Florida natural gas case study, Miami, Florida. November 2026

Miami-area gas capacity: Florida City Gas says it lacks primary capacity for peak day

Florida City Gas told Florida regulators in April 2026 it lacks sufficient primary firm capacity for its peak design day; a 40,000 Dth per day fix on Florida Gas Transmission's Phase IX is expected in the fourth quarter of 2028.

40,000 Dth per dayAdditional firm capacity Florida City Gas has agreed to acquire on Florida Gas Transmission's Phase IX, company-wide
Q4 2028Expected effective date of Phase IX, per Florida City Gas
1 pipelineInterstate pipelines interconnected with Florida City Gas, per the company
April 2023Month Florida City Gas's Homestead LNG storage facility entered service

Metro used: the Miami-Fort Lauderdale-West Palm Beach, FL metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). The page covers the gas utilities the record names for the area, and where a figure covers a company's whole system, the text says so.1

Key takeaways

  • Florida City Gas relies on secondary capacity at peak, which it called not as reliable as firm capacity; the testimony covers the whole company and gives no shortfall figure.2
  • Secondary capacity is often unavailable in extreme peaks, it said, and Compressor Station 21 constraints limit gas delivered to the market south of it, where most demand sits.2
  • Florida Gas Transmission is the only interstate pipeline interconnected with Florida City Gas.2
  • The planned addition carries primary rights to constrained areas; its effective date is the company's own expectation.3
  • Peoples Gas System lists a Miami service area; the record we reviewed has no peak-day or capacity figure for it, so its spare capacity there is not shown.7

What is the outlook for Miami gas capacity through 2029?

Discovery Energy rates the outlook for Miami-area natural gas capacity through 2029 as Elevated (confidence: Medium): Florida City Gas said in April 2026 that it lacks sufficient primary firm capacity for its peak design day, the coldest day it plans its system to serve, and that it relies on secondary capacity, which is often unavailable in extreme peaks.2 It expects added firm capacity on Florida Gas Transmission's Phase IX in the fourth quarter of 2028.3 The testimony covers the whole company and gives no shortfall figure, and the record has no Peoples peak-day or capacity figures for the metro, so the rating is provisional. Documented risk factors: concentration, meaning one interstate pipeline, Florida Gas Transmission, is the only one interconnected with Florida City Gas. We did not count the Compressor Station 21 constraint as an upstream-limit risk, because the testimony does not name a gate or take station inside the metro that the constraint caps. We also did not count the 2020 federal pipeline-safety order on Florida Gas Transmission as a pressure restriction: it counts only if the restricted pipe carries 10% or more of Florida City Gas's design day or firm capacity, and the record we reviewed gives no such share.17 Three developments would change the assessment: Phase IX's in-service date or any change to the 40,000 Dth per day agreement; the Florida Public Service Commission's order in the rate case and any finding on capacity; a quantified shortfall or design day figure, from the refined design day forecast Florida City Gas said it is developing with a consultant or from Peoples' peak-day figures for its Miami service area, either of which would confirm or change this provisional rating.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Miami area?

Two gas distribution utilities are identified in the record. Florida City Gas (FCG) said its whole system serves 125,000 customers in eight counties, including Miami-Dade, Broward and Palm Beach, the three metro counties, with large concentrations in Miami-Dade County (the City of Hialeah) and in Melbourne in Brevard County, which is outside the metro.1 Its Homestead liquefied natural gas (LNG) facility is in Homestead, Florida; the testimony names no county for it.4 Peoples Gas System (Peoples) lists a Miami service area and a Jupiter service area among its 14.7 Its tariff lists Broward and Miami-Dade among the counties it serves and does not list Palm Beach County.27 Whether Florida Public Utilities Company serves part of the metro is not shown.

