Request a bill review

Texas natural gas case study, Houston, Texas. November 2026

Houston gas capacity: reserve shrinking, two pipeline contracts end in 2027

CenterPoint told the Railroad Commission of Texas in October 2023 that its Houston-Texas Coast reserve was 9.0% of its design hour estimate and would fall each year, to 0.8% by January 2027 by our calculation, with no approved fix.

9.0%CenterPoint's stated 2023 reserve capacity, as a share of its Houston-Texas Coast design hour estimate
0.8%January 2027 reserve as a share of design hour, if contracted capacity stays flat; calculated from CenterPoint figures
33.9%Houston Pipeline capacity as a share of CenterPoint's January 2023 design day; calculated from CenterPoint figures
3Planned natural gas-fired generators in the ten metro counties in EIA's September 2026 inventory

Metro used: the Houston-Pasadena-The Woodlands, TX metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023), ten counties listed in the notes. CenterPoint Energy Resources Corp. d/b/a CenterPoint Energy Entex and CenterPoint Energy Texas Gas (CenterPoint) lists customers across them, and its Houston and Texas Coast divisions are the record this page rests on. Figures that cover all its Texas divisions are labeled system-wide.1

Key takeaways

  • CenterPoint said in October 2023 that its Houston-Texas Coast reserve capacity is forecast to decrease each year as it adds customers and loads.3
  • CenterPoint projects a design hour requirement of 2,279,215 Dth in January 2027, up from 2,107,310 Dth in 2023, leaving an 18,204 Dth reserve if capacity holds, by our calculation.3
  • CenterPoint's all-Texas table prints a 4.2% reserve for January 2026 and gives 2.4% for January 2027 by our calculation.4
  • CenterPoint's Houston Pipeline contract (618,603 Dth per day) ends March 31, 2027 and its Gulf South agreements April 30, 2027, with no replacement shown.5
  • CenterPoint's five propane-air peak shaving facilities, 55,000 MMBtu per day, were deployed in Winter Storm Elliott in December 2022; no shortfall is described.6
  • All three planned generators are for 2028; no record we reviewed ties them to a data center or CenterPoint's pipelines.10

What is the outlook for Houston gas capacity through 2029?

Discovery Energy rates the outlook for Houston-area natural gas capacity through 2029 as Elevated (confidence: Medium): CenterPoint said in October 2023 that its Houston-Texas Coast reserve was 9.0% of its design hour estimate and would decrease each year, and by our calculation it would be thin by January 2027 if contracted capacity stays flat.3 For all its Texas divisions, its table prints a 4.2% reserve for January 2026.4 The record we reviewed shows no approved or scheduled fix, although CenterPoint said its reserved capacity is adequate to meet forecast design day demand.

Documented risk factors: expiring supply. The Houston Pipeline contract, 33.9% of the January 2023 design day by our calculation, ends March 31, 2027, and the Gulf South agreements, 40.6% of interstate capacity by our calculation, end April 30, 2027, with no replacement shown. We did not count concentration as a risk, because CenterPoint's supply is spread across contracts with thirteen pipeline companies.

Three developments would change the assessment: CenterPoint's next gas procurement plan or rate case showing contracted capacity against design hour through 2029, including what replaces the two contracts; any filing that adds pipeline, storage or peaking capacity with a date and a budget; any filing that ties Greens Bayou 6, Cedar Bayou 5 or Lone Star to the pipelines serving CenterPoint.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Houston area?

