Energy procurement by state: where businesses can buy electricity and natural gas

A buying guide for every state where a commercial or industrial company can buy electricity or natural gas from someone other than the utility: supplier choice, the grid behind the price, how contracts are structured, which utilities are open, and a weekly feed of the rulings and news that move prices.

Businesses can choose an electricity supplier in 13 states and the District of Columbia, with limited choice in 6 more, and can buy natural gas from a marketer in nearly every state through choice programs or utility transportation service. Discovery Energy Utility Audits runs one procurement across all of them for multi-site companies, audits the utility bills behind every contract, and tracks each renewal in TaraBase.

01 / 05

Map: electricity and natural gas procurement options by state

Each state page has a county map of its electric utilities showing where supplier choice is open, a table of its gas utilities and how businesses can buy gas, and the feed of current regulatory and market news.

Map of U.S. states by electricity and natural gas procurement options for businessesAlaska: electricity regulated; natural gas large-user transport; No ISO (Railbelt utilities)Alabama: electricity regulated; natural gas large-user transport; No ISO (Southern Company; TVA in the north)Arkansas: electricity regulated; natural gas large-user transport; MISO and SPPArizona: electricity regulated; natural gas large-user transport; No ISO (CAISO Western Energy Imbalance Market)California: electricity limited; natural gas choice programs; CAISOColorado: electricity regulated; natural gas large-user transport; No ISO (western markets; SPP in the east)Connecticut: electricity open; natural gas choice programs; ISO-NEDistrict of Columbia: electricity open; natural gas choice programs; PJMDelaware: electricity open; natural gas large-user transport; PJMFlorida: electricity regulated; natural gas large-user transport; No ISO (FRCC region)Georgia: electricity regulated; natural gas choice programs; No ISO (Southern Company)HI: no gas transportation; not coveredIowa: electricity regulated; natural gas large-user transport; MISO (SPP in the west)Idaho: electricity regulated; natural gas large-user transport; No ISO (CAISO Western Energy Imbalance Market)Illinois: electricity open; natural gas choice programs; PJM and MISOIndiana: electricity regulated; natural gas choice programs; MISO (PJM in the east and north)Kansas: electricity regulated; natural gas large-user transport; SPPKentucky: electricity regulated; natural gas choice programs; PJM, MISO and TVALouisiana: electricity regulated; natural gas large-user transport; MISO (SPP in the northwest)Massachusetts: electricity open; natural gas choice programs; ISO-NEMaryland: electricity open; natural gas choice programs; PJMMaine: electricity open; natural gas large-user transport; ISO-NE (northern Maine outside it)Michigan: electricity limited; natural gas choice programs; MISO (PJM in the southwest)Minnesota: electricity regulated; natural gas large-user transport; MISOMissouri: electricity regulated; natural gas large-user transport; MISO and SPPMississippi: electricity regulated; natural gas large-user transport; MISO, Southeast and TVAMontana: electricity limited; natural gas choice programs; No ISO (western markets; MISO and SPP in the east)North Carolina: electricity regulated; natural gas large-user transport; No ISO (Duke Energy); PJM in the northeastNorth Dakota: electricity regulated; natural gas large-user transport; MISO and SPPNebraska: electricity regulated; natural gas choice programs; SPPNew Hampshire: electricity open; natural gas choice programs; ISO-NENew Jersey: electricity open; natural gas choice programs; PJMNew Mexico: electricity regulated; natural gas large-user transport; No ISO (SPP in the east)Nevada: electricity limited; natural gas large-user transport; No ISO (CAISO Western Energy Imbalance Market)New York: electricity open; natural gas choice programs; NYISOOhio: electricity open; natural gas choice programs; PJMOklahoma: electricity regulated; natural gas large-user transport; SPPOregon: electricity limited; natural gas large-user transport; No ISO (CAISO WEIM; PacifiCorp in CAISO's day-ahead market)Pennsylvania: electricity open; natural gas choice programs; PJMRhode Island: electricity open; natural gas large-user transport; ISO-NESouth Carolina: electricity regulated; natural gas large-user transport; No ISO (Duke, Dominion and Santee Cooper)South Dakota: electricity regulated; natural gas large-user transport; SPP and MISOTennessee: electricity regulated; natural gas large-user transport; TVA (no ISO)Texas: electricity open; natural gas large-user transport; ERCOT (SPP, MISO and WECC at the edges)Utah: electricity regulated; natural gas large-user transport; No ISO (PacifiCorp, CAISO day-ahead market)Virginia: electricity limited; natural gas choice programs; PJMVermont: electricity regulated; natural gas large-user transport; ISO-NEWashington: electricity regulated; natural gas large-user transport; No ISO (CAISO WEIM)Wisconsin: electricity regulated; natural gas large-user transport; MISOWest Virginia: electricity regulated; natural gas large-user transport; PJMWyoming: electricity regulated; natural gas choice programs; No ISO (PacifiCorp; western markets)
  • Electricity choice for businesses, plus natural gas
  • Limited electricity choice, plus natural gas
  • Natural gas from marketers (electricity regulated)
  • Not covered