Where Item in the record
Inside the metro Florida City Gas in Miami-Dade, Broward and Palm Beach counties; Peoples in Broward and Miami-Dade counties (tariff county list); Florida Gas Transmission's Compressor Station 21 in Palm Beach County, which is part of the supply system and not a delivery point named in the record
Outside the metro, part of the supply system Florida City Gas's Brevard, Hendry, Martin, St. Lucie and Indian River counties; company-wide customer and capacity statements; the two new Phase IX compressor stations in Lake and De Soto Counties
Unclear The county of the Homestead LNG facility; whether any other Phase IX facility is in the metro (the notices name no metro-county facility); Peoples' territory in Palm Beach County and its peak-day or capacity figures; Florida Public Utilities

Florida City Gas source: direct testimony, April 2026.1 Peoples source: direct testimony and tariff, 2025.7

Florida City Gas's capacity statements cover its whole eight-county system; the record allocates none of it to the three metro counties and has no more local figure, so this page uses the company-wide statements. Compressor Station 21 is in Palm Beach County, inside the metro, and the location of most Phase IX facilities is not shown; the company says both bear on the gas it can deliver to its South Florida customers.12

How much spare gas capacity does Miami have on the coldest day?

Pipelines supplying the Miami area N Florida Gas Transmission Florida Gas Transmission Florida Gas Transmission Florida Gas Transmission Florida Gas Transmission Florida Gas Transmission Station 21 Station 21 Miami Miami Hialeah Hialeah Fort Lauderdale Fort Lauderdale Pembroke Pines Pembroke Pines Hollywood Hollywood Miramar Miramar Coral Springs Coral Springs Pompano Beach Pompano Beach Boca Raton Boca Raton Broward County Broward County Miami-Dade County Miami-Dade County Palm Beach County Palm Beach County Port St. Lucie Port St. Lucie Fort Myers Fort Myers Sunrise Sunrise Deerfield Beach Deerfield Beach Homestead Homestead Boynton Beach Boynton Beach Miami Beach Miami Beach I-75 I-75 Collier County Collier County Hendry County Hendry County Monroe County Monroe County Pipelines supplying the Miami area Other gas pipelines Highways Miami metro area (3 counties) County lines Cities and towns Compressor station named on this page
Figure 1. Major natural gas pipelines serving Miami. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: HIFLD compressor stations (DHS). Counties, places, state outline and population: U.S. Census Bureau. Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Florida Gas Transmission.
  • Compressor stations marked: Station 21.
  • Metro counties outlined (3): Broward County; Miami-Dade County; Palm Beach County.
  • Cities and towns labeled include: Miami; Port St. Lucie; Hialeah; Fort Lauderdale; Pembroke Pines; Hollywood; Miramar; Coral Springs.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

On the evidence in the record, the Florida City Gas system does not have enough primary firm capacity for its peak design day, the coldest day the company plans its system to serve. The company said it must rely on secondary capacity at peak, that such capacity is often unavailable in extreme conditions, and that a tightening regional supply-demand balance raises the risk that primary shippers will have no surplus to release; it continues to evaluate pipeline solutions and projects for the significant capacity shortfall. The testimony does not quantify the shortfall or the design day, so no margin can be calculated.2

For Peoples, the record we reviewed gives design day only as a cost-allocation method in its 2025 rate case, with no demand or capacity figures for the Miami area. That is a gap on this page.

In October 2020 the federal pipeline safety agency (PHMSA) ordered Florida Gas Transmission to hold pressure 20 percent below the pre-failure level on pipe that included the 18-inch FLMEA-21 line that ruptured on September 24, 2020 at Lake Worth, Florida, until the agency approved an increase.17 PHMSA's order of October 1, 2020 covered that line and a parallel 24-inch line; a Second Amended Order of October 22, 2020 superseded it, redefined the pipe covered as about 124.6 miles of older pipe in the 18-inch FLMEA system, and left the October 1 deadlines unchanged.26

PHMSA closed the case on January 20, 2026, saying the company had complied with the October 1 order and that no further action is contemplated in the case; the letter does not mention the October 22 order and does not say when the restriction ended, and we found no penalty tied to the 2020 ruptures in the documents we reviewed.18

In February 2026 the company asked the Federal Energy Regulatory Commission (FERC) to reduce the permanent maximum allowable operating pressure (the highest pressure a pipeline may run at) of its Port Everglades delivery facilities in Broward County; the notice says the project will not affect system capacity.19

What is driving new natural gas demand?

A search of official records found no documented new gas load in the metro.