CenterPoint's filing lists its customers by place for the test year ended June 2023, in a Houston Division and a Texas Coast Division that include Bellaire, Sugar Land, Pearland and Baytown. The 87 place rows hold 1,519,858 customers; USGS place names put 52.3% in a metro county, 0.4% unresolved or ambiguous, and 47.1% in unincorporated "environs" rows that name no county. The remaining 0.2% are in places such as Wharton and East Bernard, which are not in the metro.1

CenterPoint's witness said it operates five propane-air peak shaving facilities in the Houston Metro area and has transportation contracts with thirteen pipeline companies and five gas storage contracts there. Texas Gas Service lists Galveston among the incorporated areas of its Central-Gulf Service Area, and the Index's utility crosswalk names other, smaller gas systems; the record we reviewed has no capacity figure for any of them.1

Where Item in the record
Inside the metro CenterPoint's Houston and Texas Coast division places named in Harris, Fort Bend, Brazoria, Montgomery and Galveston counties; the Houston-Texas Coast design day, design hour and reserve figures
Outside the metro, system-wide CenterPoint's all-Texas capacity table and procurement plan; its Beaumont-East Texas and South Texas divisions and places such as Wharton and East Bernard; the Kilby Power Plant air permit in Reeves County
Unclear The 47.1% of customers in environs rows with no county; the five propane-air sites "in the Houston Metro area", whose counties are not known; Texas Gas Service's share of Galveston County and the smaller gas systems named in the Index crosswalk

Record items sorted by whether they fall inside the metro. Sources: CenterPoint Statement of Intent (October 2023), Exhibit B and testimony; USGS place names; Texas Gas Service Statement of Intent (June 2025).1

This is enough to identify CenterPoint's Houston and Texas Coast divisions as the serving utility record for the metro, with three gaps: the environs customers, the county of each propane-air site, and any capacity figure for Texas Gas Service and the smaller gas systems.1 Where Houston figures exist this page uses them, and it says so where it uses CenterPoint's statewide table, which covers all its Texas divisions.4

Has Houston had gas supply problems since 2020?

The filing documents no dated shortfall, emergency appeal or curtailment. CenterPoint's witness said Winter Storms Uri (February 2021) and Elliott (December 2022) each affected operations and required the company to monitor pressure, and that it deployed its propane-air facilities during Elliott. During Uri, he said, it did not experience design day or peak demand conditions, because electric outages reduced gas use, and the facilities were not deployed. These are company statements.6

In May 2026 the federal pipeline safety agency ordered Gulf South, whose agreements with CenterPoint are extended to April 30, 2027, to cut operating pressure by 20% along an affected segment of its 266 loop line after a rupture near Choudrant, Louisiana. The order names no Texas delivery point, and CenterPoint's October 2023 filing predates it.14

How much spare gas capacity does Houston have on the coldest day?

Pipelines supplying the Houston area N Gulf South Pipeline Gulf South Pipeline Houston Pipeline Houston Pipeline Houston Pipeline Houston Pipeline Kinder Morgan Texas Pipeline Kinder Morgan Texas Pipeline Kinder Morgan Texas Pipeline Kinder Morgan Texas Pipeline Houston Pipeline Houston Pipeline Tennessee Gas Pipeline Tennessee Gas Pipeline Cedar Bayou Cedar Bayou Greens Bayou Greens Bayou Houston Houston Pasadena Pasadena Pearland Pearland League City League City Conroe Conroe Sugar Land Sugar Land Austin Co. Austin Co. Brazoria County Brazoria County Chambers Co. Chambers Co. Galveston Co. Galveston Co. Harris Co. Harris Co. Liberty County Liberty County Montgomery Co. Montgomery Co. San Jacinto Co. San Jacinto Co. Waller Co. Waller Co. College Station College Station Beaumont Beaumont Victoria Victoria I-10 I-10 I-45 US-59 Matagorda Co. Matagorda Co. Pipelines supplying the Houston area Other gas pipelines Highways Houston metro area (10 counties) County lines Cities and towns Gas-fired power plant named on this page
Figure 1. Major natural gas pipelines serving Houston. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Form EIA-860 (2025). Counties, places, state outline and population: U.S. Census Bureau. Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Tennessee Gas Pipeline; Gulf South Pipeline; Houston Pipeline; Kinder Morgan Texas Pipeline.
  • Gas-fired power plants marked: Cedar Bayou; Greens Bayou.
  • Metro counties outlined (10): Austin County; Brazoria County; Chambers County; Fort Bend County; Galveston County; Harris County; Liberty County; Montgomery County; San Jacinto County; Waller County.
  • Cities and towns labeled include: Houston; Pasadena; Pearland; College Station; League City; Conroe; Beaumont; Sugar Land.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

