New York natural gas case study, Poughkeepsie-Newburgh area. November 2026

Poughkeepsie-Newburgh gas capacity: three local systems are 95% loaded or more

PA Consulting wrote in January 2025 that Central Hudson's four citygates can flow more gas than a design day needs; the Commission's July 2025 order lists three local systems in the metro at 95% loaded or more in 2024.

113% loadedPoughkeepsie Medium local system, percent loaded in 2024, in the Commission's July 2025 order table
111% loadedTitusville-Pleasant Valley local system, percent loaded in 2024, in the same table
74% load shedPeak-hour load shed Central Hudson says Titusville-Pleasant Valley needs under planning conditions, November 2025
-8 degrees FCentral Hudson's design-day average temperature (73 heating degree days), whole gas system, May 2026

Metro used: the Kiryas Joel-Poughkeepsie-Newburgh, NY metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023): Dutchess and Orange counties, New York.9 Central Hudson Gas & Electric Corporation (Central Hudson) and Orange and Rockland Utilities, Inc. (O&R) serve gas in the two counties.2 The county table also lists New York State Electric & Gas Corporation for Orange County; its record is not covered here, so that part of the metro is a coverage gap and confidence is Medium.9 Most of the record comes from the New York Public Service Commission (the Commission).

Key takeaways

  • Central Hudson told PA its whole system has an existing constraint of at least 30,000 dekatherms (Dth) per day, in the aggregate, at the Tuxedo and Cedar Hill gates.2
  • Central Hudson said in November 2025 that the Poughkeepsie-Newburgh (PN) line recently reached its capacity under planning conditions, and the record shows no completion date for its replacement main.5
  • Titusville-Pleasant Valley supplies a significant portion of the City of Poughkeepsie; Central Hudson says deferring reinforcement needs approximately a 74% load shed at the peak hour.5
  • O&R said in May 2026 that its Kiryas Joel regulator station should be in service in 2026-2027; it named Monroe, Kiryas Joel and Palm Tree as vulnerable in 2020.6

What is the outlook for Poughkeepsie-Newburgh-area gas capacity through 2029?

Discovery Energy rates the outlook for Poughkeepsie-Newburgh-area natural gas capacity through 2029 as High (confidence: Medium): the Commission's July 2025 order table lists two local Central Hudson systems in the metro as loaded above 100% in 2024, Poughkeepsie Medium at 113% and Titusville-Pleasant Valley at 111%, and a third, Highland Mills, at 95%. The records we reviewed show no approved or scheduled reinforcement for these systems. Supply at the citygates covers the design day, and the loading figures are for whole local systems. Documented risk factors: none beyond the loading of the local systems described above. Three developments would change the assessment: Central Hudson's response to the July 2025 order and its May 2027 annual update, which show whether reinforcement of the Poughkeepsie Medium, Titusville-Pleasant Valley and Highland Mills systems enters its capital plan; Commission action on the non-pipe alternative proposals for Titusville-Pleasant Valley and the Poughkeepsie-Newburgh line; any statement of the cause of the Tuxedo Gate constraint, or O&R's Kiryas Joel regulator station entering service.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Poughkeepsie-Newburgh area?

Central Hudson's gas territory covers practically the entire Dutchess County and the northeast region of Orange County.2 O&R's Orange County gas system is separate from its Rockland County system.6 The table sorts the record by place, using the county lists, the USGS Geographic Names Information System (GNIS) for named communities, and the descriptions in the filings.1

Where What this page covers
Dutchess County Central Hudson: Poughkeepsie Medium, Titusville-Pleasant Valley and Poughkeepsie-Newburgh local systems (GNIS locates Poughkeepsie, Titusville and Pleasant Valley in Dutchess County); the Poughkeepsie-Newburgh line runs between Poughkeepsie and Newburgh, and its extent in Orange County is not known
Orange County, northeast part Central Hudson: Highland Mills local system; Tuxedo Gate on the Millennium Pipeline; gas-only districts at Highland Falls and Woodbury
Orange County, O&R system O&R: Monroe, Kiryas Joel and Palm Tree vulnerable locations; Kiryas Joel Reinforcement Project; no Orange County design-day figure
Orange County, other New York State Electric & Gas Corporation listed in the county table: not covered here

Source: filings in the Notes; GNIS.