Florida City Gas said the capacity it is acquiring is needed to ensure it can provide service to new customers, and the testimony names no new load or service date.3 Chesapeake Utilities, which owns Florida City Gas, said in July 2026 that population and economic growth in Florida has led to significant energy supply constraints in the south Florida area, and the release gives no figure.9

EIA's September 2026 generator inventory lists no planned natural gas-fired generator in Miami-Dade, Broward or Palm Beach county.8 Of three Federal Register notices of FERC since January 1, 2025 that we found naming a metro county, the Miami-Dade one (a pressure reduction at Florida Gas Transmission's SE Hialeah delivery facilities) says the project will not affect system capacity.10 The Palm Beach County one, of March 17, 2025, asks to raise the power of a compressor turbine at Compressor Station 21 so that 50,000 MMBtu per day of existing service can be delivered to Florida Power and Light, without raising certificated capacity.25

Data centers: As of October 29, 2026, we found no data center gas load in Broward, Miami-Dade or Palm Beach County: EIA's inventory lists no planned generator of any fuel there, and we found no filing or release tying a data center to Florida City Gas, Peoples, the Florida Energy Pathway or a Florida Gas Transmission lateral.13 Florida's 2026 data center law sets large-load tariff rules for electric utilities and excludes gas utilities from its definition, so it concerns electric service, not gas.14

Nearby: FPL's 2026 Ten Year Power Plant Site Plan lists new combustion turbines from 2032 and names no site for them in its resource table; its 672 MW Vandolah plant, planned for 2027, is in Hardee County, not in the metro.11 Florida Gas Transmission's Phase IX application notice names Alabama, Florida and Mississippi and no county, and its scoping notice names Lake and De Soto Counties for two new compressor stations, neither in the metro.15

Are upgrades arriving in time?

The company's planned addition is 40,000 Dth per day of additional firm capacity, with primary rights to constrained areas, under a precedent agreement for Florida Gas Transmission's Phase IX expansion. The expected effective date is the fourth quarter of 2028, so the winters of 2026-27 and 2027-28 come before it. The company said the capacity is needed for its peak design day requirements and is critical to ensure meaningful access to capacity and supply; no new load or service date is named.3

Meanwhile the company has the Homestead LNG storage facility, in service since April 2023, which it said allows it to back feed a sizable portion of its South Florida operations if the single source supply is interrupted and has been used for peak shaving when needed. The testimony gives no capacity for the facility and no dates of use, so how much of the primary capacity gap it covers is not shown.4

Phase IX is an interstate pipeline expansion; the notices we reviewed name no metro-county facility, and its in-service date is the company's expectation, not a finding of the Commission.3

Separately, Chesapeake Utilities, which owns Florida City Gas, announced on July 13, 2026 the Florida Energy Pathway, an anticipated 24-inch intrastate pipeline from Palm Beach County to Miami-Dade County, anchored by firm commitments of nearly 250,000 Dth per day with upstream capacity from Phase IX, and anticipates service in 2030, after Phase IX's expected date. These are company statements; the release does not name the shippers or say whether Florida City Gas holds any of the capacity, and the record we reviewed names no Commission action on the project.9

What does this mean for business gas costs?

The record gives no dollar or bill figure for capacity costs by customer class, so none is given here. These are the positions on file:

  • Florida City Gas is seeking a base rate increase of $63,273,876, using a projected test year ending December 31, 2027; this is a request, not a decision.5
  • The Federal Executive Agencies' witness recommended that the Commission direct the company to use a design day demand based capacity cost allocator in its next rate case, instead of a peak and average allocator; this is a party's position.6

Who bears the cost of the Phase IX capacity is not decided in the record we reviewed.

Winter and market context

NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, south Florida; the discussion names regions, not counties.21

Our search of Federal Register notices from July 31 to October 29, 2026 found Florida Gas Transmission's Phase IX application and scoping notice and other filings, and none names Miami-Dade, Broward or Palm Beach County.20 The pipeline's informational postings, which need a browser to open, are not covered here.