CenterPoint sizes its pipeline capacity to a design hour requirement based on 54 heating degree days, which it described as the coldest hour temperature expected once every 30 years; its design day for January 2022 sales customers was 1,789,754 Dth per day at 47 heating degree days. CenterPoint said its 2023 reserve for Houston-Texas Coast is 190,109 Dth and that reserve capacity is forecast to decrease each year.3

The reserve column below is our calculation, not a CenterPoint figure:

January Design day (Dth) Design hour (Dth) Reserve if capacity stays at 2,297,419 Dth, share of design hour
2023 1,826,022 2,107,310 9.0% (stated: 190,109 Dth)
2024 1,862,675 2,149,610 6.9%
2025 1,900,178 2,192,890 4.8%
2026 1,937,573 2,236,046 2.7%
2027 1,974,980 2,279,215 0.8%

CenterPoint's projected January design day and design hour requirement, Houston-Texas Coast division (Exhibit BW-2). The reserve column is our calculation: 2,297,419 (the 2023 design hour plus the stated 190,109 Dth reserve) minus each year's design hour, divided by that design hour. It is illustrative, because the filing does not say contracted capacity stays unchanged.3

CenterPoint's separate figure for the Houston Metro area in its 2023 Plan shows upstream pipeline capacity of 2,259,428 Dth per day, of which 166,763 Dth per day (7.4%) is on interstate pipelines and the rest on intrastate pipelines. The two filings' capacity bases differ, so the table uses only the reserve CenterPoint stated.2

For all its Texas divisions, CenterPoint's summary says total transportation capacity reserved on each pipeline is adequate to meet forecast design day demand. Its table for all divisions shows total system capacity of 2,802,351 Dth against a forecast design day of 2,548,977 Dth and a reserve of 253,374 Dth in January 2023, a percent reserve of 4.2% in January 2026 and a reserve of 64,858 Dth in January 2027, 2.4% of the forecast design day by our calculation. CenterPoint said statewide reserve capacity declines over the next several years.4

The Commission's June 2024 final order makes no finding on capacity, and CenterPoint's filing is the utility's own account.7

What is driving new natural gas demand?

CenterPoint's reserve forecast attributes the decline to adding customers and loads.3 We found no pipeline filing that names a new gas load in the ten counties.

EIA's September 2026 inventory lists three planned natural gas-fired generators in the metro counties: Greens Bayou 6 in Harris County (447.0 MW, under construction, planned May 2028), Lone Star Power Station in San Jacinto County (467.3 MW, regulatory approvals pending, planned July 2028) and Cedar Bayou 5 in Chambers County (721.0 MW, under construction, planned August 2028). All three are electric generators, and EIA names no gas supplier for any of them.10

A Commission filing and Entergy Texas's own page put Lone Star at 453 MW and say the Commission approved it in September 2025, and a TCEQ air permit notice places it near Cleveland in Liberty County, also a metro county.11 No filing we reviewed says which pipelines serve the three plants, so we do not know whether they would draw on CenterPoint's system or a pipeline that bypasses it. EIA also lists a planned June 2034 retirement of Entergy Texas's Lewis Creek gas steam units in Montgomery County, 271.4 MW each; they are electric units.10

