California natural gas case study, Southern California. November 2026

Southern California gas capacity: utility and state staff both rely on Aliso Canyon storage

SoCalGas expects to meet both design standards on its coldest day, but its January 2026 testimony projects a 172 MMcf/d shortfall at the authorized Aliso Canyon inventory, and CPUC staff say the day needs 550 MMcf/d from Aliso Canyon.

4,563 MMcf/dSoCalGas's 1-in-10 year cold day demand forecast, winter 2025-26, SoCalGas and SDG&E system, per SoCalGas
2,271 MMcf/dStorage withdrawal capacity at the November 1 inventory, four SoCalGas storage fields combined, per SoCalGas, November 2025
2,922 MMcf/dFlowing pipeline supply at 80% of 3,635 MMcf/d capacity (California production at 70), per SoCalGas, November 2025
172 MMcf/dPeak day supply shortfall at the authorized Aliso Canyon inventory, per SoCalGas testimony, January 2026

Metro used: the Los Angeles-Long Beach-Anaheim, Riverside-San Bernardino-Ontario and San Diego-Chula Vista-Carlsbad, CA metropolitan statistical areas, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). One record covers all three: the 2026 California Gas Report says Southern California Gas Company (SoCalGas) and San Diego Gas & Electric Company (SDG&E) procure supplies for bundled core demand as one combined portfolio, so every figure below is system-wide unless stated.5

Key takeaways

  • SoCalGas said in November 2025 that it expects to meet both design standards, including the 1-in-10 year cold day, with sufficient pipeline receipt capacity and storage.1
  • CPUC Energy Division staff said in October 2025 that the cold day needs Aliso Canyon withdrawals and recommended a lower inventory limit; that is not a Commission decision.3
  • In January 2026 testimony SoCalGas projected a shortfall under its own assumptions and said the day can be met only with 86.2 Bcf; that is a party's position.4
  • SoCalGas said that in late October 2025 repair conditions on two transmission lines severely restricted two of its zones and affected Honor Rancho storage withdrawal.1
  • The newest receipt capacity SoCalGas states is in documents dated November 2025 and April 2026, newer than the 2026 California Gas Report's October 2021 figure.1
  • We found no data center gas load and no planned gas generator in the five counties beyond three 0.3 MW units in San Bernardino County.12

What is the outlook for Southern California gas capacity through 2029?

Discovery Energy rates the outlook for Southern California natural gas capacity through 2029 as Elevated (confidence: Medium): SoCalGas's own January 2026 testimony projects a 1-in-10 cold day supply shortfall at the authorized Aliso Canyon inventory under its assumptions.4 CPUC staff say the day needs Aliso Canyon withdrawals, and no fix is shown that removes the need before winter 2030-31, the winter for which staff's model shows no Aliso Canyon need if the three planned upgrades (the Quigley Regulator Station, the Honor Rancho wells and the Honor Rancho compressor project) are in service.3 SoCalGas's November 2025 assessment expects sufficient capacity, and every figure is for the combined SoCalGas and SDG&E system.1 The Southern Zone, which CPUC staff say includes Riverside County, and SDG&E's service in southern Orange County are noted as system context and add no factor.3 Documented risk factors: one, a recent supply event, the October 2025 repair conditions on Lines 225 and 4000. Three developments would change the assessment: the CPUC's decision on SoCalGas's Aliso Canyon application, which sets the inventory limit; SoCalGas's winter 2026-27 technical assessment and the CPUC's 2027 Biennial Assessment, with updated shortfall or surplus figures; completion of the Quigley Regulator Station upgrade, the Honor Rancho wells and compressor project, and the repairs on Lines 225 and 4000.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Southern California area?

SoCalGas and SDG&E run one combined transmission and storage system that serves all five counties, and the record does not allocate demand, supply or storage to a county or metro. Each metro section below says what is local and otherwise points to the system-wide figures. Facilities outside the metros, or whose county the record does not state, matter because gas arrives through pipelines and storage fields that sit elsewhere.5

Where Item in the record
Inside the metros SoCalGas service in Los Angeles, Orange, Riverside and San Bernardino counties; SDG&E service in San Diego County and the southern part of Orange County; the City of Long Beach Utilities Department as a municipal gas utility in Los Angeles County
Outside the metros, system context System-wide design day demand, receipt capacity and storage withdrawal capacity; the Energia Costa Azul terminal in Baja California, Mexico
Unclear Where Southwest Gas Corporation serves in the metro counties; the county of each pipeline segment and storage facility named in the record, including the Aliso Canyon, Honor Rancho, La Goleta and Playa del Rey storage fields and the Quigley Regulator Station, whose counties no official source we reviewed states; the town-level split of SoCalGas's demand among the counties

The Southern California gas record by whether it falls inside the three metros (OMB delineation). Source: 2026 California Gas Report, SoCalGas winter and summer assessments, CPUC Energy Division Biennial Assessment.