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal at the Miami International Airport station in 2023-24 and 2024-25 and above it in 2025-26.22 NOAA's October 15, 2026 outlook gives the Miami area only a slight lean in either three-month period, with the three temperature categories close to equal chances.23 The airport is one station, and NOAA's figures are three-month probabilities, not forecasts of specific days.24

Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
2023-24 25 103 -75.7%
2024-25 53 103 -48.5%
2025-26 163 103 +58.3%

Heating degree days at the Miami International Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

What's new (as of October 29, 2026)

On September 9, 2026 Florida Gas Transmission filed its FERC application for the Phase IX expansion, and on October 27, 2026 FERC opened environmental scoping, with comments due November 23, 2026.15 In its order of June 19, 2026 the Commission set the hearing on Florida City Gas's rate request for September 28 to October 2, 2026, and we found no order after it.16

What should Miami-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff and that riders, demand and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which utility, and which supply arrangement. Confirm whether each site is served by Florida City Gas, Peoples or another gas utility, and whether gas comes from the utility or a third-party supplier relying on secondary capacity.
  • Firm or interruptible, and the terms. Know the interruption terms in the tariff for each account; this page does not state them because the filings we reviewed do not include the tariffs.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible and fuel inventories and resupply are in place before December.
  • Upcoming proceedings. Track the Commission's order in the Florida City Gas rate case, FERC's review of Phase IX, and the Phase IX in-service date.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Miami businesses face natural gas shortages this winter?

The record does not show a shortage, and this page predicts no outages. Florida City Gas said in April 2026 that it relies on secondary capacity at peak and has an LNG facility for peak shaving. See 'How much spare gas capacity does Miami have on the coldest day?'

Does Florida City Gas have enough pipeline capacity for its coldest day?

By its own April 2026 testimony, it does not hold sufficient primary firm capacity to serve its entire customer base during peak design day conditions, and gives no shortfall figure; that is a utility statement, not a Commission finding. See 'How much spare gas capacity does Miami have on the coldest day?'

What is Florida Gas Transmission's Phase IX expansion?

Florida City Gas has a precedent agreement for capacity on this expansion, expected to take effect in the fourth quarter of 2028. Its owner proposes a separate 24-inch pipeline anticipated in 2030. See 'Are upgrades arriving in time?'

How many pipelines bring gas to Florida City Gas?

The company said Florida Gas Transmission is the only one, and Compressor Station 21 constraints limit gas into the market south of it. See 'What is the outlook for Miami gas capacity through 2029?'

What does the Homestead LNG facility do?

Florida City Gas said it lets the company back feed a sizable portion of its South Florida operations if the single source supply is interrupted. See 'Are upgrades arriving in time?'

What do we know about Peoples Gas in Miami?

Peoples lists a Miami service area. The record we reviewed has no peak-day or capacity figures for it. See 'Who serves the Miami area?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • The size of the capacity shortfall and the design day. The public record we reviewed does not give them.
  • Peak-day and capacity figures for Peoples Gas System's Miami service area and its Palm Beach County territory. The record we reviewed has no such figures, and we did not find the company's load and supply plans for the Miami area.
  • Dated gas supply events since 2020. The record we reviewed does not date any.
  • What the tariff says about who is interrupted first. The tariff's interruption terms are not shown in the record this page draws on.
  • The Commission's decision in the Florida City Gas rate case, and any staff recommendation. The record we reviewed does not include them.