Central Hudson's gas systems and the Commission record do not allocate system-wide figures by county, so the most local figures are the Commission's table of local system loading and the utility's descriptions of named local systems, each labeled by its geography.2 Where two utilities list the same county, we do not assign places between them unless a record names them.

System context: the Kingston-Saugerties high-pressure system (Ulster County), the Cedar Hill Gate (Albany County), the Mahopac Gate (Somers, Westchester County) and the Carmel gas-only district (Putnam County) are outside the metro, so we do not use their figures here; the Cedar Hill and Mahopac gates matter because they are two of the four citygates that supply Central Hudson's system.3

How much spare gas capacity does the Poughkeepsie-Newburgh area have on the coldest day?

Pipelines supplying the Kiryas Joel-Poughkeepsie-Newburgh area N Tennessee Gas Pipeline Tennessee Gas Pipeline Millennium Pipeline Millennium Pipeline Iroquois Gas Transmission Iroquois Gas Transmission Algonquin Algonquin Columbia Gas Transmission Columbia Gas Transmission Columbia Gas Transmission Columbia Gas Transmission Tennessee Gas Pipeline Tennessee Gas Pipeline Iroquois Gas Transmission Iroquois Gas Transmission Tennessee Gas Pipeline Tennessee Gas Pipeline Algonquin Algonquin Millennium Pipeline Millennium Pipeline Dover Dover Kiryas Joel Kiryas Joel Dutchess County Dutchess County Orange County Orange County New York New York Newark Newark Yonkers Yonkers Paterson Paterson Bridgeport Bridgeport Elizabeth Elizabeth Stamford Stamford Allentown Allentown Hartford Hartford I-84 I-95 I-87 I-90 I-90 I-91 I-91 I-88 I-78 I-80 NY 17 I-495 I-287 CT 8 I-476 NY SSP US-6 I-684 NY 27 US-22 CT 9 NY SBP Berkshire County Berkshire County Delaware County Delaware County Northwest Hills Northwest Hills Otsego County Otsego County Suffolk County Suffolk County Sullivan County Sullivan County Ulster County Ulster County Pipelines supplying the Kiryas Joel-Poughkeepsie-Newburgh area Other gas pipelines Highways Kiryas Joel-Poughkeepsie-Newburgh metro area (2 counties) County lines Cities and towns Compressor station named on this page
Figure 1. Major natural gas pipelines serving Kiryas Joel-Poughkeepsie-Newburgh. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: HIFLD compressor stations (DHS). Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Tennessee Gas Pipeline; Columbia Gas Transmission; Iroquois Gas Transmission; Millennium Pipeline; Algonquin.
  • Compressor stations marked: Dover.
  • Metro counties outlined (2): Dutchess County; Orange County.
  • Cities and towns labeled include: New York; Newark; Yonkers; Paterson; Bridgeport; Elizabeth; Stamford; Allentown.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

System supply. Central Hudson plans its gas system for a design day, the coldest day it must serve, with a daily average temperature of minus 8 degrees F, or 73 heating degree days.4

System context: Central Hudson receives gas through four citygates, its delivery points from the interstate pipelines: Tuxedo on the Millennium Pipeline, Cedar Hill on the Tennessee 200 leg, Pleasant Valley on the Iroquois Pipeline and Mahopac (in Somers, Westchester County) on the Algonquin Pipeline.3 None of its segments is served by a single gate.1

PA Consulting wrote that the four citygates are currently capable of flowing more gas on a design day than is presently required, gave no figure for the margin, and noted that delivered services, in volumes of at least 40 MDth per day in the utility's forecast, can be used to meet marginal demand; Central Hudson told PA that individually there is an existing constraint of at least 30,000 Dth per day, in the aggregate, at the Tuxedo and Cedar Hill gates, and the Tuxedo Gate is in Orange County and the statement does not name a cause.2

