New England natural gas case study, Boston, Massachusetts. November 2026

Boston-area natural gas capacity: station shortfalls and one LNG terminal's contracts

Boston Gas's own hourly analysis shows negative peak-hour balances at stations north of Boston, and the Everett Marine Terminal's contracts end in 2030 with Boston Gas's replacement undecided and the January 2026 agreement not addressing NSTAR Gas's Cambridge need.

About 15%The share of Boston Gas's design-hour needs that can be met by Everett, systemwide (National Grid, July 2023)
At least 14Of 24 Boston Gas take stations inside the metro (37 analyzed), those with projected peak-hour shortfalls each winter
3 of 9Tennessee stations north of Boston, inside the metro, short in all five winters (the three largest are mapped)
2030Year the Everett contracts end for Boston Gas, EGMA and NSTAR Gas

Metro used: the Boston-Cambridge-Newton, MA-NH metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). Items are classified inside, outside or unclear using the town and division names in the registered plans; items outside the metro are shown as system context, not as Boston-metro constraints.14

Key takeaways

  • Of 37 take stations in Boston Gas's Exhibit NG-4, 24 are inside the metro; at least 14 of those show negative peak-hour balances in each winter.9
  • National Grid said in July 2023 that exactly replicating Everett's reliability would need a new LNG plant in the Everett area.1 The DPU records no decision.6
  • For NSTAR Gas's Cambridge division, the DPU found that the January 2026 Algonquin agreement does not address the need for Everett supply on the J-System.8
  • EGMA and NSTAR Gas each balance their design-day tables with a supply line not shown as contracted; it cannot be allocated to metro towns.4
  • System context: the January 2026 approvals on the Algonquin G-Lateral serve Taunton, Attleboro and New Bedford, outside the metro.7
  • The three plans use different design-day standards and only Boston Gas quantifies the design hour, so the figures are not a ranking of the utilities.11
  • The outlook rests on Boston Gas's own hourly analysis of take stations inside the metro, on which the DPU made no finding.9

What is the outlook for Boston gas capacity through 2029?

Discovery Energy rates the outlook for Boston-area natural gas capacity through 2029 as High (confidence: Medium): Boston Gas's own hourly analysis shows that at least 14 of the 24 take stations we classify inside the metro (37 are analyzed in all) have a negative balance at the peak hour in each winter from 2024/25 to 2028/29.9 The Department of Public Utilities (DPU) made no finding on these shortfalls.10 Documented risk factors: concentration, meaning heavy reliance on one supply point, from Everett's share of Boston Gas's design-hour requirements, described in 'How much does the Boston metro depend on the Everett LNG terminal?' (National Grid's July 2023 statement does not say which divisions it covers; we read it as its whole Massachusetts system, not the metro alone).1 A more likely design day is also documented: Boston Gas now plans for a 1-in-40.3-year design day, down from 1-in-47.9 in its previous plan.11

Expiring supply is not documented as a risk for the Everett agreement. The plan states no firm interstate pipeline capacity total to compare it with, and the agreement is 5.35% of the 2028/29 design peak day by our calculation, so we did not count it as a risk. Three developments would change the assessment: National Grid's next plan, due November 2026, and what it says about replacing Everett supply after 2030; whether Burlington, Arlington and Revere remain in shortfall in Boston Gas's next hourly analysis; any DPU action on alternatives for NSTAR Gas's J-System need in Cambridge, and the DPU's decision on NSTAR Gas's later plan (docket D.P.U. 26-94).

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Boston area?

Three gas utilities appear in the plans reviewed: Boston Gas (National Grid), Eversource Gas Company of Massachusetts (EGMA) and NSTAR Gas. Boston Gas's Boston, Essex and Lowell divisions and NSTAR Gas's Cambridge division are inside the metro (a few Boston Gas stations in Worcester County are outside), and the table sorts each item by the town or division its plan names. Every figure on this page describes a whole utility system or a named station, so a company-wide number does not describe each town in the metro. Items outside the metro still matter to a facility inside it, because all three utilities hold Everett contracts that end in 2030.

Boston-area gas supply: pipelines, LNG and the stations in this report I-90 I-95 I-95 I-93 I-93 I-495 I-495 Boston Boston Cambridge Cambridge Lowell Lowell Lawrence Lawrence Haverhill Haverhill Worcester Worcester Brockton Brockton Taunton Taunton Attleboro Attleboro New Bedford New Bedford Mendon Mendon Weymouth Weymouth Beverly Beverly Dracut Dracut Burlington Burlington Arlington Arlington Revere Revere Everett Marine Terminal Everett Marine Terminal (LNG import) (LNG import) Tewksbury LNG Tewksbury LNG Tennessee Gas Pipeline Tennessee Gas Pipeline to New Hampshire to New Hampshire Algonquin Algonquin Algonquin J-System Algonquin J-System Algonquin G-Lateral Algonquin G-Lateral HubLine (offshore) HubLine (offshore) Maritimes & Northeast Maritimes & Northeast Boston metro (approx.) Boston metro (approx.) Outside the metro: Worcester, Outside the metro: Worcester, Bristol and Hampden counties Bristol and Hampden counties N Tennessee Gas Pipeline (and laterals north of Boston) Algonquin Gas Transmission Algonquin G-Lateral (outside the metro) HubLine (offshore) Maritimes & Northeast Take station with a peak-hour shortfall (NG-4) LNG facility Boston-Cambridge-Newton metro (approx.) Interstate highway (for orientation) Take station with a negative peak-hour balancein Boston Gas's analysis
Figure 1. Boston-area gas supply: pipelines, LNG and the stations in this report. Simplified schematic; pipeline routes approximate. Discovery Energy illustration based on the Boston Gas Portfolio Schematic (D.P.U. 24-164, Appendix B) and the NSTAR Gas take-station map (D.P.U. 24-106, Appendix 2). Coastline and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines shown: Tennessee Gas Pipeline (and laterals north of Boston); Algonquin Gas Transmission; Algonquin G-Lateral (outside the metro); HubLine (offshore); Maritimes & Northeast.
  • LNG facilities labeled: Everett Marine Terminal (LNG import); Tewksbury LNG.
  • Cities and towns labeled: Boston; Cambridge; Lowell; Lawrence; Haverhill; Worcester; Brockton; Taunton; Attleboro; New Bedford; Mendon; Weymouth; Beverly; Dracut; Burlington; Arlington; Revere.
  • Take stations ringed (a negative peak-hour balance in Boston Gas's own analysis): Burlington; Arlington; Revere.
Item Place named in the plans Classification Basis
Boston Gas stations Burlington, Arlington, Revere (NG-4) Burlington and Arlington (Middlesex), Revere (Suffolk) Inside Town in county list
Boston Gas NG-4 shortfall stations in named towns, including those three Towns such as Medford, Lynn, Wellesley, Acton, Tewksbury Inside (24 stations; at least 14 with a shortfall each winter) Town in county list
Boston Gas stations Polaroid, Trapelo Rd, Maple St, Camp Curtis Plan names a facility or street, not a town Unclear (up to 4 stations with a shortfall; some may be inside) No town in the registered plan
Boston Gas stations Southbridge, Leominster, Lunenburg Worcester County Outside (up to 3 stations with a shortfall) Town not in county list
Boston Gas Everett reliance Boston, Essex and Lowell divisions; Everett (Middlesex) Inside; the 2023 statement does not say which divisions it covers, and we read it as the company's whole Massachusetts system Division and town
NSTAR Gas J-System, Cambridge division Cambridge (Middlesex) Inside Division in county list
NSTAR Gas G-System contract (5,000 Dth/day) to the Plymouth citygate Plymouth (Plymouth County); no saved document places the citygate Inside, following Discovery Energy's own assessment Plymouth County is in the county list
NSTAR Gas G-Lateral to New Bedford; Worcester stations New Bedford (Bristol), Worcester Outside, system context Not in county list
EGMA Algonquin G-Lateral deliveries Taunton and Attleboro (Bristol) Outside, system context Not in county list
EGMA Springfield Springfield (Hampden) Outside, system context Not in county list
Gap lines (EGMA, NSTAR Gas) and Boston Gas resource tables Company-wide; divisions span inside and outside Mixed; not allocable, system context Plans give no division-level resource table

