Ohio and Kentucky natural gas case study, Cincinnati area. November 2026
Cincinnati-area gas capacity: one utility's design day table shows no gap line
Duke Energy Ohio's 2023 report lists a Peak Day Design of 915,511 Dth per day against Total Capacity of 669,377 at 1/1/2025, with no gap line; four more pipelines are only proposed for 2028 to 2033.
Metro used: the Cincinnati, OH-KY-IN metropolitan statistical area, as delineated in OMB Bulletin No. 23-01 (July 21, 2023), with 15 counties in Ohio, Kentucky and Indiana.4 Duke Energy Ohio, Inc. (Duke Energy Ohio) and Duke Energy Kentucky, Inc. (Duke Energy Kentucky) serve the Ohio and Kentucky counties, and Duke Energy Ohio files its gas forecasts with the Public Utilities Commission of Ohio (PUCO). The Indiana counties, Bracken County and the municipal and cooperative systems are stated gaps, so confidence is Medium.
Key takeaways
- Duke Energy Ohio told the PUCO in its 2023 report that its design day is a 1-in-30-year event of 81.3 wind-adjusted heating degree days, for its whole system.1
- Duke Energy Ohio said its requirements include load that third-party suppliers serve, and the table shows no gap or reserve line, so this page states no margin.1
- Its Bethel-Batavia pipeline, listed for construction in Summer 2023, shows a compliance notice on the PUCO docket filed November 30, 2023.2
- Four further lines are listed as Proposed for 2028, 2029, 2032 and 2033, with investment and application timing undetermined for three of them.2
- Duke Energy Kentucky's tariff starts a curtailment with Rate IT customers and protects Priority Use Customers, effective January 2026; the Kentucky record holds no design-day figures.3
- Texas Gas's Carnation Project would add 170,000 Dth per day of new firm capacity, fully subscribed by Duke Energy Ohio.8
What is the outlook for Cincinnati gas capacity through 2029?
Discovery Energy rates the outlook for Cincinnati-area natural gas capacity through 2029 as Elevated (confidence: Medium): Duke Energy Ohio's 2023 report lists a Peak Day Design of 915,511 Dth per day against Total Capacity of 669,377 at 1/1/2025, with no line that calls the difference a gap.1 The same report lists four further pipelines only as Proposed, and for the Lebanon Connector and the Eastern Loop it names a higher degree of customer curtailment as the consequence of deferment.2 These figures are for Duke Energy Ohio's whole system, and the Kentucky and Indiana records hold no design-day figures. Documented risk factors: concentration, meaning that one pipeline service, Texas Gas Transmission firm transportation, is more than 10% of the Peak Day Design, as we calculate it from Duke Energy Ohio figures (17.6%).5 Three developments would change the assessment: Duke Energy Ohio's next Long-Term Forecast Report (a table after 1/1/2025, and any gap or reserve line); a PUCO or Ohio Power Siting Board application, order or date for the Lebanon Connector or the Eastern Loop; or a Duke Energy Ohio or Duke Energy Kentucky notice of curtailment, operational flow order or capacity limit on new firm service.
Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.
Who serves the Cincinnati area?
Duke Energy Ohio serves the five Ohio counties, and Duke Energy Kentucky serves the seven Kentucky counties; its tariff describes the two companies as an integrated operating system.4 The Indiana counties have six gas operators, and Bracken County has Columbia Gas of Kentucky and municipal systems, none of them covered here.4
| Where | Utility and what this page covers |
|---|---|
| Brown, Butler, Clermont, Hamilton and Warren counties, Ohio | Duke Energy Ohio: design day, city gate capacity table and planned lines (whole system) |
| Boone, Bracken, Campbell, Gallatin, Grant, Kenton and Pendleton counties, Kentucky | Duke Energy Kentucky: rate case order and tariff curtailment plan (no design-day figures) |
| Dearborn, Franklin and Ohio counties, Indiana | Not reached: six Indiana gas operators are listed by the crosswalk; no Indiana gas planning record was sought |
| Bracken County, Kentucky | Columbia Gas of Kentucky and municipal systems are listed beside Duke Energy Kentucky; the overlap is unclear and no places are assigned |
| Butler, Hamilton and Warren counties, Ohio | Municipal gas, Glenwood Energy of Oxford and Knox Energy Cooperative are listed beside Duke Energy Ohio; not covered here |
Utility records by whether they fall inside the Cincinnati metro (OMB delineation). Source: utility filings in the Notes; county crosswalk from EIA-176.4
The Duke Energy Ohio figures come from its 2023 Long-Term Forecast Report to the PUCO, Case No. 23‑0544‑GA-FOR, the latest found on the PUCO site; its capacity table ends at 1/1/2025.1 The utilities do not allocate these whole-system figures by county. Interstate pipelines supply Duke Energy Ohio upstream of the metro, and Texas Gas and Columbia Gas Transmission facilities also sit in the metro's counties.2
How much spare gas capacity does Cincinnati have on the coldest day?