Local systems. The Commission's July 2025 order table of hydraulic modeling results, which reflects Central Hudson's modeling, lists the following systems in the metro.1

System Where Percent loaded, 2024 Year exceeding 90% loaded
Poughkeepsie Medium (PM) Dutchess County 113 2023
Titusville-Pleasant Valley (TVPV) Dutchess County 111 2023
Highland Mills (HM) Orange County 95 2023
Poughkeepsie-Newburgh (PN) Dutchess County, Town of Poughkeepsie (the line runs between Poughkeepsie and Newburgh; its extent in Orange County is not known) 77 never

Hydraulic modeling results for highly loaded segments, as printed in the Commission's July 2025 order; whole local systems, percent loaded as the order labels it.

By our count from the table, 3 of the 4 systems are at 95% loaded or more and 2 are above 100%.1 Central Hudson said in November 2025 that the Poughkeepsie-Newburgh line, which serves the Route 9 corridor between Poughkeepsie and Newburgh and whose extent in Orange County is not known, recently reached its capacity under planning conditions, while the order lists it at 77% loaded.5 The order also records PA's finding that the table shows a disconnect between segments that appear to already need reinforcement and the projects in Central Hudson's capital plan, and that less than seven percent of 2018 to 2023 reinforcement investment went to the highly loaded segments.1

What is driving new natural gas demand?

The filings we reviewed name no new large load for Dutchess or Orange County by customer and service date, and EIA's September 2026 generator inventory lists no planned natural gas-fired generator in either county.7 O&R said it will continue to monitor its gas distribution system because of continued load growth in the Kiryas Joel area, without stating a size or date.6 A search of FERC notices in the Federal Register since January 1, 2025 found none naming either county with a pipeline docket number; the only notice of the past 90 days that names Dutchess County concerns a hydropower exemption.10

The New York grid operator's load queue lists an electric load of 16.5 MW for the Iroquois pipeline's Dover compressor in Dutchess County, proposed for November 2028, and does not say whether it adds gas capacity.11

Data centers: As of October 29, 2026, we found no data center gas load in the two counties.12 NYISO's September 30, 2026 load queue lists two data center loads in East Fishkill, Dutchess County, of 1,000 MW and 150 MW of electric load, and the queue rows give no gas information, so we cannot say whether Central Hudson's gas system would serve them.13 The East Fishkill Town Board's minutes of June 25 and July 23, 2026 record that the town has no data center application and had just passed a three-year moratorium on data centers, which concerns zoning and not gas.14

Nearby: Millennium filed negotiated rate agreements on October 22, 2026, and Algonquin filed its September 2026 operational flow order penalty report on September 29, 2026; neither notice names a county or a new gas load.15

Are upgrades arriving in time?

Central Hudson said in May 2026 that hydraulic modeling of the Poughkeepsie-Newburgh system identified constraints indicating the need for increased capacity and improved pressure performance, addressed through its capital pipe replacement program, in which an existing 8-inch steel main was replaced with a 12-inch plastic main; the update gives no completion date or cost.4 In November 2025 it put the estimated capital cost of reinforcing the line along Route 9D with 12-inch main at $373,800 and, for a five-year deferral, a load relief need of 5.6% at the peak hour.5

For the other systems the record shows proposals, not fixes. The Commission's July 2025 order directs Central Hudson to file proposals for non-pipe alternatives, including one in a highly loaded segment, and Central Hudson's November 2025 request for proposals targets the Kingston-Saugerties and Titusville-Pleasant Valley systems, with Poughkeepsie-Newburgh as a third area of interest.5 No approved or scheduled reinforcement, with a date and budget, for the Poughkeepsie Medium, Titusville-Pleasant Valley or Highland Mills systems is in the records we reviewed. In Orange County, O&R's Kiryas Joel regulator station is expected in service in the 2026-2027 timeframe.6

The newest filings on the Commission's lists for Central Hudson's long-term gas plan case and for the O&R plan case are both dated May 15, 2026.16

What does this mean for business gas costs?