Notes

  1. Florida City Gas, Direct Testimony of Dan Noia, Docket 20260026-GU, filed April 20, 2026, PDF 7 and 8 (counties and customers). Utility statements. The metro counties are Broward, Miami-Dade and Palm Beach; the company names all three among the eight counties it serves. ↩
  2. Same testimony, PDF 6, 12, 13 and 14 (capacity planning). Utility statements, company-wide. ↩
  3. Same testimony, PDF 14 (Phase IX precedent agreement, 40,000 Dth per day, expected Q4 2028). ↩
  4. Direct Testimony of William Haffecke, Docket 20260026-GU, filed April 20, 2026, PDF 29 (Homestead LNG facility). ↩
  5. Direct Testimony of Everngam, same docket, PDF 10 (rate request). A request, not a decision. ↩
  6. Direct Testimony of Michael P. Gorman for the Federal Executive Agencies, same docket, filed July 20, 2026, PDF 13. A party position. ↩
  7. Peoples Gas System, Direct Testimony of Buzard, Docket 20250029-GU, 2025, PDF 27 (service areas). ↩
  8. EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to Miami-Dade, Broward and Palm Beach counties, and a Federal Register search of FERC notices since January 1, 2025 by county phrase. A notice that spells a place differently would be missed. ↩
  9. Chesapeake Utilities Corporation, news release, July 13, 2026 (Florida Energy Pathway), accessed October 25, 2026. A company statement for an intrastate project; no Florida Public Service Commission filing for it was read. ↩
  10. Federal Energy Regulatory Commission, Federal Register notice 2025-21763 (90 FR 55311, December 2, 2025), Florida Gas Transmission Company, LLC, Docket CP26-29-000 (SE Hialeah MAOP Reduction Project). ↩
  11. Florida Power & Light Company, Ten Year Power Plant Site Plan 2026-2035, Table ES-1 (PDF 32) and the potential units table (copy hosted by NextEra Energy investor relations; the Commission's own copy was not saved). ↩
  12. Florida City Gas, Direct Testimony of Dan Noia, Docket 20260026-GU, filed April 20, 2026, PDF 13 (constraints at Florida Gas Transmission's Compressor Station 21 and the market south of it) and PDF 14 (Phase IX capacity needed for its peak design day requirements). A utility statement. ↩
  13. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, Planned sheet ("Inventory of Planned Generators as of September 2026"): our filter for Florida with county Miami-Dade, Broward or Palm Beach returned no row. Searches on October 29, 2026: Federal Register notices of the Federal Energy Regulatory Commission published July 31 to October 29, 2026 for Florida Gas Transmission, Peninsula Pipeline, Peoples Gas, Florida City Gas, Miami-Dade, Broward and Palm Beach (none concerns a data center; the three Palm Beach hits are hydropower licence transfers), and web searches for data center gas generation, Chesapeake's Florida Energy Pathway and Peoples in the three counties, which found no official record (news results were leads only). State air permit and Public Service Commission large-load filings were not searched in their own portals. ↩
  14. Florida Senate, Senate Bill 484 (2026), Data Centers, enrolled bill text, new section 366.043, Florida Statutes, definition of "public utility" (has the meaning in s. 366.02, "except that the term does not include a gas utility"). We read the enrolled text and did not confirm the signing on an official page. ↩
  15. Federal Register, FERC notice of application, document 2026-19819 (91 FR 61391, September 29, 2026), Docket CP26-578-000: Florida Gas Transmission Company, LLC filed on September 9, 2026 for its Phase IX Project, designed to provide 526,750 million British thermal units per day, estimated cost $1,220,215,365, in Alabama, Florida and Mississippi; and notice of scoping, document 2026-21870 (91 FR 67560, October 27, 2026), about 508 million cubic feet per day of additional firm capacity, 94.6 miles of mainline loops, modifications at 13 compressor stations and two new compressor stations in Lake and De Soto Counties, Florida; comments due November 23, 2026. Neither notice gives an in-service date. ↩
  16. Florida Public Service Commission, Order No. PSC-2026-0219-PCO-GU, Order Suspending Permanent Rate Increase and All Associated Tariff Revisions, issued June 19, 2026, Docket 20260026-GU, page 2 (administrative hearing scheduled for September 28 - October 2, 2026; the $63.3 million permanent increase suspended pending a final decision). We found no later order or staff recommendation in the docket and did not confirm that the hearing took place as scheduled. ↩
  17. PHMSA, Amended Corrective Action Order, CPF 4-2020-008-CAO, to Florida Gas Transmission Company, October 1, 2020 (copy accessed November 2, 2026), PDF 3 (Incident 2, rupture of the 18-inch FLMEA-21 pipeline at Lake Worth, Florida, on September 24, 2020, isolated between compressor stations 21 and 21.5) and PDF 8 ("the entire 67.04 miles of the 18-inch FLMEA-21 pipeline and the 60.2 miles of the 24-inch FLMEB-21 pipeline"; a 20 percent pressure reduction on that pipe "until written approval to increase the pressure" is obtained from the Director). The October 22, 2020 Second Amended Order (note 26) supersedes this order. ↩