In words: what the map shows
- Pipelines labeled: Columbia Gas Transmission; Columbia Gulf Transmission; Rockies Express; Texas Gas Transmission.
- Metro counties outlined (15): Boone County; Bracken County; Brown County; Butler County; Campbell County; Clermont County; Dearborn County; Franklin County; Gallatin County; Grant County; Hamilton County; Kenton County; Ohio County; Pendleton County; Warren County.
- Cities and towns labeled include: Louisville/Jefferson County metro government (balance); Lexington-Fayette; Cincinnati; Dayton; Greenwood; Muncie; Hamilton; Springfield.
- Other gas pipelines in the area are drawn in gray and are not labeled.
- Highways are drawn for orientation. A small state locator map sits in a corner.
Duke Energy Ohio's report says its design day is a 1-in-30-year event, defined as 81.3 wind-adjusted heating degree days, with a wind-adjusted Design Day temperature of negative 16.3 degrees Fahrenheit. The company elected a third-party design day demand forecast for winter 2022-2023, and its city gate peak day firm capacity table reflects design day assumptions as of January 31, 2023.1
| Date | Peak Day Design (Dth per day) | Total Capacity (Dth per day) |
|---|---|---|
| 1/1/2023 | 899,255 | 553,661 |
| 1/1/2024 | 906,890 | 669,377 |
| 1/1/2025 | 915,511 | 669,377 |
Duke Energy Ohio's city gate peak day firm capacity table, Dth per day, whole Duke Energy Ohio system, as filed. The 1/1/2024 column is read from the page image. The table shows no gap, reserve or supply line.1
The two lines are not on the same basis. Duke Energy Ohio said its calculated peak day and peak season requirements represent the total firm load, including load supplied by third parties in its FT and RFT programs, reduced by the estimated third-party supply to find the capacity it must acquire, with a further adjustment for capacity it releases to suppliers.1 So we do not subtract one line from the other: the difference at 1/1/2025 is 246,134 Dth per day by our calculation, but the report does not call it a gap or a shortfall.5
| Pipeline service at 1/1/2025 | Dth per day |
|---|---|
| Texas Gas | 161,545 |
| Tennessee, via KO Transmission | 23,573 |
| Columbia Gulf, via KO Transmission | 67,686 |
| Rockies Express | 57,000 |
| Columbia Gas | 118,059 |
| Total pipeline firm transportation | 427,863 |
| Columbia Gas FSS storage | 216,514 |
| Texas Gas NNS storage | 25,000 |
| Total pipeline storage | 241,514 |
Duke Energy Ohio's city gate peak day firm capacity table at 1/1/2025, Dth per day, whole system, as filed.1
By our calculation Texas Gas firm transportation is 17.6% of the 1/1/2025 Peak Day Design and Columbia Gas FSS storage is 23.7%, though that design includes third-party load.5 Duke Energy Ohio said it owns no storage and relies mainly on short-term, seasonal supply contracts for its firm sales customers.1
Duke Energy Kentucky. The Kentucky Public Service Commission (Kentucky PSC) decided Duke Energy Kentucky's gas rate case on December 23, 2025, and our scan of the case's 113 filings we reviewed found no design-day demand, supply or capacity figure, so Duke Energy Kentucky's own margin on the coldest day is not shown.3
What is driving new natural gas demand?
We found one planned power plant load that bypasses the utility and one capacity addition that Duke Energy Ohio has fully subscribed, and no data center gas load in the metro's 15 counties.