Central Hudson's November 2025 estimate for reinforcing the Poughkeepsie-Newburgh line is $373,800, and its estimated deferral value for a five-year deferral is $90,428 in 2025 dollars; the record we reviewed does not state how these costs would be allocated among customer classes.5 In the Titusville-Pleasant Valley load shed area, firm commercial and municipal customers account for approximately 80% of peak daily consumption under planning conditions, which makes business customers the main users of the constrained system.5 This page does not cover the rate case that sets allocation.

Who gets gas first in a shortage?

PA Consulting wrote that approximately 20% of Central Hudson's annual gas volumes are for interruptible customers, who are required to curtail gas use in full when called upon.2 This page does not cover the tariff sequence and any penalties.

Winter and market context

National layer. National storage, export and El Nino figures do not bear on Central Hudson's or O&R's systems and are in a note.17

Regional layer. The metro lies in EIA's East storage region, whose working gas EIA's weekly storage table, released October 22, 2026, lists at 900 billion cubic feet for the week ending October 16, 2026; this page does not give the five-year-average comparison that EIA carries in its weekly report.C1 The nearest regional price EIA publishes is its New York state citygate series, 8.07 dollars per thousand cubic feet for July 2026, the latest month in the series.C2

Tennessee Gas Pipeline, one of the four pipelines whose gates serve Central Hudson, lists pipeline conditions notice 405255 (restrictions for the October 27, 2026 timely cycle, listed on October 26, 2026).C4 Notices from Millennium, Iroquois and Algonquin are not covered here, so their conditions are not shown.

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal in the winters of 2023-24 and 2024-25 and above it in 2025-26 at the Poughkeepsie/Hudson Valley Regional Airport station.18 NOAA's October 15, 2026 outlook gives the Poughkeepsie-Newburgh area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and at least a 50% chance for December 2026 to February 2027.19 The airport is one station, and NOAA's figures are three-month probabilities, not forecasts of specific days.20

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 4158 4748 -12.4%
2024-25 4502 4748 -5.2%
2025-26 5012 4748 +5.6%

Heating degree days at the Poughkeepsie/Hudson Valley Regional Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

Policy context

A New York State Department of Public Service Staff white paper dated February 27, 2025 on the All-Electric Buildings Act (Part RR of Chapter 56 of the Laws of 2023) says the Act's provisions apply to new buildings seven stories or less, with exceptions, effective December 31, 2025, and to all new buildings effective December 31, 2028 (as applied by the Code Council, to building permit applications substantially complete as of December 31, 2025); the Act's current status was not confirmed from an official source for this page.P2

What's new (as of October 29, 2026)

On August 26, 2026 FERC published its environmental assessment of the Constitution Pipeline and Iroquois's Wright Interconnect Project, which is in Schoharie County, and the notice does not mention Central Hudson.21 On August 28, 2026 Stagecoach Pipeline & Storage filed a negotiated rate agreement with Central Hudson, effective September 1, 2026, and the notice does not give its terms.22

What should Poughkeepsie-Newburgh-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff and that riders, demand and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which service. Confirm whether each site takes firm or interruptible service; the record shows interruptible customers are required to curtail in full when called upon.
  • Which utility and local system. Confirm whether the site is served by Central Hudson, O&R or New York State Electric & Gas Corporation, and which local system feeds it, because the loading figures above are by local system and several are in Poughkeepsie.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible and fuel and resupply are in place before December.
  • Upcoming proceedings. Track Central Hudson's annual update in Case 23-G-0676 and the non-pipe alternative proposals for Titusville-Pleasant Valley and the Poughkeepsie-Newburgh line.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Poughkeepsie-Newburgh businesses face natural gas shortages this winter?

The record does not show a shortage, and this page predicts no outages. See 'How much spare gas capacity does the Poughkeepsie-Newburgh area have on the coldest day?'