Hover over a state (or tap it) for its procurement options, grid and latest news; click to open its guide.

Electricity and natural gas procurement options by state (November 2026)
StateBusiness electricity choiceNatural gasGrid operator
AlabamaRegulatedLarge-user transportNo ISO (Southern Company; TVA in the north)
AlaskaRegulatedLarge-user transportNo ISO (Railbelt utilities)
ArizonaRegulatedLarge-user transportNo ISO (CAISO Western Energy Imbalance Market)
ArkansasRegulatedLarge-user transportMISO and SPP
CaliforniaLimitedChoice programsCAISO
ColoradoRegulatedLarge-user transportNo ISO (western markets; SPP in the east)
ConnecticutOpenChoice programsISO-NE
DelawareOpenLarge-user transportPJM
District of ColumbiaOpenChoice programsPJM
FloridaRegulatedLarge-user transportNo ISO (FRCC region)
GeorgiaRegulatedChoice programsNo ISO (Southern Company)
IdahoRegulatedLarge-user transportNo ISO (CAISO Western Energy Imbalance Market)
IllinoisOpenChoice programsPJM and MISO
IndianaRegulatedChoice programsMISO (PJM in the east and north)
IowaRegulatedLarge-user transportMISO (SPP in the west)
KansasRegulatedLarge-user transportSPP
KentuckyRegulatedChoice programsPJM, MISO and TVA
LouisianaRegulatedLarge-user transportMISO (SPP in the northwest)
MaineOpenLarge-user transportISO-NE (northern Maine outside it)
MarylandOpenChoice programsPJM
MassachusettsOpenChoice programsISO-NE
MichiganLimitedChoice programsMISO (PJM in the southwest)
MinnesotaRegulatedLarge-user transportMISO
MississippiRegulatedLarge-user transportMISO, Southeast and TVA
MissouriRegulatedLarge-user transportMISO and SPP
MontanaLimitedChoice programsNo ISO (western markets; MISO and SPP in the east)
NebraskaRegulatedChoice programsSPP
NevadaLimitedLarge-user transportNo ISO (CAISO Western Energy Imbalance Market)
New HampshireOpenChoice programsISO-NE
New JerseyOpenChoice programsPJM
New MexicoRegulatedLarge-user transportNo ISO (SPP in the east)
New YorkOpenChoice programsNYISO
North CarolinaRegulatedLarge-user transportNo ISO (Duke Energy); PJM in the northeast
North DakotaRegulatedLarge-user transportMISO and SPP
OhioOpenChoice programsPJM
OklahomaRegulatedLarge-user transportSPP
OregonLimitedLarge-user transportNo ISO (CAISO WEIM; PacifiCorp in CAISO's day-ahead market)
PennsylvaniaOpenChoice programsPJM
Rhode IslandOpenLarge-user transportISO-NE
South CarolinaRegulatedLarge-user transportNo ISO (Duke, Dominion and Santee Cooper)
South DakotaRegulatedLarge-user transportSPP and MISO
TennesseeRegulatedLarge-user transportTVA (no ISO)
TexasOpenLarge-user transportERCOT (SPP, MISO and WECC at the edges)
UtahRegulatedLarge-user transportNo ISO (PacifiCorp, CAISO day-ahead market)
VermontRegulatedLarge-user transportISO-NE
VirginiaLimitedChoice programsPJM
WashingtonRegulatedLarge-user transportNo ISO (CAISO WEIM)
West VirginiaRegulatedLarge-user transportPJM
WisconsinRegulatedLarge-user transportMISO
WyomingRegulatedChoice programsNo ISO (PacifiCorp; western markets)

03 / 05

Latest across the states

The newest items from every state feed, checked every Saturday.