Duke Energy Ohio's planned-line forms cite growth in general terms (loops for mixed customer growth in Clermont County and, for one line, future industrial growth) and name no customer, load or service date.2 EIA's September 2026 inventory lists no planned natural gas-fired generator in the 15 metro counties, and its Retired sheet lists only two small on-site gas steam turbines in Hamilton County as retired since 2024.610 Our first search for Federal Energy Regulatory Commission (FERC) pipeline notices naming a metro county since January 1, 2025 found none, but it missed three projects that a second search by project name found.14
Planned loads: On May 29, 2026 Texas Gas Transmission applied to FERC (docket CP26-536-000) for the Dearborn County Lateral, an about 12-mile, 20-inch pipeline from Dearborn County, Indiana, to Hamilton County, Ohio. It would deliver 265,000 Dth per day of firm service to Vistra's Miami Fort Power Plant, which FERC's notice says is planning to convert from coal to natural gas.7 The gas comes from the pipeline's meter at the plant, not from Duke Energy Ohio, and the notices do not mention a data center.7
Data centers: As of October 29, 2026, we found no gas-fired plant, fuel cell or pipeline lateral for a data center in the 15 counties, and no electric-only data center filing that names a gas load, and no data center gas contract on Duke Energy Ohio's or Duke Energy Kentucky's gas system in the records we searched.14
Inside the metro counties: Columbia Gas Transmission's NKY Gate Enhancement Project would build about 30.2 miles of new pipeline and abandon 48.5 miles of 1950s pipeline, with facilities in Bracken, Campbell and Hamilton counties; its notice does not name Duke Energy.9
Are upgrades arriving in time?
The Bethel-Batavia pipeline in Clermont County was listed for construction in Summer 2023 under Case No. 20‑1411‑GA-BTX, and the PUCO case record lists, on November 30, 2023, Duke Energy Ohio's Notice of Compliance with Condition 10, titled as a commercial operation notice; the notice itself is not among the filings we reviewed.2
Four lines are listed as Proposed: the Lebanon Connector in Warren County for 2028, with capital investment and application timing undetermined; the Eastern Loop in Clermont County for 2029, deferred from the previous report; the Eastern Loop-Lebanon Connector for 2032; and C338 Phase 2 for 2033.2
For the Lebanon Connector Duke Energy Ohio listed the consequence of deferment as a potential for a higher degree of customer curtailment; for the Eastern Loop and Bethel-Batavia, a higher degree of customer curtailment in warmer temperatures and lack of future growth in the area.2 The report states no need date, so this page cannot say whether a line arrives before a need, and no PUCO or Ohio Power Siting Board approval for these lines was found in the records we reviewed. Duke Energy Ohio said it neither owns nor proposes to construct any storage facilities.2
The Carnation Project is a supply addition on Texas Gas, not a Duke Energy Ohio line. Texas Gas applied to FERC on October 31, 2025 (docket CP26-16-000) for one new 14,189-horsepower compressor unit at its Crosby-Harrison station in Hamilton County, Ohio, which the notice says creates 170,000 Dth per day of new firm capacity, fully subscribed by Duke Energy Ohio; FERC staff issued its environmental assessment on May 14, 2026, and Texas Gas's project page lists regulatory review through Q4 2026 and in-service in Q4 2027, but we found no FERC certificate order.8 Duke Energy Ohio's report was filed in June 2023, before the application, so its capacity table does not show this capacity.1
What does this mean for business gas costs?
For Kentucky, the Kentucky PSC's December 2025 order says Duke Energy Kentucky applied the average and excess method (also called the average and peak demand method) in its cost of service study and that the Kentucky PSC accepted the study in accordance with the stipulation.3 These are the parties' positions and the Kentucky PSC's finding on method, with no dollar effect on business customers stated. This page does not cover Duke Energy Ohio's current rate case (26‑0635‑GA-AIR, filed June 2026).
Who gets gas first in a shortage?
Duke Energy Kentucky's tariff (Sheet No. 83, effective January 3, 2026) says that in an emergency that necessitates curtailment it shall curtail gas service as set out in its plan, and defines Priority Use Customers as gas supply needed for human needs customers and for specific and definable plant protection purposes.3 Stage 1 of a mandatory curtailment is interruption of Rate IT customers; stage 2 adds firm gas to customers using more than fifty thousand cubic feet per day, and stage 3 adds gas to firm customers, in both cases except Priority Use Customers for such priority use.3
This is the tariff's wording, not a statement that any curtailment is expected. This page does not cover Duke Energy Ohio's gas tariff.