Los Angeles-Long Beach-Anaheim

Los Angeles and Orange counties are served by SoCalGas (SDG&E also serves the southern part of Orange County), whose wholesale utility customers are SDG&E, Southwest Gas, the City of Long Beach Utilities Department and the City of Vernon, and the City of Long Beach Utilities Department said it serves approximately 150,000 customers in Long Beach, Signal Hill and parts of surrounding communities, receiving intrastate transmission service from SoCalGas.5

The one local capacity statement for Los Angeles in the record is the CPUC Energy Division staff's: until the constraint at the Quigley Regulator Station is alleviated, flows from Aliso Canyon are necessary to support demand variability in the Los Angeles basin, downstream of Quigley.3 Staff's passage gives no county for the station, and the record gives no demand figure for the metro, so the system-wide figures apply.

Riverside-San Bernardino-Ontario

Riverside and San Bernardino counties are served by SoCalGas; the 2026 report gives no demand or customer count for the two counties.5 Southwest Gas Corporation, a wholesale customer of SoCalGas, is also a gas provider, but the report gives no county for its California service, so its territory here is not shown.5 CPUC Energy Division staff describe SoCalGas's Southern Zone, which has no gas storage facilities, as including San Diego, Riverside and Imperial counties.3 The record gives nothing else local to this metro.

San Diego-Chula Vista-Carlsbad

San Diego County is served by SDG&E, which also serves the southern part of Orange County, so the figures here are for the SDG&E service area and not San Diego County alone: its core 1-in-35 extreme peak day demand for 2026 is 309 MMcf/d of the 3,171 MMcf/d in the 2026 California Gas Report's core table (by our calculation, 309 divided by 3,171, a share of core peak demand and not of customers), and its 1-in-10 cold day total for 2026 is 517 MMcf/d.5

CPUC Energy Division staff said SDG&E has a relatively low amount of linepack and does not allow much load variability without relying on the rest of the Southern Zone, which does not have direct access to underground storage, and that customers have a tendency to deliver less gas to the Southern Zone than they use in that region, which leads to periodic local shortages.3

Has Southern California had gas supply problems since 2020?

The record we reviewed documents capacity restrictions in 2025 and a storm-driven storage draw in January 2026; supply events from 2020 to 2024 are not shown here (see Notes). SoCalGas said in November 2025 that repair conditions found in late October 2025 on Transmission Lines 225 and 4000 severely restrict the Wheeler Ridge and Northern Zones, and that remediation delays beyond the posted end dates potentially impact its ability to serve the 1-in-10 year cold day.1 In January 2026 testimony SoCalGas said those simultaneous outages limited the Wheeler Ridge Zone to local demand of about 185 MMcf/d and Honor Rancho and La Goleta withdrawal to about 535 MMcf/d.4

CPUC Energy Division staff said SoCalGas announced in April 2025 that it would reduce the pressure on Lines 4000 and 4002 from July 1, 2025 through November 1, 2026, a 655 MMcf/d reduction in Northern Zone pipeline capacity, and announced in September 2025 that the reduction would end at midnight on September 5, 2025.3 California Energy Commission (CEC) staff said in October 2026 that those earlier reductions were associated with integrity management work and federal pipeline safety (PHMSA) compliance requirements.9 The October 2025 El Paso Natural Gas posting is described under winter and market context.1

During Winter Storm Fern in January 2026, SoCalGas reported withdrawing more than 8 Bcf from storage from January 23 through January 31, with storage supplying nearly 60 percent of system demand and Aliso Canyon about 30 percent of the gas delivered at the peak.9 CEC staff's November 2025 presentation listed, as its conclusion for SoCalGas, that it can meet demands without curtailment.6

How much spare gas capacity does Southern California have on the coldest day?