Last item .

  1. RegulatorySouth Carolina

    SC regulators finish November hearings on NextEra–Dominion Energy merger; order due by end of January

    The Public Service Commission of South Carolina held the last of three November public hearings on the proposed $67 billion NextEra–Dominion Energy merger on Nov. 18. Regulators are expected to take up the case in December and issue a final order by the end of January.

    Why it matters for buyers: Dominion Energy South Carolina is the state's main gas transportation utility and a large electric utility. Buyers with long-term contracts or budgets that run through 2027 should watch for merger conditions, such as rate commitments, that could affect tariffs and riders.

    Source: WIS

  2. RegulatoryConnecticut (Natural gas (national))

    FERC to take up Sabine Pass Stage 5 LNG expansion and pipeline at its Nov. 19 open meeting

    FERC's Nov. 19 agenda, set by the Nov. 12 sunshine notice, includes Cheniere's Sabine Pass Stage 5 expansion. The project adds three liquefaction trains and a 55.6-mile pipeline to deliver up to 3.6 Bcf/d to the terminal.

    Why it matters for buyers: If approved and built, it would add a large new block of feedgas demand on the Gulf Coast. That supports Henry Hub and Gulf basis over the long term, so it matters for multi-year gas contract terms.

    Source: Lexology (FERC meeting agenda summary)

  3. LegislationIllinois

    Illinois veto session opens with POWER Act data center energy bill on the agenda; Senate hearing set for Nov 18

    Lawmakers returned to Springfield on Nov 17 for the first of six veto session days (Nov 17–19 and Dec 1–3). The POWER Act is expected to be debated. A Senate committee hearing on SB 4016 is set for Nov 18, and no vote has been reported yet.

    Why it matters for buyers: If enacted, the bill would add rules for large loads such as data centers: reporting hourly demand and covering their own supply. Buyers planning big new Illinois load should watch the Dec 1–3 session days for a vote and for any ICC tariff changes that follow.

    Source: WTVO / Nexstar (mystateline.com)

  4. RegulatoryIllinois (PJM)

    PJM asks FERC to cut data center grid connection studies from 24 to 12 months

    PJM filed a 1,067-page proposal at FERC on Nov. 16 for a combined study of generators, transmission upgrades and large loads. It would cut study time from 24 to 12 months. PJM wants a ruling within 120 days, which points to about mid-March 2027.

    Why it matters for buyers: Large new loads in PJM may get faster energization if they bring generation or can curtail. That changes how multi-site buyers should time expansions and what they assume about upgrade cost allocation. Watch for new large-load tariff terms to audit.

    Source: PJM Interconnection (Fast Energization, Members Committee, Nov. 5, 2026)

  5. MarketIllinois (MISO)

    DOE orders Michigan's Campbell coal plant kept available through Feb. 12, 2027; costs spread across MISO

    DOE issued its seventh emergency order on Nov. 13 for the J.H. Campbell plant. Consumers Energy expects to seek $303 million in net costs through Sept. 30 from FERC, to be spread across MISO's North and Central regions. FERC allowed that allocation in August 2025, and MISO's revised tariff filing is still awaiting FERC approval.

    Why it matters for buyers: Buyers in MISO North/Central states may see an uplift charge through the transmission or wholesale pass-through lines on their bills, with timing depending on FERC. Audit these lines for the new cost recovery, and note the order's three-month scope when budgeting through winter.

    Source: MLQ.ai (citing DOE and CMS Energy 10-Q)

  6. RatesMaine

    Maine PUC sets 2027 Standard Offer: CMP medium business 12.03¢/kWh, Versant Maine Public large 17.30¢

    On Nov. 17 the Maine PUC accepted final 2027 Standard Offer bids for CMP and Versant's Maine Public District. CMP's medium-business average falls from 12.37 to 12.03 cents/kWh. Versant Maine Public medium business rises from 14.68 to 16.09 cents. Large business there rises from 17.16 to 17.30 cents. Rates start Jan. 1, 2027.

    Why it matters for buyers: Medium and large customers who stay on default supply face new 2027 prices, so compare them with retail offers before year-end. CMP's large-business class is indexed to wholesale prices and set monthly, so it is pass-through exposure. Bangor Hydro District bids were due Nov. 18.