Winter and market context
National layer. NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the Ohio Valley and mid-Atlantic regions, a discussion that names regions and not counties, and that the probability of at least a strong El Nino continuing through January to March 2027 is 80%.B1
The U.S. Energy Information Administration (EIA) said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast.A1A2 EIA lists U.S. liquefied natural gas gross exports at 15, 18 and 19 billion cubic feet per day in 2025, 2026 and 2027.A1
Regional layer. EIA's weekly storage table, released October 22, 2026, lists working gas in the East storage region of 900 billion cubic feet for the week of October 16, 2026; this page does not compare the region with its five-year average, which EIA gives in a weekly report page that this edition does not cover.C1 EIA's monthly natural gas citygate price for Ohio was 4.72 dollars per Mcf in April 2026, the latest month with a numeric value.C2 For Kentucky it was 3.44 dollars per Mcf in July 2026; these are state series and not Duke's own prices.C3
Recent winter or critical notices from the pipelines that serve Duke Energy Ohio are not shown, because their posting sites are not covered in this edition.15 These are regional and national facts, not statements about the utilities' systems.
Winter weather and NOAA's outlook
Heating degree days, a measure of how much heating the weather called for, ran below the 1991-2020 normal at the Cincinnati/Northern Kentucky International Airport station in each of the last three winters.11 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the Cincinnati area at least a 40% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027.12 The airport is one station standing in for the metro, and NOAA's figures are probabilities for a three-month average, not a forecast of specific days.13
| Winter (November to March) | Heating degree days | 1991-2020 normal | Difference from normal |
|---|---|---|---|
| 2023-24 | 3484 | 4082 | -14.6% |
| 2024-25 | 3859 | 4082 | -5.5% |
| 2025-26 | 3996 | 4082 | -2.1% |
Heating degree days at the Cincinnati/Northern Kentucky International Airport station, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.
Policy context
Ohio Revised Code Section 4933.41 (House Bill 201), in effect since September 30, 2021, says every person seeking distribution or retail natural gas service has the right to obtain any available such service from a natural gas company with capacity to provide it in that location.D1 Kentucky's 2021 Act (House Bill 207, Chapter 120) creates a section of Kentucky Revised Statutes Chapter 65 that bars local legislative or administrative action having the purpose or effect of restricting, based on energy source, a consumer's ability to use specified regulated utility services, and it preserves the Public Service Commission's powers.D2 This page does not cover Indiana policy, because it does not cover the Indiana counties.
What's new (as of October 29, 2026)
On August 5, 2026 FERC staff issued an environmental assessment for Columbia Gas Transmission's NKY Gate Enhancement Project.9 On August 4, 2026 FERC staff scheduled the environmental assessment for the Dearborn County Lateral to Vistra's Miami Fort Power Plant for January 15, 2027.7
What should Cincinnati-area facilities check now?
- Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
- Which service. Confirm whether each site takes firm or interruptible service, since Duke Energy Kentucky's tariff starts curtailment with Rate IT customers.
- Which utility. Confirm whether the site is served by Duke Energy Ohio, Duke Energy Kentucky, an Indiana distributor, a municipal system or another utility, because the records differ by utility.
- Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and that fuel inventories and resupply are in place before December.
- Upcoming proceedings. Track Duke Energy Ohio's next Long-Term Forecast Report, rate case, and Lebanon Connector and Eastern Loop plans, and Texas Gas's Carnation Project.
What to check in your contracts
| Area | What to check |
|---|---|
| Winter price spikes | Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes. |
| Delivery constraints | Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first. |
| Operational flow orders | What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you. |
| Expansion plans | Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date. |
Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.
Frequently asked questions
Will Cincinnati businesses face natural gas shortages this winter?
The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does Cincinnati have on the coldest day?'
Is there spare gas capacity in the Cincinnati area on the coldest day?
It is not shown: Duke Energy Ohio's table lists a Peak Day Design above Total Capacity without calling the difference a gap, and the Kentucky record holds no design-day figures. See 'How much spare gas capacity does Cincinnati have on the coldest day?'
Is Duke Energy Ohio building new gas pipelines?
It lists four lines as Proposed and shows a commercial operation compliance notice for its Bethel-Batavia pipeline. See 'Are upgrades arriving in time?'
Is new demand driving gas use in the Cincinnati area?
The forms name no load; a planned power plant lateral is the one named gas load we found, and we found no data center gas load. See 'What is driving new natural gas demand?'
