in Pennsylvania's northern tier"; "Prime's natural gas demand is expected to exceed 100,000 dekatherms per day within three to five years." Page 2 of the Business Wire print: "as well as the UGI Utilities distribution network, maintain a presence." Company statement; the release is dated before the 90-day window, names no county and does not use the words "UGI Gas." ↩
- PPL Corporation, Form 8-K Exhibit 99.1 (SEC), second-quarter 2026 earnings release dated August 7, 2026 (copy accessed October 30, 2026), page 3, Pennsylvania paragraph: the data center pipeline "grew to 31.8 gigawatts (GW) in advanced stages of planning in the second quarter," with over 11 GW under signed electric service agreements. Company statement about electric service. ↩
- U.S. Energy Information Administration, EIA-860M, September 2026, Operating sheet, rows 4574 and 4575 (TalenEnergy Martins Creek units 3 and 4, Northampton County, each 850.5 MW, natural gas steam turbine, in service 1975 and 1977, planned retirement June 2035). ↩
- Federal Register 2026-19580 (September 24, 2026), FERC Notice of Application, Docket CP26-576-000: application filed September 4, 2026 for the Leidy Access Expansion Project, "The Project will allow Transco to provide 183,100 dekatherms per day of incremental, firm transportation service," at an estimated cost of $54.7 million; Federal Register 2026-20450 (October 6, 2026), scoping notice, all new facilities in Luzerne County; Williams project page (Transco's parent), timeline "4Q 2027: Target In-Service," paraphrased. The notices name no shipper. ↩
- Pennsylvania Public Utility Commission, docket page for R-2025-3059523, daily actions entry of October 5, 2026: "Supp No 69 to PA PUC No 7 & 7S; Eff: 10/2/26," filed in compliance with the October 1, 2026 Commission order; page accessed October 29, 2026. ↩
- Federal Register 2026-18772 (September 14, 2026), FERC Notice of Schedule for the Environmental Assessment, Docket CP26-527-000, Columbia Gas Transmission, LLC, Majorsville-Heard Storage Complex Abandonment Project: application filed May 21, 2026; the facilities are "no longer required to meet Columbia's current firm service obligations"; environmental assessment due November 30, 2026. UGI Gas lists Columbia Gas Transmission among its nine pipelines (Note 11). ↩
- Federal Register 2025-10389 (June 9, 2025), FERC Notice of Petition, Dockets CP17-101-007 and CP20-49-001, Transcontinental Gas Pipe Line Company, LLC, petition filed May 29, 2025 to "construct the 10.17-mile-long, 42-inch-diameter Quarryville Loop in Lancaster County, Pennsylvania," part of the Northeast Supply Enhancement Project. Outside the 90-day window. ↩
- Federal Register 2025-06613 (April 17, 2025), FERC Notice of Petition for Declaratory Order, Docket CP25-177-000, UGI LNG, Inc., petition filed March 17, 2025 for a "new liquefied natural gas (LNG) storage and trucking terminal at the Temple LNG Plant in Berks County, Pennsylvania." We did not find FERC's order. Outside the 90-day window. The terminal is described as for delivery to local gas distribution systems or end users. ↩
- NOAA Regional Climate Centers, ACIS station data for Middletown Harrisburg International Airport (station USW00014711): heating degree days, base 65 degrees F, November to March, winters 2023-24, 2024-25 and 2025-26 against the 1991-2020 normal of 4178, accessed October 29, 2026. Lancaster uses this station. ↩
- NOAA Regional Climate Centers, ACIS station data for Reading Regional Airport (station USW00014712): heating degree days, base 65 degrees F, November to March, against the 1991-2020 normal of 4202, accessed October 29, 2026. ↩
- NOAA Regional Climate Centers, ACIS station data for Allentown Lehigh Valley International Airport (station USW00014737): heating degree days, base 65 degrees F, November to March, against the 1991-2020 normal of 4314, accessed October 29, 2026. ↩
- NOAA Regional Climate Centers, ACIS station data for Wilkes-Barre/Scranton International Airport (station USW00014777): heating degree days, base 65 degrees F, November to March, against the 1991-2020 normal of 4598, accessed October 29, 2026. ↩
- NOAA Climate Prediction Center, 3-month temperature outlooks issued October 15, 2026 (seasonal outlook shapefiles, read for each metro): November 2026 to January 2027 and December 2026 to February 2027, above-normal favored at 40% (50% for Scranton--Wilkes-Barre, December to February), near normal 33.3% and below normal 26.7% (16.7% for Scranton--Wilkes-Barre, December to February). The 40% is read as the lower edge of NOAA's shaded probability band; NOAA's explanation page is saved. ↩
- National context, not about UGI Gas's system: NOAA's Climate Prediction Center said on October 15, 2026 that the probability of at least a strong El Nino continuing through January to March 2027 is 80%; EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast; EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. Sources A1, A2 and B1 below. ↩
Market and weather sources
Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.
