Energy procurement in Virginia: buying electricity and natural gas for business
How commercial and industrial companies in Virginia handle energy procurement, whether they call it electricity contracting, choosing a supplier or buying natural gas: who can choose, what the default service is, how PJM sets the costs behind the price, how contracts are structured, and the news that moves prices, updated weekly.
Some Virginia businesses can buy electricity from a competitive supplier (see the limits below), while the utility keeps delivering it. Natural gas can be bought from a marketer through the utility's choice program or transportation service. Discovery Energy Utility Audits buys electricity and natural gas for multi-site companies with sites in Virginia: it inventories every account, invites every active supplier to one RFP, compares offers line for line, tracks each contract to renewal in TaraBase and audits the utility bills behind it. Its procurement fee is disclosed in advance.
01 / 08
Virginia at a glance
| Business electricity choice | Limited (size threshold, cap or exit approval) |
|---|---|
| Natural gas supplier choice | Yes: choice programs reach small businesses; large users take transportation service |
| Grid operator (wholesale market) | PJM |
| Default electricity service | Dominion Energy Virginia and Appalachian Power by tariff; cooperatives |
| Capacity costs | PJM Base Residual Auction (passed through utility rates) |
| Regulator | Virginia State Corporation Commission (SCC) |
| Broker and supplier licensing | Competitive service providers and aggregators licensed by the SCC |
| Gas pricing points | Transco Zone 5 North, Columbia Gas TCO, Dominion South |
02 / 08
Electricity procurement in Virginia
Virginia's retail choice is limited to large customers. Since 2009, nonresidential customers of Dominion Energy Virginia and Appalachian Power with demand above 5 MW (or two or more customers aggregating to 5 MW with SCC approval) can buy from a licensed competitive service provider, and any customer can buy 100% renewable supply from a provider when the utility has no approved equivalent tariff. HB 921, signed in 2026 and effective July 1, 2026, removed the 1% cap on how much load could leave and shortened the notice to return to utility service to 18 months.
In PJM, capacity is bought three years ahead in the Base Residual Auction and billed through each account's peak load contribution (PLC). The auction cleared at $329.17 per MW-day for 2026/27, $333.44 for 2027/28 and $325 (the cap) for 2028/29, against $28.92 for 2024/25. See PJM capacity charges. Virginia has the world's largest concentration of data centers, and Dominion's new GS-5 class for loads of 25 MW and up (effective 2027) and its rate cases change what every large customer pays.
03 / 08
How energy contracts are structured in Virginia
What a buyer in Virginia actually signs, and the terms that decide the final cost:
- Shopping customers (above 5 MW): fixed, fixed with capacity and transmission passed through, or PJM Dominion zone index; check the return-to-service notice and minimum stay terms.
- Natural gas: Columbia Gas of Virginia and Washington Gas run customer choice programs; Virginia Natural Gas and Roanoke Gas offer transportation for large users. Gas is priced at Transco Zone 5 North, Columbia Gas TCO or Dominion South.
Each structure is explained in energy contract structures, and how capacity, transmission and ancillary costs differ by grid is in charges by market.
04 / 08
Buying natural gas for business in Virginia
Columbia Gas of Virginia and Washington Gas (northern Virginia) let smaller customers choose a gas supplier; Virginia Natural Gas (Hampton Roads), Roanoke Gas and others offer transportation for larger users. Discovery rates winter capacity in its Hampton Roads outlook and Richmond winter stress record.
How transportation service, balancing and NYMEX plus basis pricing work is explained in natural gas procurement.
| Utility | Area | Supplier option |
|---|---|---|
| Columbia Gas of Virginia | Chesterfield, Portsmouth, Lynchburg and more | Customer choice; transportation for large C&I |
| Washington Gas | Northern Virginia | Customer choice; transportation |
| Virginia Natural Gas | Hampton Roads | Transportation for large C&I |
| Roanoke Gas | Roanoke Valley | Transportation for large C&I |
05 / 08
Electric utilities in Virginia and where supplier choice is open
Virginia has 33 retail electric utilities in the U.S. electric utility directory: 3 limited choice, 30 no supplier choice. Supplier choice follows the utility, not the city: a site served by a municipal utility or a cooperative usually cannot buy from a competitive supplier even in a deregulated state. EIA lists 5 retail power marketers reporting sales to customers in Virginia.