Who is cut first if Duke Energy Kentucky must curtail service?
It starts with interruptible (Rate IT) customers, then larger firm and firm customers, with exceptions for Priority Use Customers; the filings we reviewed do not include Duke Energy Ohio's terms. See 'Who gets gas first in a shortage?'
Related case studies
Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.
- Pennsylvania UGI Gas territory natural gas capacity case study (outlook: High)
- York natural gas capacity case study (outlook: Elevated)
- St. Louis natural gas capacity case study (outlook: Elevated)
- Kansas City (Missouri side) natural gas capacity case study (outlook: Elevated)
- Pittsburgh natural gas capacity case study (outlook: Elevated)
All gas capacity ratings by U.S. metro
Background for commercial and industrial energy buyers: Utility cost intelligence
Understand your capacity exposure
Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.
Schedule a reviewWhat this page does not cover
- Whether any supply events have hit the Duke Energy systems since 2020. The federal winter storm report and the Kentucky filings we scanned name neither Duke utility.
- Who pays for Duke Energy Ohio's gas costs, and how it would interrupt customers. Its 2026 rate case files and its gas tariff were not available to us.
- Duke Energy Kentucky's design day and capacity figures. The record we reviewed does not give them.
- What gas service looks like in the Indiana counties and in the municipal and cooperative systems. We found no Indiana gas record, and no detail on the municipal and cooperative systems in Hamilton, Butler, Warren and Bracken counties.
- Whether other large new gas users are planned in the metro. Air permit, power siting and grid-queue records are not covered here, so a project could exist that this page does not show.
Notes
- Duke Energy Ohio, Inc., 2023 Long-Term Forecast Report for Gas Demand, Gas Supply, and Facility Projections (PUCO Case No. 23‑0544‑GA-FOR; filed June 1, 2023, per the PUCO case card and the cover letter on PDF 2), PDF 1 (preface), PDF 38 and PDF 41 to PDF 43 (supply and design day discussion), PDF 40 (city gate peak day firm capacity table, a table printed as an image; we checked the figures against the page's text and column sums, and read the 1/1/2024 Peak Day Design of 906,890 by eye). Utility statements. The report says the company subscribes to storage on the Columbia Gas Transmission and Texas Gas Transmission systems. A footnote to the 1/1/2025 table says KO Trans was acquired by Columbia Gas on February 1, 2023. ↩
- Duke Energy Ohio, same report, Form FG3-2 (PDF 52 and PDF 61 to PDF 64) and Form FG2-4 (PDF 47); PUCO case record for 20‑1411‑GA-BTX (first page of the document list). Utility statements and a regulator docket record. The Bethel-Batavia pipeline is existing line C338 at Bethel to the Batavia area in Clermont County, about 84,750 feet. The Lebanon Connector runs to the Lebanon hub in Warren County and its purpose is given as greater operational flexibility and diversified supply. The Eastern Loop runs from the Batavia area to the Goshen area in Clermont County. ↩
- Kentucky Public Service Commission, Order of December 23, 2025, Case No. 2025-00125 (PDF 1 and PDF 19 to PDF 20); Duke Energy Kentucky, Inc. gas tariff KY.P.S.C. Gas No. 2, Sheets No. 44 and No. 83 (effective January 3, 2026); our keyword scan of the 113 filings saved from the case. Commission order and utility tariff. Duke Energy Kentucky proposed to eliminate 50 percent of the subsidy or excess revenues between customer classes, based on present revenues. ↩
- Metro counties from the Census OMB delineation: Brown, Butler, Clermont, Hamilton and Warren counties in Ohio; Boone, Bracken, Campbell, Gallatin, Grant, Kenton and Pendleton counties in Kentucky; Dearborn, Franklin and Ohio counties in Indiana. Utility-to-county matches from EIA-176 (2024) as built into the Discovery Energy crosswalk, which also lists municipal systems, cooperatives and Columbia Gas of Kentucky in Bracken County and six gas operators in the Indiana counties. The crosswalk matches Duke Energy Ohio to five Ohio counties and Duke Energy Kentucky to seven Kentucky counties. The six Indiana gas operators it lists are Ohio Valley Gas Corp, Sycamore Gas Co, Aurora Utilities System, South Eastern Indiana Natural Gas, Valley Rural Utility Co and Batesville Gas Utility. ↩
- Our calculations (illustrative), each from the two Duke Energy Ohio figures named: Texas Gas 161,545 / 915,511, Columbia Gas FSS storage 216,514 / 915,511, and the difference 915,511 less 669,377. The Peak Day Design includes load that third-party suppliers serve, so none of these is a margin. ↩
- EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to the metro counties by us, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, our own; the search missed three projects that a second search found (see Note 14). A notice that spells a place differently would be missed. ↩