Data centers: As of October 29, 2026 we found no data center gas load on CenterPoint's system or bypassing it in the ten counties; none of the three generators is tied to a data center in the records we reviewed.11 Our Federal Register search since January 1, 2025 found ten notices of the Federal Energy Regulatory Commission (FERC) that name a metro county for pipeline, storage or LNG projects; none ties a project to a data center or to CenterPoint.17 TCEQ's pending air permit page named none of the ten counties when we reviewed it; its one power plant application, the Kilby Power Plant, is in Reeves County, not in the metro.9

In the metro counties, not tied to CenterPoint: Since July 31, 2026, FERC notices name San Jacinto County in Gulf South's Texas Gateway Project, which does not name CenterPoint or a data center (see "What's new").12 A Tennessee Gas Pipeline pressure filing in the same period names Harris County and no shipper.13 Earlier notices name Harris County for a Transco request of April 15, 2026 to add three delivery meter stations and 115,000 Dth per day of firm capacity, with no shipper or load named, and Brazoria and Liberty Counties for LNG export projects.17

Are upgrades arriving in time?

The record we reviewed shows no capacity addition for CenterPoint with a date and a budget. CenterPoint said a team of its employees is studying each service area and will recommend either seeking additional pipeline capacity or rebalancing contracted capacities.4 Its propane-air facilities, 55,000 MMBtu per day in total, are already counted in its capacity and were described as ready to deploy.6

Two large contracts end within the three heating seasons ahead. CenterPoint said its contract with Houston Pipeline runs May 1, 2022 through March 31, 2027, and that in April 2022 it exercised its right of first refusal on all Gulf South agreements and extended them until April 30, 2027.5

By our calculation, Houston Pipeline's 618,603 Dth per day in the 2023 Plan is 33.9% of the January 2023 design day of 1,826,022 Dth (Houston Pipeline is an intrastate pipeline). Gulf South's 67,763 Dth per day is 3.7% of the design day and 40.6% of the 166,763 Dth per day of interstate capacity. Its Kinder Morgan contracts run to March 31, 2032, beyond the window.5

The filing shows no replacement for the 2027 contracts; it was filed in October 2023, and a later renewal would not appear in it.

What does this mean for business gas costs?

The record gives no cost figure for capacity by customer class, so none is given here. The Commission's June 2024 final order sets base rate revenue allocation factors for spreading any change in its interim rate adjustment among customer classes: Residential 88.5238%, General Service-Small 2.4027% and General Service-Large 9.0735%. Who bears the cost of any future capacity addition is not decided in the record we reviewed.7

Who gets gas first in a shortage?

CenterPoint said about 95% of its sales customers in Houston Gulf Coast are residential and most of the remaining 5% are small commercial and industrial human needs customers; it does not sell gas to large volume customers that could be curtailed, so it buys pipeline services sized to the greatest expected daily and hourly flow. Its proposed large volume tariff says gas taken after a curtailment order beyond the stated amount is unauthorized over-run gas billed at $10.00 per Mcf in addition to the monthly rate. The tariff pages we reviewed state no priority sequence among classes.8

Winter and market context

NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 outlook gives the highest odds of warmer than normal conditions to Southeast Alaska, the upper Mississippi Valley and the Great Lakes, a discussion that names regions and not Texas counties.B1 The U.S. Energy Information Administration said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average.A1

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran well below the 1991-2020 normal at the Houston Intercontinental Airport station in each of the last three winters.15 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives equal chances, 33.3% each, of above, near and below normal temperatures for the Houston area for November 2026 to January 2027 and for December 2026 to February 2027.16 The airport is one station standing in for the metro, and NOAA's figures are probabilities for a three-month average.16

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 1,034 1,207 -14.3%
2024-25 953 1,207 -21.0%
2025-26 829 1,207 -31.3%

Heating degree days, base 65 F, November to March, at Houston Intercontinental Airport, against the 1991-2020 normal (NOAA Regional Climate Centers).15

What's new (as of October 29, 2026)