Pipelines supplying the Southern California area N Kern River Kern River SoCalGas transmission system SoCalGas transmission system SoCalGas transmission system SoCalGas transmission system Kern River Kern River El Paso Natural Gas El Paso Natural Gas El Paso Natural Gas El Paso Natural Gas SoCalGas transmission system SoCalGas transmission system Aliso Canyon Aliso Canyon Honor Rancho Honor Rancho La Goleta La Goleta Playa del Rey Playa del Rey Los Angeles Los Angeles San Diego San Diego Long Beach Long Beach Anaheim Anaheim Riverside Riverside Chula Vista Chula Vista San Bernardino San Bernardino Moreno Valley Moreno Valley Oceanside Oceanside Escondido Escondido Victorville Victorville Orange Orange Menifee Menifee Temecula Temecula Murrieta Murrieta Carlsbad Carlsbad Burbank Burbank El Cajon El Cajon Riverside County Riverside County San Bernardino County San Bernardino County San Diego County San Diego County I-15 I-10 I-10 I-5 I-8 I-8 I-40 CA 99 CA 14 CA 58 I-1D I-2D Clark County Clark County Inyo County Inyo County Kern County Kern County Mohave County Mohave County Tulare County Tulare County Yuma County Yuma County Pipelines supplying the Southern California area Other gas pipelines Highways Southern California metro area (5 counties) County lines Cities and towns Underground gas storage field named on this page
Figure 1. Major natural gas pipelines serving Southern California. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Atlas underground storage layer (2020). Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: Kern River; El Paso Natural Gas; SoCalGas transmission system.
  • Underground gas storage fields marked: Aliso Canyon; Honor Rancho; La Goleta; Playa del Rey.
  • Metro counties outlined (5): Los Angeles County; Orange County; Riverside County; San Bernardino County; San Diego County.
  • Cities and towns labeled include: Los Angeles; San Diego; Long Beach; Anaheim; Riverside; Chula Vista; San Bernardino; Moreno Valley.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

SoCalGas said the CPUC mandates two winter design standards: a 1-in-35 year peak day with all noncore customers assumed fully curtailed and forecast core demand of 3.06 BCFD (3,060 MMcf/d), and a 1-in-10 year cold day with service to core and noncore customers and forecast demand of 4.56 BCFD for winter 2025-26.1 Its Table 3 breaks the 1-in-10 demand into core including wholesale core 2,901, noncore non-electric generation 741 and noncore electric generation 921.1

Three documents state the peak day balance, with different figures because they use different assumptions and dates. The table gives each figure as its source states it.

Source and date 1-in-10 demand Flowing pipeline supply Storage withdrawal figure What the source states
SoCalGas winter assessment, November 6, 20251 4,563 2,922 (80% of 3,635, except California production at 70) 2,271 at the November 1 inventory; 1,401 at the end-of-January minimum for core reliability Expects sufficient capacity for both design standards
CPUC Energy Division Biennial Assessment, October 1, 20253 4,562 3,215 ratable supplies (staff model) 896 non-Aliso withdrawal capacity on February 15, 2026 (staff model) A withdrawal of 550 from Aliso Canyon is needed; staff recommend a smaller inventory limit
SoCalGas testimony, January 15, 20264 4,562 2,416 (SoCalGas assumptions) 1,974 January minimum available withdrawal at 68.6 Bcf at Aliso Canyon Supply shortfall of 172 at 68.6 Bcf, 333 at 58.6 Bcf; surplus of 112 at 86.2 Bcf

Peak day demand, supply and storage withdrawal figures for winter 2025-26, MMcf/d, whole SoCalGas and SDG&E system, each as stated by its source on its own date. The three sets use different pipeline outage and utilization assumptions and are not additive.

SoCalGas's November 2025 assessment says its monthly mass balance shows sufficient pipeline receipt capacity and storage inventory to serve all noncore demand without curtailment, and that the mass balance does not account for actual injection and withdrawal capabilities.1

In its testimony two months later SoCalGas said the Energy Division's assessment significantly understates the need for Aliso Canyon, and that the 1-in-10 day would need receipt point utilization of approximately 91% with Aliso Canyon at 68.6 Bcf, which it said may be achievable if customers respond to an operational flow order, and approximately 97% at 58.6 Bcf, which it called operationally unrealistic.4

The CPUC Energy Division staff said the 4,121 MMcf/d threshold set in Commission Decision D.24-12-076 represents the daily demand the system can serve without Aliso Canyon, and that the 1-in-10 peak day forecasts it takes from the 2024 California Gas Report are 4,489 MMcf/d for 2026-27, 4,435 for 2027-28 and 4,377 for 2028-29, each above the threshold; the 2025-26 forecast of 4,562 exceeds it by 441.3 The forecasts and comparisons are a staff analysis and a utility's position; neither is a Commission finding.