- Federal Register, FERC notices for Texas Gas Transmission, LLC, Dearborn County Lateral Project, docket CP26-536-000: Notice of Application and Establishing Intervention Deadline, document 2026-12228, June 18, 2026, pages 36819 to 36820 (application filed May 29, 2026; about 12 miles of 20-inch pipeline; 265,000 Dth per day; estimated cost $86,247,503; Vistra's Miami Fort Power Plant is described as "an electric generation facility located in Hamilton County, Ohio"); Notice of Schedule for the Preparation of an Environmental Assessment, document 2026-15780, August 4, 2026, page 49427 (environmental assessment January 15, 2027; federal authorization deadline April 15, 2027; planned conversion from coal to natural gas; comments from the Boone County Fiscal Court, which opposed the use of eminent domain, and letters of support from Ohio legislators); Notice of Scoping Period, document 2026-13275, July 1, 2026 (comments due July 27, 2026). The pipeline route passes through Boone County, Kentucky. ↩
- Federal Register, FERC notices for Texas Gas Transmission, LLC, Carnation Project, docket CP26-16-000: Notice of Application, document 2025-20187, November 18, 2025 (application filed October 31, 2025; Mars 100 compressor unit of 14,189 horsepower at the Crosby-Harrison Compressor Station and modification of Mainline Block Valve 64, Hamilton County; 170,000 Dth per day; estimated cost $67,500,000; "fully subscribed by Duke Energy Ohio, Inc."); Notice of Schedule, document 2026-00989, January 20, 2026 (environmental assessment May 11, 2026; federal decision deadline August 9, 2026); Notice of Availability of the Environmental Assessment, document 2026-09686, May 14, 2026 (comments due June 10, 2026). Texas Gas Transmission, Carnation Project web page (undated, accessed October 29, 2026): regulatory review Q4 2025 to Q4 2026, construction Q1 2027 to Q4 2027, in-service Q4 2027. We found no FERC certificate order in the sources we could read; FERC's eLibrary was not searched. ↩
- Federal Register, FERC notices for Columbia Gas Transmission, LLC, NKY Gate Enhancement Project, docket CP26-19-000: Notice of Application, document 2025-21490, November 28, 2025 (application filed November 10, 2025; estimated cost $429 million); Notice of Availability of the Environmental Assessment, document 2026-15884, August 5, 2026, pages 50527 to 50528 (about 30.2 miles of new pipeline, 24.62 miles of it 36-inch Line AM36 from northeastern Kentucky across the Ohio River; 48.5 miles of Lines AM04 and AM09 and other pipe abandoned; new lateral to the proposed Cold Spring Meter Station in Campbell County and a customer tie-in in Hamilton County; comments due August 31, 2026). The notice states the purpose as replacing pipeline installed in the 1950s to enhance safety, integrity and reliability. ↩
- EIA-860M, September 2026, Retired sheet: the Procter & Gamble Cincinnati Plant (12.5 MW natural gas steam turbine, December 2024) and the University of Cincinnati East Campus Utility Plant (1.3 MW, March 2024), both in Hamilton County; both are on-site units, and we found no sale, abandonment or end of service of a supply facility serving the metro. ↩
- NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65 degrees F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 29, 2026: Cincinnati/Northern Kentucky International Airport (station USW00093814). Sums are our calculation. Heating degree days behind the percentages: 3484 in 2023-24, 3859 in 2024-25 and 3996 in 2025-26, against a 1991-2020 normal of 4082. ↩
- NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefiles from ftp.cpc.ncep.noaa.gov/GIS/us_tempprcpfcst/seastemp_202610.zip), read at the Cincinnati location. The map gives the favored category and the lower edge of its probability band; NOAA's explanation keeps near-normal at 33.3% and gives the opposite category the rest, so for both periods Cincinnati has at least a 40% chance of above-normal temperatures, about 33% near-normal and no more than 27% below-normal. ↩
- The station is Cincinnati/Northern Kentucky International Airport; one airport station is not a measurement of the whole metro. The outlook figures are NOAA's probabilities for a three-month average and do not rule out cold days. ↩
- Federal Register API searches of FERC notices, since January 1, 2025 and for July 31 to October 29, 2026, by each county's name in singular form ("Hamilton County" Ohio and the other 14 counties), plural form ("Hamilton Counties" and the others, which returned none), Cincinnati, Duke Energy Ohio, Duke Energy Kentucky and the pipelines Columbia Gas Transmission, Columbia Gulf Transmission, Texas Gas Transmission, Rockies Express, Tennessee Gas Pipeline and KO Transmission. The two Duke Energy hits were electric transmission filings. We found no data center plant, fuel cell, lateral or gas special contract in the 15 counties in these searches, EIA-860M or the Duke Energy Ohio and Duke Energy Kentucky filings read; news reports are leads only and are not cited. ↩
- The pipelines named in Duke Energy Ohio's table are Texas Gas Transmission, Columbia Gas Transmission, Columbia Gulf Transmission, Tennessee Gas Pipeline and Rockies Express Pipeline; we could not open their posting sites for this edition. ↩
Market and weather sources
Public web sources, as of October 25 and 26, 2026. They are separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.