On October 16, 2026 FERC published a scoping notice for Gulf South's Texas Gateway Project, which would add a compressor station in San Jacinto County and carry about 1.8 billion cubic feet per day from Carthage, Texas toward southeast Texas and southwest Louisiana, with a final order due December 16, 2027; it does not name CenterPoint.12 On October 1, 2026 Tennessee Gas Pipeline asked FERC to lower the pressure of a 1.9-mile line to a Harris County delivery point to 750 psig, down from 1,440.13

What should Houston-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which utility, and which supply arrangement. Confirm whether each site is served by CenterPoint, Texas Gas Service or another gas system, and whether gas is bought from the utility or from a third-party supplier.
  • Your curtailment terms. Check each account's service class, contract maximum daily quantity and the over-run charge that applies after a curtailment order in the tariff.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track CenterPoint's next gas procurement plan or rate case, and what replaces the Houston Pipeline and Gulf South contracts after spring 2027.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Houston businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does Houston have on the coldest day?'

Does CenterPoint have enough capacity for its coldest hour?

Its stated 2023 reserve is forecast to shrink each year, and by our calculation it would be 0.8% of the design hour in January 2027 if capacity is unchanged. That is below the 5% the scale treats as thin, with no fix shown, so the outlook is Elevated. See 'What is the outlook for Houston gas capacity through 2029?'

Which large contracts end soon?

CenterPoint's Houston Pipeline contract runs through March 31, 2027 and its Gulf South agreements through April 30, 2027, with no replacement shown in a filing that predates any renewal. See 'Are upgrades arriving in time?'

Which gas utility serves the Houston area?

CenterPoint lists customers in places across the metro counties, and Texas Gas Service names Galveston. Check your bill or ask the utility which one serves a site. See 'Who serves the Houston area?'

Who is cut off first if gas is short?

CenterPoint said it does not sell gas to large volume customers that could be curtailed, and about 95% of its sales customers are residential. Its tariff pages we reviewed give an over-run charge of $10.00 per Mcf but no priority sequence. See 'Who gets gas first in a shortage?'

Is new gas-fired power adding gas demand in the metro?

EIA lists three planned gas-fired generators in the metro counties for 2028; none is tied to a data center or to CenterPoint's pipelines in any record we reviewed. See 'What is driving new natural gas demand?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Dated supply events since 2020 other than the Winter Storm Elliott deployment.
  • Planned power plants and data center projects by county. The ERCOT interconnection queue report by county was not available to us, and we found no official filing source for approved data center projects.
  • CenterPoint's plan after its October 2023 filing.
  • Gas capacity for Texas Gas Service or the smaller gas systems in the metro, and the order in which customers would be curtailed.
  • Which county each propane-air site is in.