- Limited choice
- No supplier choice (cooperative or municipal)
Each Virginia county is shaded by whether its main electric utility (most customers per county served) lets businesses buy supply from a competitive supplier. Hover or tap a county to see every utility serving it and its status.
| Utility | Type | Customers | Counties | Supplier choice |
|---|---|---|---|---|
| Dominion Energy Virginia / North Carolina | Investor-owned | 2,480,094 | 97 | Limited choice |
| Appalachian Power (AEP) | Investor-owned | 531,677 | 34 | Limited choice |
| Northern Virginia Elec Coop | Cooperative | 170,124 | 7 | No supplier choice |
| Rappahannock Electric Coop | Cooperative | 163,691 | 22 | No supplier choice |
| Shenandoah Valley Elec Coop | Cooperative | 94,640 | 11 | No supplier choice |
| Southside Electric Coop, Inc | Cooperative | 56,450 | 18 | No supplier choice |
| City of Danville - (VA) | Municipal | 48,069 | 5 | No supplier choice |
| Central Virginia Electric Coop | Cooperative | 37,134 | 14 | No supplier choice |
| A & N Electric Coop | Cooperative | 35,520 | 2 | No supplier choice |
| Mecklenburg Electric Cooperative | Cooperative | 31,220 | 9 | No supplier choice |
| Kentucky Utilities (PPL) | Investor-owned | 27,933 | 6 | No supplier choice |
| City of Harrisonburg - (VA) | Municipal | 21,228 | 1 | No supplier choice |
| Northern Neck Elec Coop, Inc | Cooperative | 19,069 | 6 | No supplier choice |
| Bristol Virginia Utilities | Municipal | 16,334 | 3 | No supplier choice |
| City of Manassas - (VA) | Municipal | 16,258 | 1 | No supplier choice |
| City of Salem - (VA) | Municipal | 13,381 | 2 | No supplier choice |
| BARC Electric Coop Inc | Cooperative | 12,770 | 5 | No supplier choice |
| Prince George Electric Coop | Cooperative | 11,786 | 6 | No supplier choice |
| Community Electric Coop | Cooperative | 11,139 | 5 | No supplier choice |
| Powell Valley Electric Coop | Cooperative | 8,175 | 3 | No supplier choice |
| City of Martinsville - (VA) | Municipal | 7,700 | 2 | No supplier choice |
| Town of Front Royal | Municipal | 7,658 | 1 | No supplier choice |
| City of Radford - (VA) | Municipal | 7,456 | 3 | No supplier choice |
| Town of Bedford - (VA) | Municipal | 6,674 | 1 | No supplier choice |
| Craig-Botetourt Electric Coop | Cooperative | 6,618 | 6 | No supplier choice |
The table shows the 25 largest by customers. All 33, with the counties each serves, are in the Virginia electric utility directory.
06 / 08
Virginia energy market and regulatory feed
Rate cases, commission orders, grid operator decisions, legislation and Discovery research that move electricity and natural gas prices in Virginia, checked every Saturday. Items with a grid or national label apply to the whole region. Machine-readable: state-feeds.json.
Last item ; 12 shown, newest first.
Virginia SCC opens hearing on $67 billion Dominion-NextEra merger, with rate-freeze conditions in dispute
The State Corporation Commission began evidentiary hearings on Nov. 17 on NextEra's proposed purchase of Dominion Energy. SCC staff recommend rejecting the deal as filed. The governor wants a six-year freeze on residential base rates. Amazon said it would give up the bill credits proposed for GS-5 customers.
Why it matters for buyers: The merger conditions could shape Dominion's base rates, riders and large-load (GS-5) terms in the coming years. Buyers on Dominion service should budget for the outcome. The SCC's presumed deadline for a final order is Jan. 11, 2027.
Source: WTVR
PJM asks FERC to cut data center grid connection studies from 24 to 12 months
PJM filed a 1,067-page proposal at FERC on Nov. 16 for a combined study of generators, transmission upgrades and large loads. It would cut study time from 24 to 12 months. PJM wants a ruling within 120 days, which points to about mid-March 2027.