- A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
- A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
- B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
Sources
- Pennsylvania Public Utility Commission, docket R-2025-3059523, UGI Utilities, Inc. - Gas Division base rate case: Book I, filing requirement responses (valuation). Link
- Pennsylvania Public Utility Commission, docket R-2025-3059523, UGI Utilities, Inc. - Gas Division base rate case: Book II, standard data request responses. Link
- Pennsylvania Public Utility Commission, docket R-2025-3059523: Book X, tariff Pa. P.U.C. No. 7, Supplement No. 59. Link
- Pennsylvania Public Utility Commission, docket R-2025-3059523: Joint Petition for Approval of Settlement of All Issues. Link
- Pennsylvania Public Utility Commission, docket R-2025-3059523: Commission Opinion and Order. Link
- Pennsylvania Public Utility Commission, docket R-2025-3059523: Book III and Book VI. Link and Link
- Pennsylvania Public Utility Commission, docket page for R-2025-3059523. Link
- Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
- U.S. Census Bureau, Annual Resident Population Estimates for Metropolitan Statistical Areas, Vintage 2025.
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
- Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
- PJM Interconnection, Transition Cycle 1 Phase III Executive Summary. Link
- Fit Energy (project developer), Newport Twp. Data Center project web site, Newport Twp. Data Center project site (open house boards, October 28, 2026). Link
- UGI Corporation, UGI Energy Services and Prime Data Centers Forge Strategic Partnership to Power Data Center Campus (news release, May 6, 2026). Link
- PPL Corporation, Form 8-K Exhibit 99.1, PPL Corporation Delivers Solid Second-Quarter 2026 Earnings (August 7, 2026). Link
- Federal Register (Federal Energy Regulatory Commission), Transcontinental Gas Pipe Line Company, LLC; Notice of Application and Establishing Intervention Deadline, FR Doc 2026-19580, September 24, 2026. Link
- Federal Register (Federal Energy Regulatory Commission), Transcontinental Gas Pipe Line Company, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Leidy Access Expansion Project, FR Doc 2026-20450, October 6, 2026. Link
- Federal Register (Federal Energy Regulatory Commission), Columbia Gas Transmission, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Majorsville-Heard Storage Complex Abandonment Project, FR Doc 2026-18772, September 14, 2026. Link
- Federal Register (Federal Energy Regulatory Commission), UGI LNG, Inc.; Notice of Petition for Declaratory Order, FR Doc 2025-06613, April 17, 2025. Link
- Federal Register (Federal Energy Regulatory Commission), Transcontinental Gas Pipe Line Company, LLC; Notice of Petition and Establishing Intervention Deadline, FR Doc 2025-10389, June 9, 2025 (Northeast Supply Enhancement Project). Link
- NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00014711. Link
Corrected November 9, 2026: the earlier version said no data center or other new large gas load was found in the five metros. We now report one proposed data center campus that would use natural gas, Fit Energy's in Newport Township, Luzerne County. The earlier version also called peaking services from UGI Energy Services the largest single supply line; the largest line in UGI Gas's own supply subtotal is correct, because the third-party capacity line for large customers (848,207 Dth) is larger. The outlook now says why the proposed Newport Township data center campus is not counted as new load ahead of the fix: it rests on a developer statement with no filing, gas volume or service date. The outlook is now High, not Elevated: expiring supply is now counted, because the Columbia transportation contract ending March 31, 2030 is 15.7% of UGI Gas's firm interstate pipeline capacity by our calculation, above the 10% we treat as key, with no replacement shown, and with concentration that makes two risk factors.