Notes

  1. CenterPoint Energy Resources Corp. d/b/a CenterPoint Energy Entex and CenterPoint Energy Texas Gas, Statement of Intent in RRC Case OS-23-00015513 (filed October 30, 2023), Exhibit B customer counts by place (PDF 88, 89) and Wagaman direct testimony (PDF 1027, 1028); place-to-county matching from USGS GNIS Domestic Names, Texas; Texas Gas Service Statement of Intent in OS-25-00028202 (June 30, 2025), tariff territory (PDF 298). Utility filings. The ten metro counties are Austin, Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, San Jacinto and Waller. The customer shares by place are illustrative. ↩
  2. Same filing, Wagaman testimony, Figure 1, Houston Metro Area Upstream Capacities, 2023 Plan (PDF 1029). Utility statement. ↩
  3. Same filing, Exhibit BW-2 (gas procurement plan excerpts), Houston-Texas Coast section (PDF 1107 to 1111). Utility statements. ↩
  4. Same filing, Exhibit BW-2, Texas overview (PDF 1094): summary, consolidated table for all Texas divisions (a table image, compared with the text read from it) and statements on adding capacity. Utility statements, system-wide. ↩
  5. Same filing, Exhibit BW-2, upstream pipeline services (PDF 1110): contract terms. Utility statements. ↩
  6. Same filing, Wagaman testimony on propane-air peak shaving and winter storms (PDF 1038, 1042, 123). Utility statements. ↩
  7. Railroad Commission of Texas, Final Order and hearings letter in OS-23-00015513 (June 25, 2024), PDF 1 and 9 (scanned; compared with the text read from the scan). A Commission order; it makes no capacity finding. ↩
  8. Same filing, Exhibit BW-2 (PDF 1112) and the proposed large volume tariff (PDF 34). Utility statements and tariff. ↩
  9. EIA-860M inventory for September 2026 (Planned sheet), filtered to the ten metro counties; Federal Register API search of FERC notices since January 2025 by county phrase; TCEQ pending air permit applications page and the TCEQ notice for the Kilby Power Plant, with our calculations. A notice that spells a place differently would be missed. ↩
  10. EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026: Planned sheet, rows for Cedar Bayou 5 (Chambers County, Cedar Bayou 5 LLC, combined cycle, 721 MW, ERCOT), Greens Bayou 6 (Harris County, NRG Greens Bayou 6 LLC, combustion turbine, 447 MW, ERCOT) and Lone Star Power Station (San Jacinto County, Entergy Texas Inc., combustion turbine, 467.3 MW, MISO); Operating sheet, Lewis Creek (Montgomery County, Entergy Texas Inc., two natural gas steam units of 271.4 MW, planned retirement June 2034). Federal data. ↩
  11. Public Utility Commission of Texas, Docket 56693 (SOAH 473-24-21530), Entergy Texas application, Interchange item 427 (filed June 30, 2025), PDF 11 (453 MW simple-cycle combustion turbine in San Jacinto County, first planned for Liberty County); Entergy Texas, Texas STEP Ahead, Step 3 (company web page, read October 29, 2026); Texas Commission on Environmental Quality, plain language summary for air permit 177473/N316, PDF 1 (undated). The county differs between the EIA entry and the TCEQ notice. ↩
  12. Federal Energy Regulatory Commission, Docket CP26-547-000, Gulf South Pipeline Company, LLC, Texas Gateway Project: notice of intent to prepare an environmental impact statement, Federal Register 2026-17632 (August 28, 2026), 91 FR 55573 to 55576, project summary and schedule; notice of scoping period, Federal Register 2026-21191 (October 16, 2026), 91 FR 65742. Gulf South is one of CenterPoint's interstate suppliers (note 5). ↩
  13. Federal Energy Regulatory Commission, Docket CP27-2-000, Tennessee Gas Pipeline Company, L.L.C., notice of request under blanket authorization, Federal Register 2026-21075 (October 15, 2026), 91 FR 65545, first paragraph; the filing was made October 1, 2026. It is a voluntary reduction, not a corrective order, and names no shipper. The request cites efficiency and no construction. ↩
  14. U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, Corrective Action Order, Gulf South Pipeline Company, LLC, CPF No. 3-2026-020-CAO (file dated May 16, 2026; the cover letter reads May 1, 2026), PDF 2 (rupture of May 14, 2026 near Choudrant, Louisiana) and PDF 5 (required 20 percent pressure reduction, with removal on written request). We did not establish whether the restriction has been lifted. ↩
  15. NOAA Regional Climate Centers, ACIS station data for Houston Intercontinental Airport (USW00012960), monthly heating degree days, base 65 F, November to March, against 1991-2020 normals (data accessed October 29, 2026). Federal data. ↩