Why it matters for buyers: Large new loads in PJM may get faster energization if they bring generation or can curtail. That changes how multi-site buyers should time expansions and what they assume about upgrade cost allocation. Watch for new large-load tariff terms to audit.
Source: PJM Interconnection (Fast Energization, Members Committee, Nov. 5, 2026)
FERC to take up Sabine Pass Stage 5 LNG expansion and pipeline at its Nov. 19 open meeting
FERC's Nov. 19 agenda, set by the Nov. 12 sunshine notice, includes Cheniere's Sabine Pass Stage 5 expansion. The project adds three liquefaction trains and a 55.6-mile pipeline to deliver up to 3.6 Bcf/d to the terminal.
Why it matters for buyers: If approved and built, it would add a large new block of feedgas demand on the Gulf Coast. That supports Henry Hub and Gulf basis over the long term, so it matters for multi-year gas contract terms.
Source: Lexology (FERC meeting agenda summary)
Loudoun County, Virginia supervisors approve a 12-month pause on data center applications
Loudoun County's Board of Supervisors voted 7-1-1 on Nov 17, 2026 to stop acting on legislative data center and substation applications (rezonings and special exceptions) for 12 months, counted from Sept 15, while it finishes Phase Two of its data center zoning standards, Loudoun Now reports. Staff will keep accepting…
Source: Data Center Index
PJM files ride-through rules at FERC for data centers and other loads of 50 MW or more
On Nov. 16 PJM filed a proposal with FERC creating a Large Computational Load category for sites of 50 MW or more. These loads would have to stay connected during voltage and frequency disturbances. The filing follows a July 22 event in which about 3.9 GW of data center load dropped off the grid.
Why it matters for buyers: New technical conditions may attach to interconnection and service for large sites. Buyers with data center or other large computational load should check them against site plans and utility service agreements before signing new capacity or supply commitments.
Source: PJM Inside Lines
EIA: Lower 48 gas storage reaches 3,862 Bcf after 61 Bcf injection, 75 Bcf above five-year average
EIA's Nov. 13 report for the week ending Nov. 6 showed a 61 Bcf injection. Inventories rose to 3,862 Bcf, 2% above the five-year average. The five-year average build for the week was about 40 Bcf, and December Henry Hub futures settled down 3.3% at $3.23/MMBtu.
Why it matters for buyers: Storage is above normal heading into winter, which backs the soft Henry Hub outlook. Buyers with index-based gas or pass-through supply contracts can see lower near-term costs. Those considering fixed-price deals have less pressure to lock in now.
Source: fxempire / Finimize (citing EIA Weekly Natural Gas Storage Report)
Blackcomb pipeline enters service, adding up to 2.5 Bcf/d of Permian takeaway as Waha cash holds near $1.87
The Blackcomb pipeline began service in November, with volumes to ramp up through 2027. It joins the Gulf Coast Express expansion and Hugh Brinson Phase 1 for up to about 4.57 Bcf/d of added Permian capacity. Waha cash traded around $1.87/MMBtu on Nov. 10–13.
Why it matters for buyers: Added Permian egress moves more gas toward the Gulf Coast and LNG demand. That narrows Waha's discount and can shift Texas and Southwest basis, which matters when pricing index-based gas and renewals.
Source: EBC Financial Group (citing IEA data); Aegis Hedging
PJM's market monitor says data center load added about $30 billion to capacity costs
Monitoring Analytics, PJM's independent market monitor, said in its state-of-the-market report that including forecast data center demand in the capacity market has raised capacity costs for all customers by close to $30 billion across recent auctions, and recommended excluding forecast data center load and requiring large new loads to bring their own generation.
Why it matters for buyers: Capacity is now one of the largest pieces of a PJM supply price. Check whether your contracts fix or pass through capacity, manage peak load contributions before next summer's peaks, and audit capacity tags on every bill.
Source: Pennsylvania Capital-Star
LNG feedgas sets a daily record as December gas futures firm
The American Gas Association's market indicators report U.S. LNG feedgas hit a new daily record on November 7, and December Henry Hub futures settled near $3.22 per MMBtu on a short cold spell, even as EIA raised its 2026 production forecast.