Using the November 2025 figures in the table above, flowing supply plus storage withdrawal capacity minus 1-in-10 demand is 630 MMcf/d, or 13.8% of the 1-in-10 demand (our calculation, illustrative and not a finding).8 With the end-of-January minimum-inventory withdrawal of 1,401 MMcf/d in place of 2,271, the same sum is a shortfall of 240 MMcf/d; that is SoCalGas's minimum-inventory condition, not a forecast, and SoCalGas's mass balance shows inventory well above it. SoCalGas said its system capacity is often less than the sum of its pipeline and storage supplies, so neither figure is a capacity finding.1

The 3,775 MMcf/d firm receipt capacity is stated in SoCalGas documents dated November 2025 and April 2026.1 The zone figures in Figure 20 of the 2026 California Gas Report (Northern 1,590, Wheeler Ridge 765, Southern 1,210, Coastal 150 and Line 85 60 MMcf/d) are dated October 2021 on the figure, and the two agree in total.5 SoCalGas's April 2026 summer assessment assumes 2.63 BCFD of storage withdrawal capacity and says it can serve the forecast summer peak day of 3.169 BCFD.2

The 2026 California Gas Report's own 1-in-10 cold day demand in its table row labeled 2026 is 4,758 MMcf/d across core, noncore and electric generation, 195 MMcf/d (4.3%) above the figure in SoCalGas's winter assessment, which used the 2024 report.5 The table does not name the winter that row covers, so the two figures may not be for the same winter. The difference is our calculation.8

What is driving new natural gas demand?

We found no documented new gas load with a service date in Los Angeles, Orange, Riverside, San Bernardino or San Diego County. The capacity documents forecast demand from customer and weather data and name no large new gas load inside the five counties.5

EIA's September 2026 generator inventory lists no planned natural gas-fired generator in Los Angeles, Orange or San Diego County and three 0.3 MW units in San Bernardino County, which are combined heat and power units at the University of Redlands planned for December 2030 without regulatory approvals started.712 A search of Federal Register notices of the Federal Energy Regulatory Commission (FERC) since January 1, 2025 found no pipeline notice naming any of the five counties.7

Data centers: As of October 29, 2026, we found no data center gas load in the five counties, and no gas-fired data center generator, fuel cell or pipeline lateral in EIA's inventory or FERC's notices.1213 In April 2026 the CPUC opened a rulemaking on electric rate design that includes data centers and other large loads; it concerns electric service and names no county.14

Inside the metros, and in the notices: The FERC notices we found since August 2026 that name SoCalGas are monthly offshore delivery service rate filings, and none names a county or a new gas load.13 EIA lists planned retirements in December 2026 of AES Alamitos units 3, 4 and 5 in Los Angeles County (310, 310 and 495 MW) and AES Huntington Beach unit 2 in Orange County (218 MW), and of Scattergood units 1 and 2 (163.2 MW each) in December 2029; these are electric generators.12

The Energia Costa Azul LNG terminal in Mexico is approved to export up to 425 MMcf/d, and SoCalGas said in April 2026 that the U.S. Department of Energy announced on March 20, 2026 an additional 6 months for it to finish construction; CPUC Energy Division staff said it was expected to increase competition for interstate pipeline capacity to Southern California; it is in Mexico, not part of the metros, and the record gives no filing-confirmed start date, so we do not treat it as a new load in the metros.3

Are upgrades arriving in time?

CPUC Energy Division staff said SoCalGas plans to increase the flow capacity at the Quigley Regulator Station prior to 2027, to drill additional wells at Honor Rancho by 2030, and that the Honor Rancho Compressor Station Modernization Project, updated in its most recent general rate case, is expected to be fully commissioned in 2027.3 The passages give no budget for the Quigley upgrade or the wells, so we treat them as plans, not scheduled fixes. The Honor Rancho compressor project has a schedule (construction from February 2026 to early 2029)11 but no budget or regulator approval in the record we reviewed, so we do not treat it as a scheduled fix. Staff said the three upgrades together reduce the need for Aliso Canyon and that the Quigley upgrade, planned before 2027, will reduce it; staff's model for winter 2030-31 shows no Aliso Canyon need if the upgrades are in service.3

SoCalGas's July 2026 fact sheet says construction of the Honor Rancho compressor project is underway on a schedule of February 2026 to early 2029, which differs from staff's 2027 commissioning statement.11

On the inventory limit, the Energy Division staff recommended reducing the Aliso Canyon maximum inventory by 10 Bcf to 58.6 Bcf, and added that given higher gas price forecasts for winter 2026-27 a smaller reduction or none may be appropriate; the adopted limit remains 68.6 Bcf.3 SoCalGas, in its application A.26-01-009, said the peak day can be met only if Aliso Canyon operates at 86.2 Bcf.4 The CPUC's decision on that application had not been issued in the records we reviewed.