  16. NOAA Climate Prediction Center, seasonal temperature outlooks issued October 15, 2026, Houston area, with CPC's explanation of its probability categories. Federal data. ↩
  17. Federal Register, Federal Energy Regulatory Commission notices that name Brazoria, Harris, Liberty and San Jacinto Counties, Texas, found by our search of notices since January 1, 2025 for county names in the singular and the plural; we saved the text of each notice. (a) Freeport LNG Development, L.P., FLNG Liquefaction 4, LLC; Notice of Request for Extension of Time, document 2025-12259, published July 1, 2025, 90 FR 28736 to 28737 (docket CP17-470-004): Freeport LNG's request of June 18, 2025 for a 40-month extension, until December 1, 2031, to build and place in service its Train 4 Project at the LNG export terminal in Brazoria County. (b) Freeport LNG Development, L.P.; Notice of Motion To Vacate Certificate in Part, document 2026-07908, published April 23, 2026, 91 FR 21806 to 21807 (docket CP03-75-000): Freeport LNG's motion of April 6, 2026 to vacate in part its 2004 authorization so that regasification facilities no longer in use at its Quintana Island import terminal in Brazoria County can be decommissioned, disconnected and removed. (c) Freeport LNG Development, L.P.; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Regasification Terminal Disconnect Project, document 2026-13772, published July 8, 2026, 91 FR 42190 to 42192 (docket CP03-75-000): notice opening environmental scoping for Freeport LNG's Regasification Terminal Disconnect Project, the removal of facilities on Quintana Island in Brazoria County. (d) Freeport LNG Development, L.P.; FLNG Liquefaction, LLC; FLNG Liquefaction 2, LLC; FLNG Liquefaction 3, LLC; Notice of Application and Establishing Intervention Deadline, document 2026-15040, published July 24, 2026, 91 FR 46781 to 46783 (docket CP26-551-000; PF26-12-000): Freeport LNG's application of July 7, 2026 to raise the maximum hourly LNG production rate at its liquefaction project in Brazoria County from about 33.6 to 35 million standard cubic feet per hour within existing equipment, with no increase in the authorized annual LNG production capacity. (e) Transcontinental Gas Pipe Line Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, document 2026-08457, published April 30, 2026, 91 FR 23260 to 23261 (docket CP26-218-000): Transco's prior notice request of April 15, 2026 for its Gillis West Expansion Project: three new delivery meter stations and changes at Station 35 in Harris County, Texas, and a valve site expansion in Louisiana, to provide an incremental 115,000 Dth per day of firm transportation from the Transco mainline in Beauregard Parish, Louisiana to three delivery points in Harris County, at an estimated cost of $28,697,634. (f) Sabine Pass Liquefaction, LLC; Sabine Pass Liquefaction Stage V, LLC; Sabine Crossing, LLC; Cheniere Creole Trail Pipeline, L.P; Notice of Application and Establishing Intervention Deadline, document 2025-11578, published June 24, 2025, 90 FR 26808 to 26810 (docket CP24-75-001): joint application of June 6, 2025 by Sabine Pass, Sabine Crossing and Cheniere Creole Trail for the Sabine Pass Stage 5 Expansion, the Sabine Crossing Pipeline (about 55.6 miles of 48-inch pipeline from the Sabine Pass LNG Terminal across Jefferson County into Liberty County, Texas, with a new compressor station, to deliver up to 2.7 billion cubic feet per day to the terminal) and the Cheniere Expansion. (g) Gulf South Pipeline Company, LLC; Notice of Application and Establishing Intervention Deadline, document 2026-14213, published July 15, 2026, 91 FR 43370 to 43372 (docket CP26-547-000): Gulf South's application of June 26, 2026 for its Texas Gateway Project, a 155-mile greenfield pipeline in east Texas and Louisiana plus compression, including the new Cleveland Compressor Station in San Jacinto County, providing 1,800,000 Dth per day of new firm transportation capacity between the Carthage Compressor Station and the Gillis hub. None names CenterPoint or a data center, and the LNG notices concern export and import terminals and their feed pipelines, not CenterPoint's distribution system; we did not read the applications themselves. Two further notices flagged by our search do not name a metro county: document 2026-19984 (Calhoun and Liberty Counties, Florida) and document 2026-02427 (a public meeting at a Harris County Community Center in Georgia); both are left out. Three more notices that name San Jacinto and Harris Counties are in notes 12 and 14. ↩