Why it matters for buyers: Record export demand keeps a floor under NYMEX prices; buyers layering winter and 2027 volumes should spread purchases rather than chase one weather-driven week.
Source: American Gas Association
EIA cuts its winter Henry Hub forecast to $2.87 per MMBtu
In its November Short-Term Energy Outlook, EIA lowered its November-to-March Henry Hub spot price forecast by 16% to $2.87 per MMBtu, about 36% below last winter, citing a warm start to November and production growing faster than demand and LNG exports. It expects Henry Hub to average $2.88 in 2027, down from $3.37 in 2026.
Why it matters for buyers: A softer winter strip is a window to fix 2027 and 2028 gas supply for plants on transportation service; basis at constrained citygates can still spike in a cold snap, so lock basis separately where winter delivery is tight.
Source: American Public Power Association (EIA Short-Term Energy Outlook)
Richmond Natural Gas Winter Stress Record
Richmond is not rated; Columbia Gas Transmission posted critical days on 55 gas days in winter 2025-26.
Source: Discovery Energy
Washington DC and Baltimore Natural Gas Winter Stress Record
Washington DC, Northern Virginia and Baltimore are not rated; Columbia Gas Transmission posted critical days on 55 gas days in winter 2025-26.
Source: Discovery Energy
07 / 08
How Discovery Energy buys energy for companies in Virginia
Inventory
Every Virginia account: utility, rate class, default or supplier service, contract end date, usage, capacity and transmission tags.
Check the bills
Rate class, riders, demand and meter setup tested against the tariff before a contract locks in the baseline. See utility bill audits.
Time and bid
One RFP to every active supplier, timed with the monthly Energy Risk Report, with Virginia sites bid alongside the rest of the portfolio. See the multi-state RFP.
Compare and sign
Offers side by side on the same terms: fixed, fixed with pass-throughs, index, block and index or layered. No contract is signed without your written approval.
Track
Every contract in TaraBase, with renewals flagged well in advance so nothing rolls onto default or month-to-month pricing.
Discovery Energy acts as an energy broker in its procurement work; its energy broker licenses and registrations are held by Energy Auction Exchange, LLC. Its procurement fee is disclosed before any contract is signed (see energy broker fees).
08 / 08
Questions about energy procurement in Virginia
Can businesses in Virginia choose an electricity supplier?
Nonresidential customers of Dominion Energy Virginia and Appalachian Power above 5 MW can, as can groups that aggregate to 5 MW with SCC approval. Any customer can buy 100% renewable supply from a licensed provider when the utility has no approved equivalent tariff. HB 921 (effective July 1, 2026) removed the 1% load cap.
How does electricity contracting work for businesses in Virginia?
A supply contract fixes or indexes the energy price for a term, usually 12 to 36 months, and states which charges are fixed and which pass through (capacity, transmission, ancillary services, renewable requirements). Compare offers on the same structure and term, and check usage tolerance, renewal and early termination terms before signing.
How do I buy natural gas for my business in Virginia?
Smaller businesses can pick a gas supplier through the utility's choice program; larger users take transportation service and buy gas from a marketer. Gas is typically priced as NYMEX plus basis at Transco Zone 5 North, Columbia Gas TCO, Dominion South, fixed or index, with the utility's delivery and balancing charges on top.
Which grid operator sets wholesale electricity prices in Virginia?
PJM. The grid operator's energy, capacity and transmission rules decide what a supplier must price into a contract and what a utility passes through its fuel and capacity riders.
Who regulates electricity and natural gas rates in Virginia?
The Virginia State Corporation Commission (SCC) regulates the investor-owned utilities' rates and service rules. Municipal utilities and cooperatives are usually governed by their own boards.
Sources
- Dominion Energy Virginia, competitive energy suppliers, 5 MW threshold, aggregation and 100% renewable supply.
- Virginia Register, retail access rules, SCC Retail Access Rules.
- ElectricChoice, Virginia HB 921, 1% cap removed, 18-month return notice.
- U.S. EIA, Virginia state profile, utilities, prices and energy use.
- U.S. EIA, Form EIA-861 (via Discovery's U.S. electric utility directory), utilities, customer counts and counties served.