Town-to-county assignments were made manually and checked against the OMB county list (OMB Bulletin No. 23-01).14

Where does Boston Gas's hourly analysis show station-level shortfalls?

Boston Gas, doing business as National Grid, filed its plan in November 2024 (docket D.P.U. 24-164). It covers the Boston, Essex, Lowell and Cape Cod divisions; the first three are mainly inside the metro, with a few Worcester County stations beyond it. Its design hour is five percent of the design day (the coldest day the utility plans for), and Exhibit NG-4 models each of 37 pipeline take stations in those three divisions (24 classified inside the metro, 7 unclear and 6 beyond it) for winters 2024/25 to 2028/29, with portable LNG and the Tewksbury vaporization upgrade (winter 2027/28) included. Exhibit NG-4 labels a negative balance a "Shortfall."9

Close-up: Boston north, the Tennessee stations and Everett I-93 I-95 / 128 I-90 Boston Boston Cambridge Cambridge Somerville Somerville Medford Medford Woburn Woburn Lynn Lynn Burlington Burlington Arlington Arlington Revere Revere Everett Marine Terminal Everett Marine Terminal (LNG import) (LNG import) Tennessee laterals Tennessee laterals Algonquin J-System Algonquin J-System N Take station with a negative peak-hourbalance in Boston Gas's analysis
Figure 2. Burlington, Arlington and Revere show negative peak-hour balances in every winter (Exhibit NG-4). Everett connects to the distribution system, not the pipelines. The J-System ends near Cambridge; the record doesn't show how NSTAR Gas's J-System Everett need is met after 2030.

In words: what the map shows

  • Pipelines labeled: Tennessee laterals; Algonquin J-System.
  • LNG facilities labeled: Everett Marine Terminal (LNG import).
  • Cities and towns labeled: Boston; Cambridge; Somerville; Medford; Woburn; Lynn; Burlington; Arlington; Revere; Take station with a negative peak-hour; balance in Boston Gas's analysis.
  • Take stations ringed (a negative peak-hour balance in Boston Gas's own analysis): Burlington; Arlington; Revere.

Circled stations (Burlington, Arlington and Revere) are the take stations placed on these maps that show a negative peak-hour balance in every winter from 2024/25 to 2028/29 in Boston Gas's own analysis; the other stations with negative balances are not placed on these maps.9

By that label, 22 of the 37 stations show a shortfall by 2028/29. By metro classification, at least 14 of the 24 inside stations show a shortfall in each winter (14 or 15 depending on the winter; 13 show one in all five), up to 4 more have a plan label that gives no town and so are not located, and up to 3 are in Worcester County towns.914 Nine Tennessee Gas Pipeline (lateral 3) stations north of Boston, all inside the metro, show a shortfall in all five winters; the three largest in 2028/29, Burlington, Arlington and Revere, are the ones on the maps:

Station (NG-4) 2024/25 2026/27 2028/29
Burlington -1,240 -1,234 -1,265
Arlington -945 -950 -968
Revere -885 -928 -968

Total Firm Peak Hour Balance in Dth/hr, Exhibit NG-4. Station-level model results; stations on different pipelines are not netted against each other.9

The plan says peak-hour requirements can be served over the five-year period with portable LNG and the Tewksbury increase, and that hourly deficits can arise behind take stations without a daily deficit. It also reports an aggregate forecasted design-hour surplus for the Boston, Essex and Lowell territories that decreases through winter 2028/29. NG-4 shows no station-level relief for these three stations. The DPU order, dated October 30, 2025, records the design-hour requirement but makes no finding on the analysis or on any station.10 The workbook is the latest Boston Gas hourly analysis in the record; the plan due November 1, 2026 is not.32

Close-up: Merrimack Valley, Tewksbury LNG and Dracut I-93 I-495 Lowell Lowell Lawrence Lawrence Haverhill Haverhill Dracut Dracut Andover Andover Tewksbury LNG Tewksbury LNG Tennessee Gas Pipeline Tennessee Gas Pipeline Maritimes & Northeast Maritimes & Northeast to New Hampshire to New Hampshire N
Figure 3. Tewksbury LNG vaporization rises for winter 2027/28, ending the Tewksbury station's shortfall. Lawrence reached 99% of design day on February 3, 2023. Maritimes & Northeast meets the Tennessee system at Dracut.

In words: what the map shows

  • Pipelines labeled: Tennessee Gas Pipeline; Maritimes & Northeast.
  • LNG facilities labeled: Tewksbury LNG.
  • Cities and towns labeled: Lowell; Lawrence; Haverhill; Dracut; Andover.

How much does the Boston metro depend on the Everett LNG terminal?

The Everett Marine Terminal (EMT), supplied under contracts with Constellation LNG, sits in Everett (Middlesex County). National Grid said in July 2023 that the terminal has a direct connection with National Grid's distribution system, and the Boston Gas plan describes vaporized LNG delivered directly into the distribution system in Everett.13 In 2024 the DPU approved six-year EMT contracts for Boston Gas, EGMA and NSTAR Gas, among others. EGMA's and NSTAR Gas's run through May 31, 2030; Boston Gas's last contract winter ends March 31, 2030.13

Boston Gas. In a July 2023 response to the DPU, National Grid said that Everett can meet about 15% of total design-hour requirements at design-day conditions (the response does not say which divisions this covers; we read it as Boston Gas's whole Massachusetts system, not the metro alone), supports pressure on pipeline ends that feed about half of its Massachusetts take stations, and is used for design-hour, design-day and design-season needs. National Grid also said that additional vaporization and portable LNG generally do not help areas fed from Everett, and that exactly replicating the reliability Everett provides would need a new LNG plant in the Everett area. These are utility statements, not DPU findings.1

The DPU's October 30, 2025 order records that the company is evaluating ways to reduce or eliminate reliance on incremental EMT supply after the contract expires and must report in its next plan, due November 2026 and not in the record. No replacement is decided.6

The state's working group. A state working group on the Everett Marine Terminal, reporting to the Energy Transformation Advisory Board on June 11, 2026, found that no feasible combination of demand reduction, pipeline reconfiguration or distributed storage has been identified that would let the utilities serving Greater Boston operate reliably without the terminal in 2030.31 This is a working-group finding, not a DPU finding, and it decides no contract.