Who gets gas first in a shortage?

SoCalGas said the CPUC's 1-in-35 year peak day standard assumes all noncore customers are fully curtailed, with service maintained to core customers, and that noncore customers are fully interruptible under its CPUC-approved tariff, Rule No. 23 for SoCalGas and Gas Rule No. 14 for SDG&E.12 The filings we reviewed do not include the tariff rules, so the interruption sequence and penalty terms are not shown.

Winter and market context

The most recent winter pipeline notice SoCalGas itself reported is El Paso Natural Gas posted a month-long delivery capacity impact at SoCal Ehrenberg in October 2025.1 CEC staff said that as of July 28, 2026 SoCalGas's Envoy site listed Line 3000 maintenance at Topock through October 30, 2026, Line 4002 Northern Zone maintenance through September 18, 2026 and Wheeler Ridge restrictions ending August 31, 2026.9 Postings by Kern River and SoCalGas's own bulletin board are not covered here, so notices on those systems are not shown. National and regional storage figures are in a note.18

Winter weather and NOAA's outlook

Heating degree days, a measure of how much heating the weather called for, are shown below for one station in each metro against the 1991-2020 normal. Each airport stands in for its metro, and NOAA's figures are probabilities for a three-month average, not a forecast of days.17

Los Angeles-Long Beach-Anaheim. Heating degree days at the Los Angeles International Airport station ran below normal in 2023-24 and 2025-26 and above it in 2024-25.15 NOAA's Climate Prediction Center outlook issued October 15, 2026 slightly favors above-normal temperatures for November 2026 to January 2027 and gives equal chances of above, near or below normal for December 2026 to February 2027.16

Riverside-San Bernardino-Ontario. Heating degree days at the Riverside Municipal Airport station ran below normal in each of the last three winters.15 NOAA's outlook is the same here: slightly above-normal favored for November 2026 to January 2027, equal chances for December 2026 to February 2027.16

San Diego-Chula Vista-Carlsbad. Heating degree days at the San Diego International Airport station ran above normal in 2023-24 and 2024-25 and below it in 2025-26.15 The same NOAA outlook slightly favors above-normal temperatures for November 2026 to January 2027 and gives equal chances for December 2026 to February 2027.16

Metro and station Winter (November to March) Heating degree days 1991-2020 normal Difference from normal
Los Angeles, Los Angeles International Airport 2023-24 901 967 -6.8%
Los Angeles, Los Angeles International Airport 2024-25 1040 967 7.5%
Los Angeles, Los Angeles International Airport 2025-26 519 967 -46.3%
Riverside-San Bernardino, Riverside Municipal Airport 2023-24 1103 1209 -8.8%
Riverside-San Bernardino, Riverside Municipal Airport 2024-25 1020 1209 -15.6%
Riverside-San Bernardino, Riverside Municipal Airport 2025-26 587 1209 -51.4%
San Diego, San Diego International Airport 2023-24 892 838 6.4%
San Diego, San Diego International Airport 2024-25 947 838 13.0%
San Diego, San Diego International Airport 2025-26 558 838 -33.4%

Heating degree days at three airport stations, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.

Policy context

The CPUC's page for its Long-Term Gas Planning Rulemaking (R.24-09-012) says the Commission is looking at how to facilitate gas decarbonization while supporting equity, safety, affordability, and reliability, and says gas demand is declining as the state pursues greenhouse gas goals. The page lists, as its most recent selected document, a ruling dated August 30, 2026 inviting comment on a staff proposal and an avoided costs template; the rulemaking is open.

What's new (as of October 29, 2026)

For all three metros, CEC staff said on October 22, 2026 that SoCalGas can meet its peak days without curtailing noncore customers, assuming about 3.0 Bcf per day of pipeline supply and storage withdrawals below 2,000 MMcf/d.9 In the Aliso Canyon inventory case, Sierra Club asked on August 20, 2026 for a 29 Bcf cut, and Indicated Shippers said on October 8, 2026 that Cal Advocates would keep the current limit.10 SoCalGas said on September 2, 2026 that construction had started on the Honor Rancho compressor project, which its July 2026 fact sheet schedules through early 2029.11

What should Southern California-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which service. Confirm whether each site takes core or noncore service from SoCalGas or SDG&E, and read the interruption terms in the current approved tariff.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track the CPUC's decision on SoCalGas's Aliso Canyon application and SoCalGas's winter 2026-27 technical assessment.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Southern California businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. SoCalGas expects to meet both design standards, while its January 2026 testimony projects a shortfall under its own assumptions. See 'How much spare gas capacity does Southern California have on the coldest day?'