Market and weather sources

Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link ↩
  2. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩

Sources

  1. Railroad Commission of Texas, Case OS-23-00015513, CenterPoint Energy Statement of Intent (October 30, 2023), Final Order and hearings letter No. 33 (June 25, 2024). Link
  2. Railroad Commission of Texas, Case OS-25-00028202, Texas Gas Service Company Statement of Intent (June 30, 2025). Link
  3. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  4. U.S. Geological Survey, Geographic Names Information System, Domestic Names, Texas. Link
  5. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  6. Texas Commission on Environmental Quality, pending air permit applications and notice of public meeting for the Kilby Power Plant (June 2026). Link
  7. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  8. Public Utility Commission of Texas, PUC Docket 56693 (SOAH 473-24-21530), Entergy Texas CCN application for dispatchable generation, Interchange item 427 (filed June 30, 2025). Link
  9. Texas Commission on Environmental Quality, Plain Language Summary for New Source Review Initial application, air permit 177473/N316 (Entergy Texas, Lone Star Power Station). Link
  10. Entergy Texas, Inc., Texas STEP Ahead, Step 3: Ensure sufficient 24/7 dispatchable power (company web page). Link
  11. Federal Register (FERC), Gulf South Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Texas Gateway Project (FR Doc 2026-17632, August 28, 2026), Docket CP26-547-000. Link
  12. Federal Register (FERC), Gulf South Pipeline Company, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Texas Gateway Project (FR Doc 2026-21191, October 16, 2026), Docket CP26-547-000. Link
  13. Federal Register (FERC), Tennessee Gas Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization (FR Doc 2026-21075, October 15, 2026), Docket CP27-2-000. Link
  14. U.S. DOT Pipeline and Hazardous Materials Safety Administration, Corrective Action Order, Gulf South Pipeline Company, LLC, CPF No. 3-2026-020-CAO (file dated May 16, 2026). Link
  15. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00012960. Link
  16. Federal Register (FERC notice), Freeport LNG Development, L.P., FLNG Liquefaction 4, LLC; Notice of Request for Extension of Time (FR 2025-12259, July 1, 2025). Link
  17. Federal Register (FERC notice), Freeport LNG Development, L.P.; Notice of Motion To Vacate Certificate in Part (FR 2026-07908, April 23, 2026). Link
  18. Federal Register (FERC notice), Freeport LNG Development, L.P.; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Regasification Terminal Disconnect Project (FR 2026-13772, July 8, 2026). Link
  19. Federal Register (FERC notice), Freeport LNG Development, L.P.; FLNG Liquefaction, LLC; FLNG Liquefaction 2, LLC; FLNG Liquefaction 3, LLC; Notice of Application and Establishing Intervention Deadline (FR 2026-15040, July 24, 2026). Link
  20. Federal Register (FERC notice), Transcontinental Gas Pipe Line Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline (FR 2026-08457, April 30, 2026). Link
  21. Federal Register (FERC notice), Sabine Pass Liquefaction, LLC; Sabine Pass Liquefaction Stage V, LLC; Sabine Crossing, LLC; Cheniere Creole Trail Pipeline, L.P; Notice of Application and Establishing Intervention Deadline (FR 2025-11578, June 24, 2025). Link
  22. Federal Register (FERC notice), Gulf South Pipeline Company, LLC; Notice of Application and Establishing Intervention Deadline (FR 2026-14213, July 15, 2026). Link

Corrected November 9, 2026: the earlier version listed CenterPoint's five propane-air peak shaving sites as inside the metro; the filing does not say which county each is in, so they are now listed as unclear. It also said the record shows no capacity addition with a date and a budget; that now applies to CenterPoint only, because Transco's April 2026 request for 115,000 Dth per day of added firm transportation to three Harris County delivery points states an estimated cost of $28,697,634.