NSTAR Gas, Cambridge division. NSTAR Gas's EMT contract with Constellation LNG totals 15,000 Dth/day: 5,000 Dth/day on the Algonquin G-System (which the plan sends to New Bedford and Plymouth citygates), and 10,000 Dth/day to Mystic on the J-System, which serves Cambridge, or into the Tennessee system at Everett. In January 2026 the DPU approved a 5,000 Dth/day pipeline agreement that covers all of NSTAR Gas's existing G-Lateral need.8 Plymouth County is one of the metro's counties. No saved document places the Plymouth citygate, so we count the 5,000 Dth/day G-System contract to that citygate as inside the metro, following Discovery Energy's own assessment. The record we reviewed does not show how Plymouth is covered after that approval, which names New Bedford only.

The DPU found that the agreement does not address NSTAR Gas's need for the EMT resource on the J-System in Cambridge, and expects NSTAR Gas to investigate all possible alternatives. The record does not show how that need is met after the current contract ends on May 31, 2030. The plan states the 10,000 Dth/day J-System volume as part of the contract; it does not state a Cambridge design-day gas volume (its Cambridge design day is a weather standard of 81 effective degree days), so no share is computed.8

NSTAR Gas's later plan, D.P.U. 26-94, describes the same 15,000 Dth/day contract, running through May 31, 2030, and says the company has not yet determined its next course of action on Constellation LNG contracts while it works with the state's Office of Energy Transformation.33

What is driving new natural gas demand in the Boston area?

The official records searched show no new large gas load in the metro, and no data center or generator with a filing-confirmed service date was found. EIA's September 2026 generator inventory lists no planned natural gas-fired generators in Middlesex, Essex, Suffolk, Norfolk or Plymouth County, Massachusetts, or in Rockingham or Strafford County, New Hampshire.16 Our Federal Register search since January 1, 2025 found two FERC notices that name one of those seven counties. One is Distrigas of Massachusetts' April 2025 application to add a redundant boil-off gas compressor at its existing Everett LNG terminal in Middlesex County, which names no utility and no new gas load.27 The other, on Algonquin's regional pipeline project, names Norfolk County and is described below.21

EIA's inventory does list gas-fired generators retired since January 2024, including six units at the Mystic Generating Station in Middlesex County (June 2024), two at Potter Station 2 in Braintree, Norfolk County (January 2024) and a 21.3 MW turbine at Waters River in Peabody, Essex County (June 2026); they are electric generators, and the sources do not tie them to a gas utility's supply.20

Data centers: As of October 29, 2026, we found no data center gas load, gas-fired plant or fuel cell serving a data center in the seven counties. The one data center filing we found, in Lowell, covers diesel generators, so it is an electric project and not a gas load.16

Regional pipeline projects with facilities inside the metro: In June 2026 FERC opened scoping for Algonquin's planned Reliable Affordable Resilient Enhancement Project, a regional pipeline replacement with facilities in Norfolk County, inside the metro, and in Worcester County, which is not part of the metro.21 The notice says where the facilities would be, not which customers they would serve, and names no customer or load. In 2020 the pipeline safety agency, PHMSA, ordered corrective action at Algonquin's Weymouth Compressor Station in Norfolk County, inside the metro, after events on September 11 and 30, and closed the order on November 17, 2021 after Algonquin completed the temporary removal of the pressure restriction.22

What is system context outside the metro?

Gap lines at EGMA and NSTAR Gas

Both plans balance their design-day tables because a supply line is counted as a resource, and in neither record is the line shown as contracted. The lines are company-wide, include divisions inside and outside the metro, and cannot be allocated to metro towns.

EGMA (Brockton, Lawrence, Springfield divisions; 2023 plan). The base-case design-day requirement reaches 538.4 BBtu by 2027/28. "Other Supplies" fills the difference: 21.2 BBtu by 2027/28, which is 3.9% of the design day (illustrative). The plan text describes it as a modest resource deficiency to be served by peaking and spot supply, although an earlier page says the portfolio is sufficient without incremental resources. The DPU found supplies adequate because the company can reasonably be expected to secure incremental supplies; the January 2026 joint order describes an existing design-year deficiency through 2027/28.24 EGMA's next plan, due in November 2025, is not in the record we reviewed.

NSTAR Gas (Worcester, Framingham, Cambridge, New Bedford divisions; 2024 plan). The base-case design-day requirement reaches 568.1 BBtu by 2028/29. "Winter Service Supplies" (labelled "Citygate Supplies" in Table G-23) fill the gap: 46.8 BBtu by 2028/29, or 8.2% of the design day, and 12.7% in the high-growth case. The plan says directly that the company has a deficiency in all five years, mostly on the Tennessee system.3 The DPU again found supplies adequate on the expectation that incremental supplies can be secured.4

NSTAR Gas, 2026 plan (D.P.U. 26-94, for November 1, 2026 to October 31, 2031). The Department's August 10, 2026 notice says the petition was filed October 30, 2025; the plan's cover is dated July 17, 2026.30 Its base-case design-day requirement is 546.3 BBtu in 2028/29, with 16.0 BBtu of "Needed Supplies," or 2.9%, rising to 39.3 BBtu, or 7.1%, in 2030/31 as the Constellation LNG contract ends.33 That is a smaller line than the 2024 plan's 8.2% for 2028/29, though the two tables are not like for like.3 The plan again states a design-year deficiency in all five years.33 No DPU order on this plan is in the record we hold.

Boston Gas. Its resource tables carry no such line: across the twelve design-year and design-day pages (base, high and low cases) the resources are named pipeline, storage and LNG lines, unserved load is zero and the one unlabelled row is zero throughout.5

A gap line is a modeling choice, not a failure; a utility can plan to buy supply on the day or season. Zero unserved load in the models says the gap was assumed purchased, not that it was bought.4

Algonquin G-Lateral approvals

In January 2026 the DPU approved firm transportation agreements on the Algonquin G-Lateral. EGMA's 25,000 Dth/day agreement from November 1, 2029 serves its South Attleboro and Taunton interconnections and covers 74% of a stated 34,000 Dth/day need; the DPU found it removes the need to extend EGMA's EMT contract beyond 2030. The remaining 9,000 Dth/day is described in the order, citing EGMA's testimony, only as "seasonal supplemental supply"; the order names no supplier or contract, so how it is covered is not shown. NSTAR Gas's 5,000 Dth/day agreement serves New Bedford. These approvals are outside the metro.7 They do not bear on the Cambridge or Boston Gas items above.8

Close-up: south of the metro, the Algonquin G-Lateral I-95 I-495 Mendon Mendon Attleboro Attleboro Taunton Taunton New Bedford New Bedford Brockton Brockton Franklin Franklin Algonquin G-Lateral Algonquin G-Lateral Algonquin Algonquin Boston metro (approx.) Boston metro (approx.) Outside the metro Outside the metro N
Figure 4. The G-Lateral serves Attleboro, Taunton and New Bedford, outside the Boston metro. The January 2026 DPU order approved new Algonquin capacity on it for EGMA (25,000 Dth/day) and NSTAR Gas (5,000 Dth/day).

In words: what the map shows

  • Pipelines labeled: Algonquin G-Lateral; Algonquin.
  • Cities and towns labeled: Mendon; Attleboro; Taunton; New Bedford; Brockton; Franklin.

