A supply price only means something next to its structure: which parts are fixed, which follow the market and which are passed through at cost. Two offers with the same headline rate can produce very different bills.

Contract structures at a glance
StructureWhat's fixedWhat movesBudget certaintyFits best
Fixed priceThe supply price for the termUsage outside the bandwidth, and any charges the contract passes throughHighTight budgets and predictable load
Fixed with pass-throughsThe energy priceNamed charges such as capacity, transmission or ancillary services, billed at costMedium to highBuyers who would rather not pay a supplier to carry charges they can manage
IndexThe supplier's adderThe energy price, which follows the wholesale marketLowFlexible budgets, or load that can move away from high-price hours
Block and indexA block of energy, usually covering baseloadUsage above or below the block, at indexMediumSteady baseload with a variable top
Layered buyingEach layer, at the price on the day it was boughtLayers not yet boughtBuilds over timeLarge loads with a long planning horizon
Natural gas: NYMEX and basisThe NYMEX price, the basis, or bothWhichever part isn't fixed, plus swing volumesDepends on what is fixedGas buyers who want to lock the two parts at different times

Names vary by supplier and market. Read what the contract fixes, not what the product is called.

Same word, different contract

Procurement vocabulary is not standardized. The same word can describe very different risk depending on the supplier, the market and the contract template. Before comparing offers, pin down what each of these terms means in each offer.

Terms that change meaning between suppliers
TermWhat it can meanWhat to ask
FixedEnergy only; energy plus capacity and transmission; or every supply-side charge except new charges added under a change-in-law clauseWhich charges are inside the price, listed by name?
All-inUsually every supply-side charge, but never the utility's delivery charges, and often not regulatory changes after signingWhat is excluded, and who pays for changes in law?
Pass-through (flow-through, at cost)Billed at the supplier's actual cost, with or without a margin, settled monthly or trued up laterIs any margin added, and how and when is it trued up?
Index, variable or marketAn hourly day-ahead or real-time wholesale price at a zone, hub or node; or a monthly rate the supplier sets that follows no published indexWhich index, at which location, hourly or monthly?
AdderSupplier margin only, or margin plus capacity, ancillary services, losses and feesExactly what the adder covers
BlockA fixed number of megawatts in a standard shape, or a fixed percentage of each hour's usageMW or percent, which shape, and how unused energy is settled
Bandwidth, swing or toleranceThe usage range the price assumes; usage outside it is priced at market or charged a feeHow wide, measured monthly or annually, and settled how?
Load-followingThe fixed price applies to whatever you use, with no bandwidth; sometimes with a bandwidth anywayIs there any volume limit at all?
Heat rateAn electricity price tied to a natural gas index times an agreed heat rateWhich gas index and which heat rate?

Which charges sit inside a price also depends on the market. Capacity, transmission and ancillary services are set differently in PJM, ERCOT, NYISO, ISO-NE, MISO and CAISO, and some are billed by the utility rather than the supplier. See how charges are split by market.

Choosing a structure

Four questions decide most of it:

  1. How much variance in the energy budget can finance accept?
  2. How predictable is the load, month to month and year to year?
  3. How long will the site run as it does today?
  4. Who will watch the market and act on it during the term?

A plant with steady load and a tight budget leans fixed or block and index. A large portfolio with a planning team can layer. A site that can move load away from high-price hours can carry more index. A site that may close or expand should look hardest at bandwidth and add-and-drop terms; see utility accounts when sites change.

One competitive RFP, one New Jersey account$167,000 a month

in average savings for a multi-state renewable natural gas producer, whose major purchases now go to competing suppliers with pricing shown side by side. Read the case study.

How Discovery runs procurement

Discovery runs competitive electricity and natural gas RFPs in deregulated markets. Every offer is put on the same terms and shown side by side in each structure that fits the site, timed with our monthly buy or wait guidance. Contracts are tracked in TaraBase through to renewal.

Procurement is paid by a fixed monthly fee or a supplier-paid commission, disclosed in advance. Audits can be bought on their own, with no procurement. See independence and compensation.

Frequently asked questions

Is a fixed-price contract always fixed?

The energy price is, but many fixed contracts pass some charges through at cost, and most bill usage outside an agreed band differently. Utility delivery charges are always separate.

What is block and index pricing?

A contract that fixes the price on a set block of energy, usually the site's baseload, and bills everything above or below the block at the wholesale index price plus an adder.

What is basis in a natural gas contract?

The difference between the NYMEX Henry Hub price and the price at your delivery point. A delivered gas price is NYMEX plus basis, and each can be fixed separately.

Which structure does Discovery recommend?

It depends on the site's load and how much budget variance the client can accept. We show offers in each structure that fits, side by side on the same terms, with our current buy or wait view. The client decides.

How is Discovery paid for procurement?

By a fixed monthly fee or a supplier-paid commission, disclosed before any contract is signed.

Have a contract coming up for renewal?

Send the current contract and a recent bill. We show what each structure would cost today, on the same terms, before you commit to anything.