Is there spare gas capacity in the Poughkeepsie-Newburgh area on the coldest day?

At the citygates, PA Consulting said yes without giving a figure; for local systems, the Commission's order lists several as highly loaded. See 'How much spare gas capacity does the Poughkeepsie-Newburgh area have on the coldest day?'

What is the Poughkeepsie-Newburgh line?

It is a Central Hudson line along the Route 9 corridor between Poughkeepsie and Newburgh that the utility says recently reached its capacity under planning conditions. See 'Are upgrades arriving in time?' for the main replacement it reported in May 2026.

Did the Commission find a gas supply deficiency in the Poughkeepsie-Newburgh area?

The July 2025 order records PA's finding of a disconnect between segments that appear to already need reinforcements and the capital plan; it does not use the word deficient, and the record we reviewed shows no curtailment of firm customers.

Who is cut first if gas service must be curtailed?

PA Consulting wrote that Central Hudson's interruptible customers, about 20% of annual volumes, must curtail in full when called upon. This page does not cover the tariff sequence; see 'Who gets gas first in a shortage?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Supply events since 2020 on Central Hudson's and O&R's systems. The plan, consultant report, order and update we reviewed describe none.
  • How costs are shared among customer classes, and the order in which service would be interrupted.
  • The margin of Central Hudson's supply stack. The consultant's chart shows it without values.
  • O&R's design-day demand and supply for Orange County, and where New York State Electric & Gas's gas territory in Orange County lies.
  • When the Poughkeepsie-Newburgh main replacement will finish, and what it will cost.
  • Whether any new large gas load appears only in state air permits, interconnection queues or federal filings. State Department of Environmental Conservation air permit records, interconnection queue entries and FERC certificate filings are not covered here.