Winter and market context

NOAA's Climate Prediction Center issued its long-lead seasonal outlook on October 15, 2026, a national discussion that names regions and not utility systems.A1 The national inventory figures from EIA do not bear on National Grid's or Eversource's systems, and none sets the outlook on this page, so they sit in a note.28

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, were 9.7% below the 1991-2020 normal at the Boston Logan International Airport station in winter 2023-24, 4.6% below in 2024-25 and 3.9% above in 2025-26.24 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the Boston area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and at least 50% for December 2026 to February 2027.25 The airport is one station standing in for the metro, and NOAA's figures are probabilities for a three-month average, not a forecast of specific days.26

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 3935 4360 -9.7%
2024-25 4160 4360 -4.6%
2025-26 4530 4360 +3.9%

Heating degree days at the Boston Logan International Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

How do global LNG markets reach Boston?

The Everett Marine Terminal is an LNG import terminal, so Boston-area winter supply is tied to the world LNG market in a way most U.S. metros are not. EIA's monthly import data show 2,165 million cubic feet of LNG from Trinidad and Tobago entering at Everett in February 2026 and none from that country from March to July.A6

In its September 2025 petition to the DPU, EGMA said the number of LNG cargoes received in New England has declined significantly over the last decade, in part because LNG providers receive better pricing elsewhere in the world.18 ISO New England reports that LNG sendout into New England in winter 2026 was about 45.9 million MMBtu, against 22.4 million the winter before, driven primarily by higher volumes from Everett and St. John.B2

What changed in 2026. ACER, the EU's agency for energy regulators, says the closure of the Strait of Hormuz is affecting global and European energy and LNG markets.A5 CNBC reported on July 1, 2026 that Iranian missile attacks in March damaged two LNG trains at Qatar's Ras Laffan complex, curtailing production by 12.8 million tons a year, about 17% of Qatar's LNG exports.A12

The International Energy Agency's supply-loss estimate, Europe's competing demand and Russian LNG rules, European and U.S. storage levels and benchmark prices are in a note.29

Why this matters for Boston. In Discovery Energy's reading of the market, not a statement from these sources, LNG cargoes tend to go to the highest-priced market, so Everett competes with Europe and Asia for Atlantic cargoes during New England's coldest weeks. ISO New England found that New England gas pipelines were significantly constrained throughout winter 2026, that the region relied on LNG sendout during gas-scarce, high-priced periods, and that LNG only partially reduced the New England price premium.B2 None of the sources says that Everett's contracted supply for Boston Gas or NSTAR Gas is short this winter (note 19).

The DPU record reviewed for this page contains no LNG price data, and none of this section changes the regulatory findings above.

What does the weather outlook say for this winter?

A very strong El Niño. NOAA's Climate Prediction Center said on October 8, 2026 that a strong-to-very-strong El Niño is likely through January-March 2027 (a chance greater than 83%), and put the chance that October-December exceeds the strength of every El Niño on record back to 1950 at 83%.B1

The seasonal outlook favors a warmer East. The Climate Prediction Center's November 2026 to January 2027 outlook, issued October 15, favors above-normal seasonal mean temperatures across the northern tier and much of the East, includes the Great Lakes and interior Northeast among the areas with the highest odds, and gives an elevated likelihood of above-normal precipitation along the eastern seaboard.A1

Milder on average is not the same as no cold snaps. The outlook gives odds for seasonal averages, not for individual cold days, and the gas system's stress comes from short, severe cold. Last winter shows the range: ISO New England reported a 19-day cold snap from January 23 to February 10, 2026, the longest since winter 2015.B2

Last winter for comparison. EIA reported that Lower 48 working gas stocks fell 360 Bcf in the week ending January 30, 2026, the largest weekly net withdrawal in the history of its storage report.B3 ISO New England reported winter 2026 wholesale market costs of $6.5 billion, up 45% from the year before.B2

Next updates. The Climate Prediction Center's next ENSO discussion is scheduled for November 12, 2026.B1 Its official 90-day outlooks are issued once each month near mid-month.A1

What could stress Boston's gas supply this winter?

This is Discovery Energy's qualitative assessment, based on the historical record and the conditions described above. It is not a statistical model and not a forecast.

What past crises looked like. Boston's recent winter emergencies have shown up as extreme prices and electric-grid stress:

  • Winter 2026 overall. ISO New England reports the highest wholesale prices of any winter since 2014.B2
  • January 2026 (Winter Storm Fern). Algonquin prices reached approximately $122/MMBtu on January 27, and ISO New England describes the New England gas price as a record high.B2 The U.S. Department of Energy issued an emergency order for ISO New England in effect from January 25 through January 31, 2026.C1 Oil supplied 6% of New England's electricity supply mix in winter 2026, up from 2% the winter before, and oil generation exceeded gas generation on several days of the cold snap.B2

The ISO New England report and the DOE release reviewed for this section describe prices, oil burn and grid emergency measures. We read both and found no report of a loss of firm gas distribution service to Boston-area customers in the ISO New England report.B2 The DOE release reports none either.C1

In Discovery Energy's client experience, firm customers kept service through these events; interruptible customers were curtailed, as their service terms allow.

Conditions that could stress supply, winter 2026-27, with Discovery Energy's qualitative assessment of each (not a forecast).

Condition Assessment Why
Sharp price spikes at Algonquin during cold snaps Likely if any significant cold stretch occurs Algonquin reached about $122/MMBtu on January 27, 2026, and winter 2026 had the highest wholesale prices since 2014.B2
Higher cost or tighter availability of Everett LNG cargoes Elevated The Strait of Hormuz closure and the loss of about 17% of Qatar's LNG exports tighten global supply,A5A12 EU storage is below its five-year average,A10 and Russian LNG under long-term contracts is prohibited in the EU from January 1, 2027.A4
Electric-grid emergency in New England Possible A precedent exists from January 2026,C1 but the Climate Prediction Center favors above-normal temperatures for much of the East this winter.A1
Loss of firm gas service to commercial and industrial customers Low The utilities plan to design-day standards and model zero unserved load, and the DPU found supplies adequate. The record's station-level shortfalls (Boston Gas) and gap lines not shown as contracted (EGMA, NSTAR Gas) mean the risk is not zero. Interruptible customers face curtailment first, by the terms of their service.

The outlook rating later on this page and the assessment in this table measure different things: the rating describes how much strain the public record shows in capacity, and this table assesses how likely firm customers are to lose service this winter.

What would raise the odds: deep cold in January or February coinciding with the January 1 EU ban on Russian LNG; renewed escalation in the Strait of Hormuz or further damage to Qatari capacity; delays to Everett cargoes; a major pipeline outage; or low regional fuel-oil inventories, as at the start of last winter.B2

What would lower them: the above-normal temperatures the Climate Prediction Center favors.A1 Resumption of LNG cargoes through the strait, which the IEA says otherwise removes around 10 billion cubic metres of supply a month, would also lower them.A11 Faster refilling of European storage would help too.A8

How rare is design-day weather?

The utilities' own plans state the odds they plan for. Boston Gas plans for design-day weather at a 1-in-40.3-year frequency, EGMA at 1-in-33 and NSTAR Gas at 1-in-50.11 Design-day weather has about a 2.5% chance in a given winter (Boston Gas's 1-in-40 standard; EGMA's and NSTAR Gas's standards are similar), based on historical weather. That is the chance of reaching the planned limit, not of losing service. On February 3, 2023, conditions exceeded EGMA's Springfield design day and reached 99% of design at Lawrence and 95% at Cambridge.15

Why aren't these three plans directly comparable?