Does SoCalGas have spare gas capacity on the coldest day?

SoCalGas expects to meet its 1-in-10 cold day, while CPUC staff say the day needs 550 MMcf/d from Aliso Canyon. The figures are system-wide and dated November 2025 and October 2025. See 'How much spare gas capacity does Southern California have on the coldest day?'

Why does Aliso Canyon matter to Los Angeles, Riverside-San Bernardino and San Diego?

One combined record covers all three metros. CPUC staff said flows from Aliso Canyon support demand variability in the Los Angeles basin, and the CPUC has not decided SoCalGas's application on the limit in the records we reviewed. See 'Are upgrades arriving in time?'

Is there newer receipt capacity data than the California Gas Report's Figure 20?

Yes. SoCalGas stated in November 2025 and April 2026 that it can receive up to 3,775 MMcf/d of flowing supply on a firm basis; Figure 20 in the 2026 report is dated October 2021 and sums to the same total. See 'How much spare gas capacity does Southern California have on the coldest day?'

Is a data center or power plant driving gas demand in these metros?

We found no data center gas load and no planned gas generator beyond three 0.3 MW units in San Bernardino County. SoCalGas did say the Energia Costa Azul LNG terminal in Mexico is approved to export up to 425 MMcf/d. See 'What is driving new natural gas demand?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Supply events affecting SoCalGas or SDG&E from 2020 to 2024. No official record we reviewed describes one.
  • How costs are split among customer classes, and the order and penalties for cutting off interruptible customers. SoCalGas's general rate case decision and its interruption rules are not covered here.
  • The CPUC's decision on the Aliso Canyon application.
  • The county of each pipeline and storage facility, and where Southwest Gas serves.
  • How Pacific region storage compares with its five-year average. The weekly table we used does not state it.
  • Whether large new gas loads are planned beyond what federal filings show. California air permit records, interconnection queue records and federal pipeline certificate filings are not covered here.