  18. PHMSA, closure letter, CPF 4-2020-008-CAO, January 20, 2026 (copy accessed November 2, 2026), page 1: "you have complied with the terms of the ACAO"; "this case is now closed"; "no further action is contemplated with respect to the matters involved in this case." The letter describes the October 1, 2020 order and does not name the October 22, 2020 Second Amended Order. It does not say when the pressure restriction ended. The October 22 order warns that failure to comply "may result in the assessment of civil penalties" (note 26); neither the orders nor the letter records a penalty. We did not search for any other PHMSA case. ↩
  19. Federal Register, FERC notice, document 2026-03117 (91 FR 7475, February 18, 2026), Docket CP26-83-000: on February 3, 2026 Florida Gas Transmission Company, LLC requested authorization to reduce the permanent maximum allowable operating pressure of its Port Everglades delivery facilities in Broward County (Port Everglades MAOP Reduction Project), page 7476: the project will not affect system capacity. The request keeps the company in compliance with PHMSA regulations. It is a company request, not a PHMSA order. ↩
  20. Federal Register, FERC Combined Notices of Filings 2026-16323 (August 11, 2026; docket RP26-1042, NAESB standards compliance), 2026-18036 (September 3, 2026; RP26-1148, fuel filing) and 2026-21490 (October 21, 2026; RP27-46, rate agreement amendment), and notices 2026-18037 (September 3, 2026; 2026-Q3 MAOP Change Project, delivery facilities in Polk, Pinellas, Hillsborough, Hardee and DeSoto Counties), 2026-19984 (September 30, 2026; Calhoun and Liberty Counties) and 2026-20108 (October 1, 2026; Brooks Lake relocation, East Baton Rouge Parish, Louisiana), found by a Federal Register search of FERC notices for Florida Gas Transmission. Florida Gas Transmission's informational postings are a browser-only portal and were not reviewed. ↩
  21. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026 (source B1): the discussion also gives the greatest likelihood of wetter than normal conditions to the Southeast and Florida, and puts the probability of at least a strong El Nino continuing through January to March 2027 at 80%. EIA said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and its October 2026 Short-Term Energy Outlook says prolonged periods of cold weather could increase withdrawals beyond its forecast (sources A1 and A2). EIA lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. These are national and regional facts, not statements about the utility's system. ↩
  22. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Miami International Airport (station USW00012839). Sums are our calculation. Heating degree days behind the percentages: 25 in 2023-24, 53 in 2024-25 and 163 in 2025-26, against a 1991-2020 normal of 103. ↩
  23. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Miami location. The map shows above-normal as the leading category for November 2026 to January 2027 at the lower edge of its band, 33.0%, and near-normal as the leading category for December 2026 to February 2027, also at 33.0%; the shapefile gives only that category and value, and the other categories are not read from it. NOAA's explanation keeps the middle category at 33.3%, so the three categories are close to equal chances. ↩
  24. The station is Miami International Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
  25. Federal Register, Federal Energy Regulatory Commission notices that name Palm Beach County, Florida, found by our search of notices since January 1, 2025 for county names in the singular and the plural; we saved the text of each notice. (a) Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, document 2025-04141, published March 17, 2025, 90 FR 12314 to 12315 (docket CP25-91-000): Florida Gas Transmission's prior notice request of February 27, 2025 for its CS 21 Enhancement Project: raising one gas-fired compressor turbine at existing Compressor Station 21 in Palm Beach County from 6,500 to 7,700 horsepower and adding two cooling towers, designed to meet demand for 50,000 MMBtu per day of existing transportation service to be reallocated for delivery to Florida Power and Light in Florida Gas's Market Area, without increasing the overall certificated capacity of its system, at an estimated cost of $9,000,000. The notice names no gas utility and no gas load, and we did not read the request itself. The other two notices that name a metro county, for Miami-Dade and Broward Counties, are in notes 10 and 21. ↩
  26. PHMSA, Second Amended Corrective Action Order, CPF 4-2020-008-CAO, to Florida Gas Transmission Company, October 22, 2020 (copy accessed November 2, 2026), PDF 3: "This Second ACAO supersedes both the September 18, 2020 Corrective Action Order and the October 1, 2020 Amended Corrective Action Order." PDF 1 (cover letter): "the Second ACAO does not amend any of the deadlines in the Amended Corrective Action Order issued on October 1, 2020." PDF 9: the affected pipe is "approximately 124.6 miles of pre-1970 LF ERW pipe contained in the 18-inch FLMEA pipeline system"; the pressure may "not exceed eighty percent (80%)" of the pressure before the September 24, 2020 failure, until the Director approves an increase. ↩
  27. Peoples Gas System, Inc., tariff Original Volume No. 3, Sheet No. 6.101 "Counties and Communities Served" and Sheet 6.101-4, filed as Exhibit LB-1, Document No. 11 with the Direct Testimony of Buzard, Docket 20250029-GU, March 31, 2025, PDF 140 (Broward County, with communities) and PDF 142 (Miami-Dade County, with communities). Palm Beach County is not in the list. The tariff gives no peak-day or capacity figure. ↩