  • Different design-day standards. Boston Gas plans for 78 equivalent degree days at a 1-in-40.3-year frequency. EGMA uses a 1-in-33-year design day (78 equivalent degree days in Brockton and Springfield, 80 in Lawrence). NSTAR Gas uses a 1-in-50-year design day (88, 81 and 79 equivalent degree days by division). A stricter standard raises the requirement a plan must cover.11
  • Only Boston Gas quantifies the design hour. EGMA's plan has no design-hour requirement or take-station balance. NSTAR Gas's plan describes a design-hour criterion with no value and no results.11 Its 2026 plan does the same.33
  • Different years and denominators. The plans cover different forecast periods, and each percentage on this page is a volume divided by that company's own design day for the same winter.12 They should not be added or ranked.11

What does this mean for business gas costs?

The record contains no customer-class cost allocation, rate or bill figure for any of these supply decisions, so none is given here. Replacements for the Everett contracts after 2030 and any change to the stations above would have to be contracted and approved in later DPU proceedings, and who bears their cost is not decided in these orders. Hourly limits at take stations matter most on the coldest days. Facilities served from the Boston Gas stations north of Boston are the most directly connected to the inside-metro items above.9 Facilities on NSTAR Gas's Cambridge system are connected through the J-System need.8

What's new (as of October 29, 2026)

On September 29, 2026 Algonquin Gas Transmission filed its September 2026 report on penalties from operational flow orders, which are orders a pipeline issues to protect system pressure; the notice, in the October 2026 Federal Register, gives no amounts.23 As of the June 9, 2026 scoping notice, the latest record we reviewed, Algonquin's planned Reliable Affordable Resilient Enhancement Project was in FERC pre-filing review with no application filed.21

What should Boston-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which utility, division and station. Confirm the serving utility and division for each site, and whether it is fed from a Tennessee lateral north of Boston or the Algonquin J-System.
  • Firm or interruptible, and the terms. Know whether each account is firm or interruptible. For interruptible or non-firm accounts, confirm notice periods, curtailment order and penalties before the first cold snap.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible. Where dual-fuel equipment exists, check fuel inventories and resupply arrangements before December.
  • Upcoming proceedings. Track the 2026 plan filings and any Everett replacement proceedings.
  • Index price exposure in January and February. Know which accounts are priced at Algonquin or another daily index during peak months, and what a repeat of last January's prices would cost.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Is the Boston area short of natural gas?

No shortfall in delivered service is established. In the plans' models, unserved load is zero for all three utilities. Inside the metro, Boston Gas's own hourly analysis shows negative peak-hour balances at a number of take stations, and the DPU made no finding on them. See 'Where does Boston Gas's hourly analysis show station-level shortfalls?'

How much does Boston Gas rely on the Everett terminal?

In July 2023 National Grid stated that Everett can meet about 15% of its total design-hour requirements; it does not say which divisions, so we read it as the whole Massachusetts system, not the metro alone. This is a utility statement, not a DPU finding; the contract ends in 2030.

What has been decided about replacing Everett?

For Boston Gas, nothing: the DPU recorded that the company is evaluating alternatives. For NSTAR Gas's Cambridge division, the DPU found a January 2026 pipeline agreement does not address the Everett need on the J-System; the record does not show how it is met after 2030. See 'How much does the Boston metro depend on the Everett LNG terminal?'

What is a "citygate supplies" line?

A resource line in a supply plan for gas bought at the point where the utility takes delivery from the interstate pipeline. In EGMA's and NSTAR Gas's tables it fills the gap between requirements and named resources. It is not shown as contracted and is company-wide. See 'Gap lines at EGMA and NSTAR Gas.'

Do the plans say what this costs customers?

Not in the record reviewed. No bill or cost-allocation figure is included here. See 'What does this mean for business gas costs?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Whether any gas-fired project is waiting in ISO New England's interconnection queue. The public queue is an interactive table, and we can't say what it holds.
  • State air permit filings for new gas equipment, especially in New Hampshire. We found no gas turbine application in Massachusetts and can't say for New Hampshire.