Notes

  1. New York Public Service Commission, Order Regarding Long-Term Natural Gas System Plan and Directing Further Actions, Case 23-G-0676 (issued July 17, 2025), PDF 9, 31 and 106; the hydraulic modeling table is on PDF 31. The order is a Commission record; it summarizes PA Consulting's findings. ↩
  2. PA Consulting, Final Report on Central Hudson's Final Gas System Long-Term Plan, for DPS Staff (January 15, 2025), PDF 22, 23, 36 and 67; Staff analysis. The Company statement about the Tuxedo and Cedar Hill gates is reported in PA's text. The delivered-services volumes of 40 MDth per day are on PDF 46. ↩
  3. Central Hudson Gas & Electric Corporation, Final Gas System Long-Term Plan (November 21, 2024), PDF 23 and 55; the PDF's text extract drops some letter pairs, so quotes are taken from words not affected. Utility statements. ↩
  4. Central Hudson, 2026 GSLTP Update (May 15, 2026), PDF 24, 25, 41 and 64. Utility statements. ↩
  5. Central Hudson, LTP Load Growth NPA Request and NPA Proposal for Highly Loaded Segment (both November 14, 2025); the approximately 74% peak-hour load shed for the Titusville-Pleasant Valley line is on PDF 29 of the load growth request. Utility statements; requests for proposals are not approved fixes. The $373,800 and $90,428 figures and the 5.6% figure are as printed. ↩
  6. Consolidated Edison and Orange and Rockland, Final Gas System Long-Term Plan (November 29, 2023), PDF 31, 35 and 56, and the May 2026 annual update, Case 23-G-0147, PDF 9; the Orange County pages are O&R's. Utility statements. ↩
  7. EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to Dutchess and Orange counties by us, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, both our own calculation. A notice that spells a place differently would be missed. The notice search found one Dutchess County notice (a hydropower filing in Red Hook) and three Central Hudson hydropower notices naming Poughkeepsie as the applicant's address; none is a pipeline notice for the metro. ↩
  8. Locations of named communities from USGS GNIS (Domestic Names, New York), by our own lookup.
  9. The metro is the Kiryas Joel-Poughkeepsie-Newburgh, NY metropolitan statistical area of OMB Bulletin No. 23-01 (July 21, 2023), which lists Dutchess and Orange counties, New York. Serving utilities are taken from the Discovery Energy crosswalk built from EIA-176 county lists and the New York State Department of Public Service table Electric and Gas Utility Service Territory by County (October 2022), which lists New York State Electric & Gas Corporation for Orange County; its record was not reached.
  10. Federal Register search of FERC notices published July 31 to October 29, 2026: one notice names Dutchess County, document 2026-18227 (September 8, 2026, page 57145), Bard College's withdrawal of hydropower exhibit drawings in Red Hook, which is not a gas matter. None names Orange County, New York, Poughkeepsie or Newburgh. One notice, document 2026-18360 (September 9, 2026, page 57329), concerns Golden Triangle Storage's storage site in Jefferson and Orange Counties, Texas. ↩
  11. New York Independent System Operator, Interconnection Queue of September 30, 2026, Load Projects sheet, row 19 (queue number 1522): Iroquois Gas Transmission System, "GTS Dover EMD Compressor," Dutchess County, 16.5 MW, proposed initial backfeed November 2028. A newer queue was not checked. ↩
  12. Evidence for the data center statement: EIA-860M September 2026 (Planned sheet, no planned gas unit in the two counties); the Federal Register search in note 10; the NYISO queue in note 13; East Fishkill Town Board minutes in note 14; and web searches for gas plants or air permits tied to data centers in Orange County, which returned older notices for existing plants and diesel backup generators and no 2026 gas project (news is a lead only and is not claimed). State air permit records, FERC eLibrary filings, and utility special contracts for large loads could not be reviewed. ↩
  13. New York Independent System Operator, Interconnection Queue of September 30, 2026, Load Projects sheet: row 48 (queue number 1738), "1 Gig Data Center East Fishkill, NY," Donovan Drive Holdings LLC, Dutchess County, 1,000 MW peak load, data center end use, proposed initial backfeed October 2028; row 70 (queue number 1760), "iPark 84 Data Center Interconnection," iPark East Fishkill LLC, 150 MW, Central Hudson, backfeed October 2028. A 30 MW DataBank project named "Orangeburg Expansion Phase 2" (queue number 1716, row 31) is shown with the county as Orange and the utility as O&R; Orangeburg is in Rockland County, outside the metro, so we treat that county entry as unconfirmed and do not use it. ↩
  14. Town of East Fishkill, Town Board Meeting Minutes, June 25, 2026, page 3 (public hearing on a moratorium; the Supervisor says the proposal is "Not because there is an application, there is not"), and July 23, 2026, page 15 (the Supervisor says the town is not considering a data center because it has just passed a three-year moratorium). Only the Supervisor's statements are used; residents' remarks in the minutes are not. ↩
  15. Federal Register, FERC Combined Notice of Filings, document 2026-21875 (October 27, 2026, page 67564): Millennium Pipeline Company, LLC, docket RP27-55-000, negotiated rate agreements effective November 1, 2026, filed October 22, 2026; document 2026-20217 (October 2, 2026, page 62725): Algonquin Gas Transmission, LLC, docket RP26-1291-000, "AGT September 2026 OFO Penalty Disbursement Report," filed September 29, 2026; and document 2026-16978 (August 20, 2026, page 53853): Millennium, docket RP26-1060-000, a NAESB 4.0 compliance filing. An operational flow order is a pipeline order to shippers to protect its system; the notices give no figures. ↩
  16. New York State Department of Public Service public document lists read October 29, 2026: Case 23-G-0676 (82 filings; the newest are Central Hudson's 2026 update and its cover letter, filed May 15, 2026, and before them its December 15, 2025 gas demand response proposal) and Case 23-G-0147 (119 filings; the newest is the Con Edison and O&R May 2026 update, filed May 15, 2026). ↩
  17. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. NOAA's Climate Prediction Center said on October 15, 2026 (source B1) that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the Ohio Valley and mid-Atlantic regions, a discussion that names regions and not counties, and that the probability of at least a strong El Nino continuing through January to March 2027 is 80%. EIA's Henry Hub spot price for the week ending October 23, 2026 was 3.28 dollars per million Btu on the first day reported (source C3). These are national facts, not statements about Central Hudson's or O&R's systems. ↩
  18. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Poughkeepsie/Hudson Valley Regional Airport (station USW00014757). Sums are our calculation. Heating degree days behind the percentages: 4158 in 2023-24, 4502 in 2024-25 and 5012 in 2025-26, against a 1991-2020 normal of 4748. ↩
  19. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Poughkeepsie-Newburgh location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for November 2026 to January 2027 the area has at least a 40% chance of above-normal temperatures, about 33% near-normal and no more than 27% below-normal, and for December 2026 to February 2027 at least 50% above-normal, about 33% near-normal and no more than 17% below-normal. ↩
  20. The station is Poughkeepsie/Hudson Valley Regional Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  21. Federal Register, FERC Notice of Availability of the Environmental Assessment for the Proposed Constitution Pipeline and Wright Interconnect Projects, dockets CP13-499-006 and CP13-502-003, document 2026-17399, August 26, 2026, page 55089. Iroquois's Wright Interconnect Project is in Schoharie County, New York, outside the metro; comments were due September 21, 2026. The notice does not mention Central Hudson. ↩
  22. Federal Register, FERC Combined Notice of Filings, document 2026-18036 (September 3, 2026, page 56649): Stagecoach Pipeline & Storage Company LLC, docket RP26-1129-000, "Negotiated Rate Agreement Filing-- Central Hudson Gas & Electric Corporation to be effective 9/1/2026," filed August 28, 2026. The terms are not given. ↩