Notes

  1. SoCalGas, Winter 2025-26 Technical Assessment, November 6, 2025, pages 1 to 6 (Tables 1 to 5). Utility statements. ↩
  2. SoCalGas, Summer 2026 Technical Assessment, April 16, 2026, pages 2 and 4. Utility statements. ↩
  3. CPUC Energy Division, 2025 Aliso Canyon Biennial Assessment Report, October 1, 2025 (D.24-12-076; Investigation I.17-02-002), pages 5 to 26. Staff analysis, a recommendation and not a Commission decision. ↩
  4. SoCalGas, prepared direct testimony of Andrew J. Sawin, Chapter I, January 15, 2026, Aliso Canyon application A.26-01-009, pages 2 and 19 to 21 (the exhibit's printed page numbers AJS-2 and AJS-19 to AJS-21, which are PDF pages 4 and 21 to 23). Utility testimony, a party's position and not a finding; its assumptions differ from the Energy Division's. ↩
  5. 2026 California Gas Report (submitted July 1, 2026; updated August 3, 2026), SoCalGas copy: Tables 37, 38 and 52, Figure 20, the wholesale customer list and the Long Beach statement. Utility statements. The five counties are Los Angeles and Orange (Los Angeles-Long Beach-Anaheim), Riverside and San Bernardino (Riverside-San Bernardino-Ontario) and San Diego (San Diego-Chula Vista-Carlsbad), from the OMB Bulletin No. 23-01 delineation. ↩
  6. California Energy Commission staff presentation, November 12, 2025 business meeting, slide 5. ↩
  7. EIA-860M inventory for September 2026 (Planned sheet) filtered to the five counties by us, and a Federal Register search of Federal Energy Regulatory Commission notices since January 1, 2025 by county phrase, both our own calculation. A notice that spells a place differently would be missed. ↩
  8. Our calculations (illustrative, with formulas and unrounded values in our calculations workbook for this page; none is a regulator finding). The workbook also holds figures not used in the text: the Aliso Canyon withdrawal that staff's model needs is 12.1% of its 1-in-10 peak day demand, and SoCalGas's stated shortfalls of 172 and 333 MMcf/d are 3.8% and 7.3% of its 1-in-10 demand of 4,562 MMcf/d. The Energia Costa Azul export approval of 425 MMcf/d is 11.3% of the 3,775 MMcf/d firm receipt capacity and 9.3% of the 1-in-10 demand, shares of those figures and not of any load in the metros. ↩
  9. California Energy Commission, Winter 2026-2027 California Gas Reliability Assessment, staff report CEC-200-2026-017 (docket 22-OII-02, document TN 273190, docketed October 22, 2026). PDF page 41 (printed page 33, Conclusion: SoCalGas can meet peak-day demands without curtailment of noncore customers); PDF page 10 (printed page 2, the assumed 2,000 MMcfd withdrawal capability); PDF page 30 (printed page 22, the earlier Northern Zone pressure reductions and the Envoy maintenance list as of July 28, 2026); PDF pages 31 and 32 (printed pages 23 and 24, the 68.6 Bcf limit under Decision 23-08-050 and Winter Storm Fern withdrawals). Staff analysis, not a Commission decision. The Envoy listing is staff's description; we could not read the Envoy site. ↩
  10. Sierra Club, Direct Testimony of Tyson Siegele, Exhibit SC-01, August 20, 2026, application A.26-01-009, PDF page 7 (printed page 3, summary of recommendations); Indicated Shippers, Rebuttal Testimony of Brian C. Collins, Exhibit IS-02, October 8, 2026, PDF page 4 (printed page 2), which describes Cal Advocates' position and notes that SoCalGas served rebuttal testimony on September 17, 2026. These are parties' positions, not findings, and we did not read SoCalGas's rebuttal. ↩
  11. SoCalGas, Honor Rancho Compressor Modernization Project fact sheet, July 2026, page 1 (Project Overview: construction underway; Project Schedule: February 2026 to early 2029); SoCalGas newsroom release, "Santa Clarita City Council Recognizes SoCalGas for Honor Rancho Modernization Milestone," September 2, 2026. Utility statements. The documents place the project in the Santa Clarita Valley and give no county. ↩
  12. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026, filtered to the five counties by us. Planned sheet rows 2147 to 2149 (University of Redlands Energy Center, units TURB4 to TURB6, 0.3 MW each, December 2030, status "planned for installation, but regulatory approvals not initiated"). Operating sheet rows 545 to 547 (AES Alamitos units 3 to 5), 584 (AES Huntington Beach unit 2) and 695 and 696 (Scattergood units 1 and 2), with planned retirement years of 2026 and 2029. The filter also returned eleven Caltech Central units (0.1 MW each, listed as Other Natural Gas under a Bloom Energy 2009 PPA, planned retirement March 2031) and seven generators retired since 2024 in the five counties; all are electric generators. EIA lists no planned gas unit in Los Angeles, Orange or San Diego County; the inventory has no data center field, so a data center could be found only by plant name, and we found none. ↩
  13. Federal Register API search of Federal Energy Regulatory Commission notices published July 31 to October 29, 2026, run October 29, 2026, for the phrases Los Angeles County, Los Angeles Counties, Orange County California, Riverside County, San Bernardino County and San Diego County (singular and plural forms), Aliso Canyon, Costa Azul and Ehrenberg: no notice found. Notices naming SoCalGas: document 2026-17475 (August 27, 2026, docket PR26-77-000) and 2026-20420 (October 6, 2026, docket PR26-81-000), both offshore delivery service rate revisions. The El Paso Natural Gas and Transwestern project notices we read in the period (documents 2026-16237, 2026-19441 and 2026-18455) concerned El Paso County in Texas, Arizona and Doña Ana County in New Mexico; El Paso also filed a negotiated rate update for SoCal in August 2026 (document 2026-15976), a rate item. A notice that spells a place differently would be missed. ↩
  14. California Public Utilities Commission, Order Instituting Rulemaking on California Advanced Electric Rate Design, R.26-04-009, filed April 9, 2026, PDF page 1 (Senate Bill 57 and cost impacts of data center loads on electrical corporations) and page 10 (rate design options for data centers and other large load customers). An electric proceeding. Air permit records for data center generators and the CAISO and utility interconnection queues were not read; we could not save them. ↩
  15. NOAA Regional Climate Centers, ACIS StnData heating degree days (base 65 degrees F, November to March) and 1991-2020 normals, accessed October 29, 2026: Los Angeles International Airport (USW00023174), Riverside Municipal Airport (USW00003171) and San Diego International Airport (USW00023188). The percent difference is our calculation from the station's heating degree days and its normal. ↩
  16. NOAA Climate Prediction Center, seasonal temperature outlooks issued October 15, 2026 (November 2026 to January 2027 and December 2026 to February 2027), read from the shapefile archive seastemp_202610 at the three metros' locations by us; the probability shown for the favored category is the lower edge of NOAA's shaded band, and the middle category is near 33.3%. ↩
  17. NOAA Climate Prediction Center, seasonal outlook explanation (temperature), accessed October 28, 2026: an outlook gives probabilities for the three categories above, near and below normal over a season, and equal chances means no category is favored. ↩
  18. NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 precipitation outlook shows an elevated likelihood of above-normal seasonal precipitation amounts for much of California and the Southwest, a discussion of regions and not of counties (B1). The U.S. Energy Information Administration (EIA) said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average (A1). California is in EIA's Pacific storage region, whose working gas EIA's weekly report put at 297 Bcf for the week ending October 16, 2026 (report released October 22, 2026); the table read does not state a comparison with the five-year average (A2). EIA's California citygate price series, the nearest regional series EIA publishes for the metros, shows 2.98 dollars per thousand cubic feet for July 2026 and no value for April 2026, as of its September 30, 2026 release; commodity prices are never evidence of a capacity constraint (A3). ↩