Notes

  1. National Grid (Boston Gas), response to DPU Everett inquiry, July 2023, PDF 8, PDF 2, PDF 4, PDF 9. The 15% is National Grid's July 2023 statement; the response says Everett "can meet approximately fifteen-percent of total design hour requirements" (PDF 8) and does not say which divisions that covers, so we read it as Boston Gas's whole Massachusetts system, not the metro alone; it is not recomputed and it is not a DPU finding. ↩
  2. EGMA plan, D.P.U. 23-125: Table I-4 PDF 99 (printed page 97); Table G-23 PDF 126. Shares are each year's line divided by that year's design day; illustrative. ↩
  3. NSTAR Gas plan, D.P.U. 24-106: Figure 47 PDF 104 (printed page 97); Table G-23 PDF 131; high growth Figure 49 PDF 106. Shares are each year's line divided by that year's design day; illustrative. ↩
  4. EGMA text: plan, D.P.U. 23-125 PDF 100 (printed page 98), PDF 96 (printed page 94); DPU order D.P.U. 23-125 PDF 32 (printed page 30); joint order D.P.U. 25-133/25-134 PDF 24 (printed page 21). NSTAR Gas text: plan, D.P.U. 24-106 PDF 9 (printed page 2), PDF 103 (printed page 96); DPU order D.P.U. 24-106 PDF 35 (printed page 33); joint order D.P.U. 25-133/25-134 PDF 24. Contract status of the gap lines: not shown as contracted in either record. ↩
  5. Boston Gas plan, D.P.U. 24-164 Tables G22-D and G23-D, PDF 134 and 137 [Page 43 and 46 of 74]; design day 1,406 to 1,457 BBtu. ↩
  6. DPU order D.P.U. 24-164 PDF 34 (printed page 32), footnote 12; next plan due November 1, 2026; Boston Gas six-year agreement approved May 2024 (Boston Gas plan, D.P.U. 24-164 PDF 78). ↩
  7. Joint order, D.P.U. 25-133/25-134, January 30, 2026: 25,000 Dth/day and 74% PDF 8-9 [5-6]; 34,000 Dth/day PDF 25 (printed page 22); EMT beyond 2030 PDF 28 (printed page 25); 9,000 Dth/day PDF 9 (printed page 6); approval PDF 37-38. ↩
  8. NSTAR Gas: plan, D.P.U. 24-106 PDF 84 (printed page 77) and 98 (printed page 91); joint order D.P.U. 25-133/25-134 PDF 10 (printed page 7), PDF 12 (printed page 9), PDF 28 (printed page 25). Contract counterparty Constellation LNG: NSTAR Gas plan, D.P.U. 24-106 PDF 14, Boston Gas plan, D.P.U. 24-164 PDF 78. ↩
  9. Boston Gas Exhibit NG-4 workbook, D.P.U. 24-164: column label "Total Firm Peak Hour Balance (-) = Shortfall (+) = Surplus"; stations with a negative balance among the 37 take stations: 19, 20, 21, 20, 22. Each station is classified inside, outside or unclear using the town named in the plan. Design hour criterion: Boston Gas plan, D.P.U. 24-164 PDF 71 (printed page 69). Accessed November 2, 2026 against the saved workbook: the Burlington, Arlington and Revere balances in the table and the stations with a negative balance (19, 20, 21, 20 and 22 of the 37) are reproduced exactly, with the Essex region subtotal and the two Haverhill supply rows left out of the station count. It is the latest Boston Gas hourly analysis in the record (note 32). ↩
  10. Boston Gas plan, D.P.U. 24-164 PDF 88 (printed page 86), PDF 73 (printed page 71); DPU order D.P.U. 24-164 PDF 8 (printed page 6), footnote 5. The plan's 4.53% portfolio figure is not used: its basis is not shown in the public record. ↩
  11. Standards: Boston Gas plan, D.P.U. 24-164 PDF 68 (printed page 66); EGMA plan, D.P.U. 23-125 PDF 70-71; EGMA design hour PDF 102 (printed page 100); NSTAR Gas plan, D.P.U. 24-106 PDF 14 (printed page 7), DPU order D.P.U. 24-106 PDF 7 (printed page 5); NSTAR Gas design hour NSTAR Gas plan, D.P.U. 24-106 PDF 14-15. Boston Gas's earlier 1:47.9: DPU order D.P.U. 24-164 PDF 8 (printed page 6); National Grid Everett response PDF 8. Orders finding standards reviewable: DPU order D.P.U. 24-164 PDF 11-12, DPU order D.P.U. 23-125 PDF 33, DPU order D.P.U. 24-106 PDF 36. ↩
  12. Filing dates and plan periods as printed: Boston Gas 2024/25 to 2028/29; EGMA 2023/24 to 2027/28; NSTAR Gas 2024/25 to 2028/29. DPU order D.P.U. 24-164, DPU order D.P.U. 23-125, DPU order D.P.U. 24-106. Division lists: Boston Gas (Boston, Essex, Lowell, Cape Cod), EGMA (Brockton, Lawrence, Springfield), NSTAR Gas (Worcester, Framingham, Cambridge, New Bedford). Dates as printed are in note 32; the NSTAR Gas plan in docket D.P.U. 26-94 covers November 1, 2026 to October 31, 2031 (note 30). ↩
  13. Contract end dates: NSTAR Gas plan, D.P.U. 24-106 PDF 84; EGMA joint order D.P.U. 25-133/25-134 PDF 9; DPU notice D.P.U. 25-133/25-134; Boston Gas last contract winter Boston Gas plan, D.P.U. 24-164 PDF 78; 2024 approvals joint order D.P.U. 25-133/25-134 PDF 9. Direct connection: National Grid Everett response PDF 2; vaporized LNG delivered directly into the Everett distribution system: Boston Gas plan, D.P.U. 24-164 PDF 78 (printed page 76). ↩
  14. Metro and limits. Metro: Boston-Cambridge-Newton, MA-NH MSA per OMB Bulletin No. 23-01, July 21, 2023 (counties: Middlesex, Essex, Suffolk, Norfolk and Plymouth in Massachusetts, and Rockingham and Strafford in New Hampshire), delineation file PDF 49 (title, date and county list confirmed). No registered file gives the county of each town; the assignments were made manually and checked against the OMB county list. Plan labels with no town (Polaroid, Trapelo Rd, Maple St, Camp Curtis) are unclear. Boston Gas's Cape Cod division and the NG-4 stations outside rows 11-40, 50-59 are not in the 37-station count. The record has no pipeline capacity postings, event history, rate or bill data, and none of the later plans (National Grid due November 2026; EGMA due November 2025; NSTAR Gas docket 26-94). Quotes behind this page were checked against the saved sources; this verifies text presence, not meaning. Update of November 2, 2026: the NSTAR Gas plan in docket 26-94 is now in the record (notes 30 and 33); National Grid's plan due November 2026 and EGMA's plan due November 2025 are not. ↩
  15. Feb 3, 2023 observed against design-day EDD: EGMA plan, D.P.U. 23-125, PDF 69 (footnote: 79 EDD in Springfield, 79 in Lawrence) and PDF 71 (design days 78 Springfield, 80 Lawrence); NSTAR Gas plan, D.P.U. 24-106, Figure 39 PDF 64 (Cambridge, 02/03/23, 77 EDD) and Table DD PDF 111 (Cambridge design day 81). Percentages of design EDD are the observed value divided by the design value: Springfield 101.3%, Lawrence 98.8%, Cambridge 95.1%. These are the plans' own observations on one day, not a measure of service. ↩
  16. Search, October 2026, for new gas loads in or near the metro: EIA-860M September 2026 Planned sheet filtered by county; Federal Register FERC notices since January 2025 searched by county for pipeline (CP) dockets; we computed both from the saved files. A web search found no gas turbine application in Massachusetts; the Lowell data center filing covers diesel generators. News is leads only and none is used. ↩
  17. Risk factors in Discovery Energy's outlook scale: concentration and a more likely design day are counted (notes 1 and 11). Expiring supply is not counted: Boston Gas's last-winter Everett contract is 5.35% of the 2028/29 design day, below the 10% test, and the plan states no firm interstate pipeline capacity total for the second test. A recent supply event, new load ahead of a fix, an upstream pipeline limit and LNG supply availability stress are not counted: the record shows no gas supply event tied to a shortfall, no new load with a service date, and no upstream pipeline limit capping a station inside the metro, and the LNG test (note 19) found no filing or official notice of availability stress for Everett's supply.
  18. LNG cargo statement: EGMA petition, D.P.U. 25-133, September 2, 2025, PDF 25 (page 7 of 39 of the petition), redacted initial filing. A utility statement, not a DPU finding. It says the number of LNG cargoes has declined over the last decade because of pipeline projects, LNG providers receiving better pricing elsewhere, and a lack of forward contracts by buyers in New England; it does not say Boston Gas's or NSTAR Gas's contracted Everett supply is short. ↩
  19. LNG supply availability stress, tested with documented supply availability, not price. Documented, at global and regional level: the closure of the Strait of Hormuz affecting LNG markets (ACER); an estimated 120 bcm of LNG supply loss between 2026 and 2030 and about 10 bcm lost for each month without transits (IEA, as reported by Engineering News); withheld Qatari cargoes to an Italian buyer; a decade-long decline in New England cargoes (note 18). Not documented: any filing or official notice that cargoes for Everett's contracted supply to Boston Gas or NSTAR Gas have been withheld or are short; our search of the saved DPU texts for cargo, tanker, vessel and shipment found hits only in the EGMA petition (the passage in note 18, and a generic description of LNG tankers). The factor is therefore not counted; the evidence concerns the market, not Everett's own supply. The level does not depend on this test.