    Source: Portland Press Herald / Penobscot Bay Pilot (Maine PUC release)

  7. GridTexas (SPP)

    SPP board approves 2026 Integrated Transmission Plan, with 765-kV lines, across the 14-state footprint

    SPP's board approved the 2026 Integrated Transmission Plan on Nov. 17 and authorized notification-to-construct letters for select projects. SPP projects $2.27 to $6.38 of benefits per dollar invested. The stakeholder committee had earlier endorsed a $23.7 billion portfolio with six more 765-kV projects.

    Why it matters for buyers: Transmission buildout costs are recovered through SPP regional transmission rates and flow into utility pass-through charges. Buyers should budget for rising transmission components in contracts running into 2027 and beyond, and check for new riders and tariff lines at audit.

    Source: Southwest Power Pool

  8. RegulatoryAlaska (Western markets)

    CAISO files large-load interconnection rules at FERC, with a 50 MW threshold

    On Nov. 16, 2026, CAISO and the other grid operators filed their answers to FERC's show-cause orders on large-load interconnection. CAISO's board approved a framework that sets the large-load line at 50 MW and offers one flexible interim service, so data centers can connect before network upgrades finish.

    Why it matters for buyers: Sites of 50 MW or more in the CAISO/EDAM footprint should watch how interim service and cost responsibility are defined, because they could affect transmission charges and timing for new load. Responses are due Dec. 16, and FERC then decides whether to accept the filing.

    Source: Utility Dive

  9. RatesArizona

    Arizona regulators approve Tucson Electric Power rate increase and yearly formula adjustments in 4-1 vote

    The Arizona Corporation Commission voted 4-1 on Nov. 17 to approve a TEP rate increase of about 9.4%, with a limit on the company's return. TEP can now file annual adjustments until a full rate case in 2032. Commissioners also ordered a cost-of-service study trigger plan for data-center-scale loads.

    Why it matters for buyers: TEP-served sites should expect higher delivery bills and yearly rate changes, so budget for annual adjustments instead of a multi-year freeze. Auditors should check bills against the new tariffs and watch for large-load cost allocation changes.

    Source: Tucson Sentinel

  10. RegulatoryArizona

    ACC hears UNS Gas first annual rate adjustment review ahead of TEP vote; RUCO disputes oversight

    Before the TEP vote on Nov. 17, commissioners took testimony on how UNS Gas's first annual rate adjustment is working. Staff and the utility say it is on track, while RUCO says it could not fully audit the filing. UniSource says the first filing seeks recovery of $41 million of investment.

    Why it matters for buyers: UNS Gas transportation and delivery customers should plan for annual delivery-rate updates on top of pass-through gas costs. Audit angle: check the new ARAM rider alongside the PGA, LFCR and DSM riders on gas bills.

    Source: Arizona Capitol Times

  11. GridGeorgia

    Effingham County, Georgia approves OpenAI Project Camellia site plan; moratorium tabled to January

    Effingham County commissioners unanimously approved the site plan for OpenAI's Project Camellia on Nov 17, 2026: six data center buildings, two substations and cooling infrastructure on about 1,400 acres of the Savannah Gateway Industrial Hub, the Effingham Herald reports. The plan does not allow construction yet…

    Source: Data Center Index

  12. Gas supplyMissouri

    Spire plans MoGas Pipeline expansion to serve Ameren Missouri's West Alton combined-cycle plant

    Spire announced a precedent agreement to expand its MoGas Pipeline to supply Ameren Missouri's planned West Alton Energy Center gas plant. The deal is a 20-year negotiated-rate agreement, and Ameren Missouri will fund 100% of the project capital.

    Why it matters for buyers: New large gas-fired load on the MoGas system could affect transportation capacity and local supply conditions in the St. Louis area. Gas buyers served off MoGas or nearby Spire East should watch for effects on capacity availability and delivered cost.

    Source: The Motley Fool (Spire Q4 2026 earnings call transcript)

  13. RatesNevada

    NV Energy asks PUCN to cut Southern Nevada electric rates about $203 million a year from Jan. 1

    Nevada Power filed on Nov. 17 to lower its fuel and purchased power charges. If approved, rates fall from Jan. 1, 2027 and annual revenue drops by over $203 million. The typical residential bill would fall about 8%.

    Why it matters for buyers: This is a pass-through energy charge, so lower fuel and purchased power costs reach customers on variable and utility-supply bills. Budget for a lower Q1 2027 utility energy line, and check each rate class's adjustment on your January bills.