- A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link ↩
- A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link ↩
- B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
- C1. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, release of October 22, 2026. Link ↩
- C2. U.S. Energy Information Administration, Ohio Natural Gas Citygate Price, monthly. Link ↩
- C3. U.S. Energy Information Administration, Kentucky Natural Gas Citygate Price, monthly. Link ↩
Policy sources
Official state sources, as of October 26, 2026. They are separate from the regulatory record cited in the Notes.
- D1. Ohio Legislative Service Commission, Ohio Revised Code Section 4933.41. Link ↩
- D2. Kentucky Legislative Research Commission, 2021 Kentucky Acts Chapter 120 (House Bill 207). Link ↩
Sources
- Duke Energy Ohio, Inc., 2023 Long-Term Forecast Report, PUCO Case No. 23-0544-GA-FOR. Link
- Public Utilities Commission of Ohio, Case Record for 20-1411-GA-BTX. Link
- Kentucky Public Service Commission, Case No. 2025-00125, Duke Energy Kentucky gas rate case. Link
- Duke Energy Kentucky, Inc., Gas Tariff KY.P.S.C. Gas No. 2. Link
- Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
- Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
- Federal Register, FERC notices for the Dearborn County Lateral, Carnation and NKY Gate Enhancement projects. Link
- Texas Gas Transmission, LLC, Carnation Project page. Link
- NOAA Regional Climate Centers, ACIS StnData. Link
- Federal Register (FERC notice), Texas Gas Transmission, LLC; Notice of Application and Establishing Intervention Deadline (Dearborn County Lateral Project, CP26-536-000), June 18, 2026. Link
- Federal Register (FERC notice), Texas Gas Transmission, LLC; Notice of Schedule for the Preparation of an Environmental Assessment for the Dearborn County Lateral Project, August 4, 2026. Link
- Federal Register (FERC notice), Texas Gas Transmission, LLC; Notice of Application and Establishing Intervention Deadline (Carnation Project, CP26-16-000), November 18, 2025. Link
- Federal Register (FERC notice), Texas Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed Carnation Project, May 14, 2026. Link
- Federal Register (FERC notice), Columbia Gas Transmission, LLC; Notice of Availability of the Environmental Assessment for the Proposed NKY Gate Enhancement Project (CP26-19-000), August 5, 2026. Link
- Federal Register (FERC notice), Columbia Gas Transmission, LLC; Notice of Application and Establishing Intervention Deadline (NKY Gate Enhancement Project, CP26-19-000), November 28, 2025. Link
- Federal Register (FERC notice), Texas Gas Transmission Notice of Scoping Period, Dearborn County Lateral Project, July 1, 2026 (read; used only in a note). Link
- Federal Register (FERC notice), Texas Gas Transmission Notice of Schedule for the Carnation Project, January 20, 2026. Link
Corrected November 9, 2026: the earlier version said our search found no Federal Energy Regulatory Commission pipeline notice naming a metro county; a second search found three projects, the Dearborn County Lateral (265,000 Dth per day to a power plant), the Carnation Project (170,000 Dth per day) and the NKY Gate Enhancement Project, which this version now lists.