  20. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, Retired sheet, accessed October 28, 2026: rows 416 to 421 (Mystic Generating Station, Middlesex County, six natural gas combined-cycle units, retirement June 2024), rows 549 and 550 (Potter Station 2, Braintree, Norfolk County, retirement January 2024) and row 23 (Waters River, Peabody, Essex County, 21.3 MW combustion turbine, retirement June 2026). Each is an electric generator; EIA does not tie it to any gas utility's supply. ↩
  21. Federal Register, FERC notice of scoping period, Algonquin Reliable Affordable Resilient Enhancement Project, document 2026-11538, June 9, 2026, pages 34820-34823, docket PF26-7-000 (docket opened February 24, 2026): facilities in Middlesex County, Connecticut, Worcester and Norfolk Counties, Massachusetts, and Newport and Providence Counties, Rhode Island; about 8.3 miles of 16-inch pipe to be replaced with 36-inch pipe; comments due July 6, 2026; no formal application had been filed. The notice does not say who the project would serve. ↩
  22. U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA), closure letter, CPF 1-2020-014-CAO, November 17, 2021, page 1: corrective action order of October 1, 2020 and amended order of October 30, 2020 to Algonquin Gas Transmission after events on September 11 and September 30, 2020 at the Weymouth Compressor Station (Weymouth is in Norfolk County); the letter says Algonquin completed a temporary removal of the pressure restriction and the order is closed. The 2020 orders themselves could not be downloaded. ↩
  23. Federal Register, FERC Combined Notice of Filings, document 2026-20217, October 2, 2026, pages 62725-62726: Algonquin Gas Transmission, LLC, docket RP26-1291-000, "AGT September 2026 OFO Penalty Disbursement Report," filed September 29, 2026. The notice gives no amounts and does not say whether penalties were charged. ↩
  24. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Boston Logan International Airport (station USW00014739). Sums are our calculation. Heating degree days behind the percentages: 3935 in 2023-24, 4160 in 2024-25 and 4530 in 2025-26, against a 1991-2020 normal of 4360. ↩
  25. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Boston location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so Boston has at least 40% above-normal, about 33% near-normal and no more than 26.7% below-normal for November 2026 to January 2027, and at least 50%, about 33% and no more than 16.7% for December 2026 to February 2027. ↩
  26. The station is Boston Logan International Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  27. Federal Register, Federal Energy Regulatory Commission notices that name Middlesex County, Massachusetts, found by our search of notices since January 1, 2025 for county names in the singular and the plural; we saved the text of each notice. (a) Distrigas of Massachusetts LLC; Notice of Application and Establishing Intervention Deadline, document 2025-07561, published May 1, 2025, 90 FR 18654 to 18655 (docket CP25-207-000): Distrigas of Massachusetts' application of April 14, 2025 to amend its authorization for its liquefied natural gas (LNG) import terminal and regasification facilities in Everett, Middlesex County, Massachusetts, to install a redundant boil-off gas compressor and associated systems within aboveground structures in the existing terminal footprint (BOG Compressor Project). The notice states no change in terminal send-out capacity, names no utility, shipper or gas load, and we did not read the application itself. A second FERC notice flagged by our search, document 2026-11538 (note 21), lists Middlesex County, Connecticut, which is not in the metro. ↩
  28. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that milder Northeast weather offsets part of the expected rise in heating oil prices (source A2). EIA's October 2026 Short-Term Energy Outlook says prolonged periods of cold weather could increase withdrawals beyond its forecast (source A3). These are national and regional facts, not statements about National Grid's or Eversource's systems, and none of them is used to set the outlook on this page. ↩
  29. The International Energy Agency said on April 24, 2026, as reported by Engineering News, that the conflict could remove around 120 billion cubic metres of LNG supply between 2026 and 2030, 15% of expected global supply, and that each month without LNG cargoes through the strait costs around 10 billion cubic metres (source A11). ACER says Russian pipeline gas and LNG together still covered at least 14% of EU gas imports in 2025-2026, and that the United States supplies over 60% of the EU's LNG (source A5). Under Regulation (EU) 2026/261, Russian LNG under short-term contracts could be imported only until April 25, 2026, and Russian LNG under long-term contracts, allowed to continue to the end of 2026, is prohibited from January 1, 2027 (source A4). European storage was 74.62% full on October 24, 2026 on the Gas Infrastructure Europe AGSI+ platform (an estimated value), and Global LNG Hub, citing AGSI+, reported it down 16.5% from the five-year average on October 16 (sources A8 and A10). U.S. storage is the reverse: EIA's weekly table shows 3,644 Bcf of working gas on October 16, 2026 (source A7), and EIA expects U.S. inventories to enter winter 2% above the five-year average (source A2). TTF and JKM, the European and Asian LNG benchmarks, are commercial price benchmarks, so a named market source is used: Global LNG Hub reported the European benchmark (TTF) at USD 28.9/MBtu and the Northeast Asian benchmark (JKM) in the high USD 29s/MBtu on October 16, 2026 (source A10). EIA's Henry Hub spot price was $3.10 per MMBtu on October 20, 2026 (source A9). An Italian buyer said QatarEnergy had extended a force majeure notice, withholding four more cargoes until early September (source A12). ↩
  30. NSTAR Gas Company, Long-Range Forecast and Supply Plan 2026/2027 to 2030/2031, D.P.U. 26-94 (November 2, 2026). Cover, PDF 1: "July 17, 2026." Department of Public Utilities notice of filing, public hearing and request for comments, August 10, 2026, PDF 1: "On October 30, 2025, NSTAR Gas Company d/b/a Eversource Energy" filed the petition, for "the five-year period of November 1, 2026, through October 31, 2031"; the public hearing was set for October 6, 2026. The filing date and the cover date are both as printed; the saved documents do not explain the difference. ↩
  31. Everett Marine Terminal Focus Area Working Group Report to the Energy Transformation Advisory Board, prepared by Groundwork Data and the Consensus Building Institute for the Massachusetts Office of Energy Transformation, June 11, 2026 (November 2, 2026; its appendix is saved and was not read in full). PDF 27: the report says "no feasible combination of demand reduction, pipeline reconfiguration, or distributed storage has been identified" that would let the utilities serving Greater Boston operate reliably without the terminal in 2030. A working-group report to an advisory board, not a DPU finding. ↩
  32. Dates as printed, with the saved copies checked against the source register. D.P.U. 24-164 (Boston Gas): DPU order dated October 30, 2025 (PDF 1); plan period "November 1, 2024, to October 31, 2029" (PDF 1); next plan due "by November 1, 2026" (PDF 37). We found no closing date for the docket in the saved documents. D.P.U. 23-125 (EGMA): plan transmitted November 1, 2023 for "November 1, 2023 through October 31, 2028" (PDF 1); DPU order dated October 25, 2024 (PDF 1; period in the order, PDF 3). The copies saved in November 2026 are byte-for-byte the files already registered for this page. The plan Boston Gas was due to file by November 1, 2026 is not in the record. ↩
  33. NSTAR Gas plan, D.P.U. 26-94 (note 30). Design day adequacy for the base case, Figure 51, PDF 113 (printed page 108), in BBtu for 2026-27 to 2030-31: "Peak Day Sendout 535.9 541.6 546.3 550.4 554.7" and "Needed Supplies 5.8 11.3 16.0 20.0 39.3." Shares are our calculation, Needed Supplies divided by the peak-day total: 1.1%, 2.1%, 2.9%, 3.6% and 7.1%. The 2024 plan's 8.2% for 2028/29 is 46.8 divided by 568.1 (note 3); the 2026 table calls the line "Needed Supplies" and shows the Constellation LNG supply separately as "Secured Supplies," so the two are not like for like. PDF 113: the termination date of May 31, 2030 "explains an increase in Needed Supplies starting in the 5th year." PDF 112 (printed page 107): the company "projects a design year deficiency in all five years with the current portfolio." PDF 92 (printed page 87): the company "has not yet determined its next course of action at this time" on Constellation LNG, and the contract "runs through May 31, 2030." PDF 12 (printed page 7): "The Design Hour criteria is based upon customer usage data and can vary throughout the system"; the plan gives no design-hour value and no station results. No DPU order in D.P.U. 26-94 is among the saved documents. ↩