    Source: Las Vegas Review-Journal

  14. RatesNevada

    NV Energy files Northern Nevada electric and gas rate cuts for Jan. 1 on lower fuel and gas supply costs

    Sierra Pacific Power's Nov. 17 filing with the PUCN proposes lower electric rates and lower natural gas rates from Jan. 1. A typical residential customer would see about 2.66% off the electric bill and 4.87% off the gas bill. The company says the cuts reflect fuel, purchased power and gas supply costs.

    Why it matters for buyers: Gas supply costs are passed through, so northern sites on utility sales service could see lower gas commodity charges in Q1 2027. Transportation customers buying their own gas are not affected by this. Check each rate class's actual change in the tariff sheets.

    Source: KOLO 8 News Now

  15. RegulatoryNorth Carolina

    NCUC approves Duke Carolinas resource plan: 3,841 MW of new gas, some coal retirements delayed to 2040

    NCUC approved near-term actions in Duke Energy's Carbon Plan and Integrated Resource Plan. The order adds 3,841 MW of gas generation between 2030 and 2033 and delays some coal retirements until 2040. It also adds solar, batteries and nuclear development work. Duke's next plan is due in fall 2027.

    Why it matters for buyers: The plan sets the generation build that future Duke rates will recover, so long-term budgets should assume continued increases. New gas plants also add to utility gas demand in the Carolinas, which bears on Transco Zone 5 South basis.

    Source: Axios Raleigh

  16. RegulatoryVirginia

    Virginia SCC opens hearing on $67 billion Dominion-NextEra merger, with rate-freeze conditions in dispute

    The State Corporation Commission began evidentiary hearings on Nov. 17 on NextEra's proposed purchase of Dominion Energy. SCC staff recommend rejecting the deal as filed. The governor wants a six-year freeze on residential base rates. Amazon said it would give up the bill credits proposed for GS-5 customers.

    Why it matters for buyers: The merger conditions could shape Dominion's base rates, riders and large-load (GS-5) terms in the coming years. Buyers on Dominion service should budget for the outcome. The SCC's presumed deadline for a final order is Jan. 11, 2027.

    Source: WTVR

  17. GridVirginia

    Loudoun County, Virginia supervisors approve a 12-month pause on data center applications

    Loudoun County's Board of Supervisors voted 7-1-1 on Nov 17, 2026 to stop acting on legislative data center and substation applications (rezonings and special exceptions) for 12 months, counted from Sept 15, while it finishes Phase Two of its data center zoning standards, Loudoun Now reports. Staff will keep accepting…

    Source: Data Center Index

  18. RegulatoryWashington

    Washington appeals court largely upholds UTC order letting PSE recover LNG facility costs in gas rates

    On Nov. 17 a Washington appeals panel largely upheld the UTC order that lets Puget Sound Energy raise rates to recover tens of millions of dollars spent building a liquefied natural gas facility. The panel mostly rejected the Puyallup Tribe's and other objectors' arguments.

    Why it matters for buyers: PSE gas customers, including transportation-service customers, should expect the LNG cost recovery to stay in rates. Audit angle: check that the related charges on PSE gas bills match the approved tariff.

    Source: Law360

  19. RatesWest Virginia

    West Virginia PSC approves Mon Power, Potomac Edison 1,200 MW gas plant and a financing surcharge

    On Nov. 17 the PSC approved a roughly $2.48 billion, 1,200 MW gas plant at Fort Martin, plus $182 million of solar projects. It also approved a surcharge that starts around 0.9%, about $1 a month on a residential bill. The surcharge runs until the costs move into base rates.

    Why it matters for buyers: Mon Power and Potomac Edison commercial and industrial accounts should budget for a new pass-through charge ahead of the plant's late-2031 start. Auditors should check for a new surcharge line on bills.

    Source: WV MetroNews

  20. RatesConnecticut

    Connecticut Natural Gas and Southern Connecticut Gas seek $256 million in rate increases over two years

    The two Avangrid gas utilities told PURA they want to raise rates by a combined $256 million over two years, a rise of more than 20% in revenue. Year one asks are $86 million for Connecticut Natural Gas (about 19%) and $127 million for Southern Connecticut Gas (about 25%). The Attorney General has urged PURA to reject the request.