Market and weather sources

Public web sources, as of October 25 and 26, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
  3. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link
  4. C1. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, release of October 22, 2026. Link ↩
  5. C2. U.S. Energy Information Administration, Natural Gas Citygate Price in New York, monthly. Link ↩
  6. C3. U.S. Energy Information Administration, Henry Hub Natural Gas Spot Price, daily, release of October 21, 2026. Link
  7. C4. Tennessee Gas Pipeline Company, L.L.C., informational postings, critical notices, as posted October 26, 2026. Link ↩

Policy sources

Official sources, as of October 26, 2026. They are context, separate from the regulatory record cited in the Notes.

  1. P2. New York State Department of Public Service, Staff White Paper to Implement the All-Electric Buildings Act, Case 25-M-0149, February 27, 2025. Link ↩

Sources

  1. New York Public Service Commission, Case 23-G-0676, long-term gas system plan of Central Hudson Gas & Electric Corporation. Link
  2. Central Hudson, Gas System Long-Term Plan page. Link
  3. New York Public Service Commission, Case 23-G-0147, long-term gas plans of Consolidated Edison and Orange and Rockland. Link
  4. New York State Department of Public Service, Electric and Gas Utility Service Territory by County (October 2022). Link
  5. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  6. U.S. Geological Survey, Geographic Names Information System, Domestic Names, New York. Link
  7. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  8. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  9. New York Independent System Operator, Interconnection Queue (September 30, 2026), Load Projects sheet. Link
  10. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-18036, published September 3, 2026. Link
  11. Federal Register (FERC), Constitution Pipeline Company, LLC, Iroquois Gas Transmission System, L.P.; Notice of Availability of the Environmental Assessment, document 2026-17399, published August 26, 2026. Link
  12. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-21875, published October 27, 2026. Link
  13. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-20217, published October 2, 2026. Link
  14. Federal Register (FERC), Golden Triangle Storage, LLC; Notice of Application and Establishing Intervention Deadline, document 2026-18360, published September 9, 2026. Link
  15. Federal Register (FERC), Bard College; Notice of Effectiveness of Withdrawal of Exhibit F Drawings, document 2026-18227, September 8, 2026. Link
  16. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00014757. Link

Corrected November 9, 2026: an earlier version placed the Poughkeepsie-Newburgh line in Dutchess County only; the line runs between Poughkeepsie and Newburgh, and its extent in Orange County is not known.