Market and weather sources

Public web sources, as of October 25 and 26, 2026. They are kept separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. A2. U.S. Energy Information Administration, Weekly Working Gas in Underground Storage, release October 22, 2026 (Pacific region). Link
  3. A3. U.S. Energy Information Administration, California Natural Gas Citygate Price, monthly, release September 30, 2026. Link
  4. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link

Policy sources

Official public sources, as of October 26, 2026. They are kept separate from the regulatory record cited in the Notes.

  1. C1. The CPUC, Long-Term Gas Planning Rulemaking R.24-09-012 (web page). Link

Sources

  1. Southern California Gas Company, Winter 2025-26 Technical Assessment, November 6, 2025. Link
  2. Southern California Gas Company, Summer 2026 Technical Assessment, April 16, 2026. Link
  3. California Public Utilities Commission, Energy Division, 2025 Aliso Canyon Biennial Assessment Report, October 1, 2025. Link
  4. Southern California Gas Company, Prepared Direct Testimony of Andrew J. Sawin, Chapter I, Reliability Impacts, January 15, 2026. Link
  5. California gas utilities, 2026 California Gas Report (comprehensive edition), submitted July 1, 2026. Link
  6. California Energy Commission, Winter 2025-26 California Gas Reliability Assessment, staff presentation, November 12, 2025. Link
  7. California Energy Commission, Winter 2026-2027 California Gas Reliability Assessment, staff report CEC-200-2026-017, October 22, 2026. Link
  8. Sierra Club, Direct Testimony of Tyson Siegele, Exhibit SC-01, application A.26-01-009, August 20, 2026. Link
  9. Indicated Shippers, Rebuttal Testimony of Brian C. Collins, Exhibit IS-02, application A.26-01-009, October 8, 2026. Link
  10. Southern California Gas Company, Honor Rancho Compressor Modernization Project fact sheet, July 2026. Link
  11. California Public Utilities Commission, Order Instituting Rulemaking on California Advanced Electric Rate Design, R.26-04-009, April 9, 2026. Link
  12. NOAA Regional Climate Centers, ACIS StnData service. Link
  13. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  14. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  15. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  16. California Energy Commission, Winter 2026-2027 California Gas Reliability Assessment, staff report CEC-200-2026-017 (docket 22-OII-02, TN 273190). Link
  17. Southern California Gas Company, Newsroom: Santa Clarita City Council Recognizes SoCalGas for Honor Rancho Modernization Milestone, September 2, 2026. Link
  18. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, document 2026-17475, published August 27, 2026. Link
  19. Federal Register (FERC Combined Notice of Filings), Combined Notice of Filings, document 2026-20420, published October 6, 2026. Link

Corrected November 9, 2026: The outlook said no approved or scheduled fix is shown; it now says no fix is shown that removes the need before winter 2030-31, the winter for which staff's model shows no Aliso Canyon need if the three planned upgrades are in service. The Riverside-San Bernardino-Ontario section said nothing else in the record was local to the metro; it now notes that staff describe the Southern Zone as including Riverside County. SDG&E service is now stated as covering San Diego County and the southern part of Orange County. The five Southern California facilities whose county no official source gives (Aliso Canyon, Honor Rancho, La Goleta, Playa del Rey and the Quigley Regulator Station) are now shown as unclear rather than outside the metros; the outlook now says the Honor Rancho compressor project has no budget or approval in the record and so is not a scheduled fix, and that the Southern Zone and SDG&E reach into other metros is noted as context.