    Why it matters for buyers: Firm-service delivery charges for commercial gas customers in these two territories could rise, so build the possible increase into FY2027–28 budgets. Audit angle: if the case is approved, check the new rate-class charges and any riders on your bills.

    Source: CT Mirror

  21. GridConnecticut (ISO New England)

    ISO New England expects enough supply this winter, with more stored fuel and new resources

    ISO New England said it expects sufficient resources to meet demand this winter, with stored fuel slightly above last year, more offshore wind and a full winter of the New England Clean Energy Connect line, and noted that wholesale costs are about a third of a retail bill.

    Why it matters for buyers: Winter remains New England's high-price season because gas for heating and power competes for pipeline space. Fixed-price contracts should be compared on their winter months, not the annual average.

    Source: American Public Power Association (ISO New England)

  22. GridIllinois (PJM)

    PJM files ride-through rules at FERC for data centers and other loads of 50 MW or more

    On Nov. 16 PJM filed a proposal with FERC creating a Large Computational Load category for sites of 50 MW or more. These loads would have to stay connected during voltage and frequency disturbances. The filing follows a July 22 event in which about 3.9 GW of data center load dropped off the grid.

    Why it matters for buyers: New technical conditions may attach to interconnection and service for large sites. Buyers with data center or other large computational load should check them against site plans and utility service agreements before signing new capacity or supply commitments.

    Source: PJM Inside Lines

  23. RegulatoryIllinois (MISO)

    MISO files FERC large-load plan with new transmission service options and anti-cost-shift agreements

    On Nov. 16, MISO filed its response to FERC's large-load show-cause order. It includes a Large Load Project Review process, new transmission service options, and standard cost-recovery agreements. A separate filing proposes Grid Responsive Integration Transmission Service for large loads that can curtail at certain price and reliability conditions.

    Why it matters for buyers: Sites above 50 MW, such as data centers and big plants, may face new interconnection steps and a curtailable service option that changes what they pay. Buyers with expansion plans should track the FERC ruling before signing supply or service terms.

    Source: Utility Dive (via Yahoo News)

  24. GridNew York (NYISO)

    NYISO winter assessment: enough capacity for 2026-27, but gas fuel supply in extreme cold is the risk

    NYISO's 2026-27 Winter Assessment finds 29,464 MW of resources against a forecast peak of 24,620 MW. NYISO warns that fuel availability could be a problem in prolonged cold, when gas supplies tighten, as they did in Winter Storm Fern.

    Why it matters for buyers: Buyers on index or pass-through supply in New York should budget for price spikes in cold snaps, and fixed-price quotes may carry a risk premium. Gas-constrained days are when energy prices and gas basis move most.

    Source: Daily Energy Insider (citing NYISO)

04 / 05

One procurement across many states

A company with sites in several states usually has contracts in some, default service in others, and gas on utility supply where it could be transporting. Discovery starts from one inventory of every account, runs the multi-state electricity RFP and the natural gas procurement on it, and audits the bills in every state, including the regulated ones (see utility bill audits). The rules by state are summarized in deregulated electricity and natural gas states.

Discovery Energy acts as an energy broker in its procurement work; its energy broker licenses and registrations are held by Energy Auction Exchange, LLC.

05 / 05

Questions about energy procurement by state

Which states let businesses choose their electricity supplier?

13 states and the District of Columbia offer broad choice to commercial and industrial customers of their investor-owned utilities: Connecticut, Delaware, District of Columbia, Illinois, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Ohio, Pennsylvania, Rhode Island, Texas. California, Michigan, Montana, Nevada, Oregon, Virginia allow limited choice (caps, size thresholds or exit approval).

In which states can a business buy natural gas from a marketer?

In almost every state. Choice programs reach small businesses in states such as Georgia, New York, Ohio, Pennsylvania and Illinois, and larger commercial and industrial users can take the utility's transportation service and buy from a marketer nearly everywhere. Hawaii is the exception.

What is energy procurement?

Buying electricity and natural gas supply on purpose rather than by default: deciding when to buy, for how long, on what price structure (fixed, index, block and index, layered) and with which charges fixed or passed through, then tracking each contract to renewal. People also call it electricity contracting, energy sourcing, or buying natural gas.

How often are the state pages updated?

Every Saturday. Each state page carries a market and regulatory feed: rate cases, commission orders, grid operator decisions, legislation and Discovery's own research that affect electricity and natural gas prices in that state.