Market and weather sources

Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
  3. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link

Sources

  1. Florida Public Service Commission, Docket 20260026-GU, Direct Testimony of Dan Noia (Florida City Gas). Link
  2. Florida Public Service Commission, Docket 20260026-GU, Direct Testimony of William Haffecke. Link
  3. Florida Public Service Commission, Docket 20260026-GU, Direct Testimony of Everngam. Link
  4. Florida Public Service Commission, Docket 20260026-GU, Direct Testimony of Michael P. Gorman (Federal Executive Agencies). Link
  5. Peoples Gas System, Docket 20250029-GU, Direct Testimony of Buzard. Link
  6. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  7. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  8. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  9. Federal Energy Regulatory Commission, Federal Register notice 2025-21763, Florida Gas Transmission Company, LLC, Docket CP26-29-000. Link
  10. Chesapeake Utilities Corporation, Florida Energy Pathway news release, July 13, 2026. Link
  11. Florida Power & Light Company, Ten Year Power Plant Site Plan 2026-2035. Link
  12. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Application and Establishing Intervention Deadline (91 FR 61391, September 29, 2026; document 2026-19819). Link
  13. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Phase IX Project (91 FR 67560, October 27, 2026; document 2026-21870). Link
  14. Florida Public Service Commission, Order No. PSC-2026-0219-PCO-GU, Order Suspending Permanent Rate Increase and All Associated Tariff Revisions, June 19, 2026 (Docket 20260026-GU). Link
  15. U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration (PHMSA), Amended Corrective Action Order, CPF 4-2020-008-CAO, to Florida Gas Transmission Company, October 1, 2020. Link
  16. U.S. Department of Transportation, PHMSA, Second Amended Corrective Action Order, CPF 4-2020-008-CAO, to Florida Gas Transmission Company, October 22, 2020. Link
  17. U.S. Department of Transportation, PHMSA, Closure letter, CPF 4-2020-008-CAO, January 20, 2026. Link
  18. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (91 FR 7475, February 18, 2026; document 2026-03117). Link
  19. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (91 FR 56651, September 3, 2026; document 2026-18037). Link
  20. Florida Senate, Senate Bill 484 (2026), Data Centers, enrolled bill text. Link
  21. NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00012839. Link
  22. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (document 2026-19984, September 30, 2026; Calhoun and Liberty Counties MAOP reduction) and 2026-20108 (October 1, 2026; Brooks Lake relocation, Louisiana). Link
  23. Federal Register (FERC notice), FERC Combined Notices of Filings 2026-16323 (August 11, 2026; Florida Gas Transmission RP26-1042 NAESB compliance). Link
  24. Federal Register (FERC notice), Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline (FR 2025-04141, March 17, 2025). Link

Corrected November 9, 2026: the earlier version listed Peoples Gas System's Miami service area as inside the metro on the strength of a passage with no county detail; the company's tariff in the same filing lists Broward and Miami-Dade Counties, so Peoples is now shown inside the metro in those two counties, with Palm Beach County and its capacity figures unclear. The earlier version also said the Homestead LNG facility is in Miami-Dade County; the testimony names only Homestead, Florida, so the county is now shown as unclear. It also placed Compressor Station 21 and Phase IX outside the metro; the station is in Palm Beach County, inside the metro, and the notices name no metro-county Phase IX facility.