Market and weather sources

Accessed October 25, 2026 unless noted. Official sources come first; named market and news sources are used only where no official source exists, and each is marked. They are separate from the DPU-record notes above. Dated figures are refreshed on the publication date.

  1. A1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, October 15, 2026 (official). Link ↩
  2. A2. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026 (official). Link
  3. A3. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (official). Link
  4. A4. European Parliament and Council of the EU, Regulation (EU) 2026/261 of January 26, 2026 on phasing out Russian natural gas imports, recital 14 and Article 4 (official; Official Journal text, quotes confirmed against the saved text). Link ↩
  5. A5. ACER, report on Russian gas imports and the implementation of Regulation (EU) 2026/261, 2026 (official EU agency). Link ↩
  6. A6. U.S. Energy Information Administration, U.S. Liquefied Natural Gas Imports by Point of Entry, monthly, February to July 2026 (official). Link ↩
  7. A7. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, week of October 16, 2026, released October 22, 2026 (official). Link
  8. A8. Gas Infrastructure Europe, AGSI+ storage inventory, EU aggregate, gas day October 24, 2026 (industry transparency platform;). Link ↩
  9. A9. U.S. Energy Information Administration, Henry Hub Natural Gas Spot Price, released October 21, 2026 (official). Link
  10. A10. Global LNG Hub, "Natural gas prices weekly update - JKM, TTF and Henry Hub," October 19, 2026 (named market source; TTF and JKM are commercial price benchmarks; AGSI+ storage as cited by the publisher). Link ↩
  11. A11. Engineering News, "Middle East war could cause 120 bcm of LNG supply loss from 2026 to 2030 - IEA," April 24, 2026 (news report of the IEA's quarterly gas outlook; the IEA site blocks automated downloads). Link ↩
  12. A12. CNBC, "LNG market disruption: QatarEnergy extends force majeure with Edison," July 1, 2026 (news report; no official QatarEnergy statement could be downloaded; later extensions are not covered). Link ↩
  13. B1. NOAA Climate Prediction Center, ENSO Diagnostic Discussion, October 8, 2026 (official). Link ↩
  14. B2. ISO New England, 2026 Winter Quarterly Markets Report, July 2026 (official). Link ↩
  15. B3. U.S. Energy Information Administration, Today in Energy, "Record natural gas stock withdrawals during week ending January 30, 2026," February 5, 2026 (official). Link ↩
  16. C1. U.S. Department of Energy, news release, "Energy Secretary Secures New England and Texas Grids Amid Winter Storm Fern," January 25, 2026 (official). Link ↩
  17. Map base data:. Natural Earth (public domain), coastline and roads, naturalearthdata.com.

Sources

  1. Boston Gas Company (National Grid), Long-Range Forecast and Supply Plan, D.P.U. 24-164, November 1, 2024, with Exhibit NG-4 and Appendix B.
  2. Massachusetts DPU, order on Boston Gas Company's plan, D.P.U. 24-164.
  3. National Grid, response to the DPU's Everett Marine Terminal inquiry, July 2023.
  4. Eversource Gas Company of Massachusetts, Long-Range Forecast and Supply Plan, D.P.U. 23-125, November 1, 2023; DPU order, October 25, 2024.
  5. NSTAR Gas Company, Long-Range Forecast and Supply Plan, D.P.U. 24-106, July 19, 2024; DPU order, July 14, 2025.
  6. NSTAR Gas Company, Long-Range Forecast and Supply Plan, D.P.U. 26-94, for November 1, 2026 to October 31, 2031 (cover dated July 17, 2026); Department of Public Utilities notice, August 10, 2026.
  7. Massachusetts Office of Energy Transformation, Everett Marine Terminal Focus Area Working Group Report to the Energy Transformation Advisory Board, June 11, 2026.
  8. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  9. Massachusetts DPU, joint order, D.P.U. 25-133 and D.P.U. 25-134, January 30, 2026; DPU notice.
  10. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026 (Planned sheet), and Federal Register notices of the Federal Energy Regulatory Commission searched by county, October 2026.
  11. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-20217, published October 2, 2026. Link
  12. Federal Register (FERC), Algonquin Gas Transmission, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Algonquin Reliable Affordable Resilient Enhancement Project, document 2026-11538, published June 9, 2026. Link
  13. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  14. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00014739. Link
  15. Federal Register (FERC notice), Distrigas of Massachusetts LLC; Notice of Application and Establishing Intervention Deadline (FR 2025-07561, May 1, 2025). Link

Figures are as reported in the sources above as of October 2026. Utility statements and DPU findings are kept separate. Nothing here is a decision or a cost estimate. The outlook is a qualitative rating of the public record, not a forecast of outages. - Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, Federal Register document 2026-20217, published October 2, 2026. https://www.federalregister.gov/documents/2026/10/02/2026-20217/combined-notice-of-filings - Federal Register (FERC), Algonquin Gas Transmission, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Planned Algonquin Reliable Affordable Resilient Enhancement Project, document 2026-11538, published June 9, 2026. https://www.federalregister.gov/documents/2026/06/09/2026-11538 - U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. https://www.eia.gov/electricity/data/eia860m/ - NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00014739. https://data.rcc-acis.org/StnData - Federal Register (FERC notice), Distrigas of Massachusetts LLC; Notice of Application and Establishing Intervention Deadline (FR 2025-07561, May 1, 2025). https://www.federalregister.gov/documents/2025/05/01/2025-07561/distrigas-of-massachusetts-llc-notice-of-application-and-establishing-intervention-deadline

Corrected November 9, 2026: The earlier version said our Federal Register search since January 2025 found no FERC notice naming one of the seven metro counties together with a natural gas pipeline docket. The search found two: Distrigas of Massachusetts' April 2025 application for its Everett LNG terminal (Middlesex County) and the June 2026 notice on Algonquin's regional pipeline project (Norfolk County). The earlier version said at least 14 of Boston Gas's 37 take stations are inside the metro with a negative balance; the 37 stations include 7 whose location is unclear and 6 outside the metro, so the statement now reads at least 14 of the 24 stations classified inside the metro. The earlier version said 3 of 3 Tennessee stations north of Boston were negative in all five winters; nine inside-metro lateral 3 stations are, and the three on the maps are the largest. It described the 15% Everett share as covering Boston Gas's whole Massachusetts system and its Cape Cod division; the response does not say which divisions it covers, so the page now says we read it as company-wide. It said oil supplied 6% of New England's winter supply; the ISO New England figure is its electricity supply mix. The page now says the NSTAR Gas G-System contract also names Plymouth, and that the record does not show where the Plymouth citygate is or how Plymouth is covered. The NSTAR Gas G-System contract to the Plymouth citygate is now counted as inside the metro, following Discovery Energy's own assessment, because no saved document places the citygate; the outlook level and confidence do not change.