Washington natural gas case study, Seattle, Washington. November 2026
Seattle-Olympia natural gas: no system need until 2030-31; local needs lack a scheduled fix
PSE's 2023 plan shows no system-wide resource need before winter 2030-31 if pipeline contracts are renewed, but Bonney Lake (about 20,000 customers) and North Lacey (about 21,000) fall below design requirements on a peak day, with no scheduled fix.
Metro used: the Seattle-Tacoma-Bellevue, WA and Olympia-Lacey-Tumwater, WA metropolitan statistical areas, as delineated in OMB Bulletin No. 23-01 (July 21, 2023). Puget Sound Energy, Inc. (PSE) is the main gas distribution utility identified in the record. Its 2023 Gas Utility Integrated Resource Plan covers parts of six counties and gives supply figures for its whole system, not for either metro, so those figures are system-wide; its delivery system appendix names three area needs in the metro counties. Other gas utilities in the metro counties are not shown in the record.1
Key takeaways
- PSE plans for a 13 degree design peak day and forecasts whole-system base peak-day demand of 995 thousand Dth for 2024 and 1,043 thousand for 2030.2
- Both resource need dates, 2030-31 with pipeline renewals and 2025-26 without them, are whole-system statements, not figures for either metro.3
- The delivery system appendix lists three local needs with no approved or scheduled fix in the pages we reviewed: Bonney Lake, North Lacey and the marine crossing (about 13,000 customers).10
- Northwest Pipeline is PSE's only direct-connect pipeline; total firm capacity to the city gate, including storage redelivery, was 989,929 Dth per day as of November 2020.4
- PSE's portfolio shows pipeline renewals not made of 59 thousand Dth per day in 2024 and 142 thousand by 2030, tied to lower demand and other resources.5
- Woodfibre LNG in British Columbia will pull 300 thousand Dth per day from the Sumas hub, with concern about uncommitted gas there from 2027.6
- EIA lists no planned natural gas-fired generator in the metro counties, and our search since January 1, 2025 found one FERC pipeline notice naming two of them.23
What is the outlook for Seattle gas capacity through 2029?
Discovery Energy rates the outlook for natural gas capacity in the Seattle area and the Olympia-Lacey-Tumwater area through 2029 as Elevated (confidence: High): PSE's own delivery system plan says its high-pressure supply systems in the Bonney Lake area of Pierce County and the North Lacey area of Thurston County fall below design requirements on a peak demand event for existing loads. The pages we reviewed show no approved or scheduled fix for either, and the rating rests on these area records inside each metro. The system-wide supply plan shows no resource need before 2030-31 if pipeline contracts are renewed, a whole-system figure. Documented risk factors: none beyond the facts stated above. Three developments would change the assessment: PSE's Integrated System Plan due January 1, 2027, with any approved or scheduled fix, with a date and a budget, for the three local needs, and any new resource need date or decision to let pipeline contracts expire; PSE's renewal decisions for Northwest Pipeline capacity, including the November 2028 renewal offered for part of its Sumas capacity; Woodfibre LNG's start-up in 2027 and the supply available at the Sumas hub.
Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.
Who serves the Seattle and Olympia areas?
PSE is the one gas utility the record names in these counties. Its plan says its gas service territory includes parts of King (not Enumclaw), Kittitas (not Ellensburg), Lewis, Pierce, Snohomish and Thurston counties, so parts of the three Seattle metro counties and of Thurston County, the Olympia metro's one county, are inside the two metros, and Kittitas and Lewis counties are outside both metros.1
| Where | Item in PSE's plan |
|---|---|
| Inside the Seattle metro | Parts of King, Pierce and Snohomish counties in PSE's gas territory; the Bonney Lake study area (Pierce County); the marine crossing serving the Gig Harbor peninsula (Pierce County) and Vashon/Maury Island (King County) |
| Inside the Olympia-Lacey-Tumwater metro | The part of Thurston County in PSE's gas territory; the North Lacey study area (Lacey and the north and east Olympia areas) |
| Outside both metros, system context | Kittitas and Lewis counties in PSE's gas territory; PSE's system-wide peak day, resource need and pipeline capacity; Woodfibre LNG and the Sumas hub in British Columbia |
| Unclear | Other gas utilities in the metro counties; the town-level split of PSE's territory |
PSE's gas territory and system-wide figures, by whether they fall inside the Seattle or Olympia metro (OMB delineation). Source: 2023 Gas Utility Integrated Resource Plan, About PSE, Chapter Six and Appendix G.110
The plan gives no peak-day figure for King, Pierce, Snohomish or Thurston County alone, so its system-wide figures are the most local the record has for supply and the design day; for the delivery system it names area needs, set out in the next section. Jackson Prairie storage and the Sumas hub sit outside both metros, while parts of Northwest Pipeline are inside the metro counties; all of them matter because they feed the system that serves them.22
What local needs does PSE's delivery system plan show?
PSE's delivery system planning appendix lists three projects in the initiation phase, each with a date needed of "Existing" or "Current", and says it has no major backbone projects in the implementation phase. It describes the end of the initiation phase as the point where senior management approves a project for funding.10 Two are in the Seattle metro's counties; the third, North Lacey, is in the Olympia metro and has its own section below.
| Area | County | Customers | Need date | What PSE said | Fix in the pages we reviewed |
|---|---|---|---|---|---|
| Bonney Lake Reinforcement (Lake Tapps and South Prairie) | Pierce | About 20,000 | Existing; identified 2008 | The high-pressure supply system is undersized and falls below design requirements on a peak demand event for existing loads; three cold weather actions are scheduled along with 100 percent curtailments | Neither approved nor scheduled: study of pipeline and non-pipe solutions expected to finish in early 2023; no solution, date or budget |
| Gas Reliability Marine Crossing | King (Vashon/Maury Island) and, by general geography, Pierce (Gig Harbor peninsula) | About 13,000 in the 2023 plan (a 2026 rate case exhibit says about 14,000) | Current; identified 2018 | The crossing is the only gas pipeline supply to the area and is nearing the end of its service life; the supply system cannot meet minimum design requirements should the lateral exceed its fatigue limits | Neither: an emergency backup supply plan was to be enabled in 2023; no long-term solution, date or budget |
Local needs in PSE's 2023 delivery system plan, metro counties, by fix status under Discovery Energy's outlook scale (approved: a regulator has approved it; scheduled: in the filed plan with a date and a budget; neither). Source: Appendix G, sections 3.4.1 and 3.4.3.10
PSE said the cold weather actions it has scheduled for Bonney Lake, along with 100 percent curtailments, are markedly insufficient to address the reliability concerns. The plan does not say which customers would be curtailed, so this page does not treat it as a curtailment of firm customers. The marine crossing item is a condition, a lateral exceeding its fatigue limits, not a projected shortfall, and PSE's Gig Harbor LNG facility supplements supply to the area at peak.10
The appendix is part of the 2023 plan, which PSE's Integrated System Plan due January 1, 2027 replaces. Our search for any approval, date or budget for the Bonney Lake project after March 2023 found none (note 11), and the 2026 rate case exhibit we reviewed names no North Lacey project (note 16); a later approval or budget would change the fix status.10 The marine crossing is different, because a Resiliency Project is in progress; see 'Are upgrades arriving in time?'.16
What does PSE's plan show for Olympia-Lacey-Tumwater?
The Olympia-Lacey-Tumwater metro is Thurston County, which is inside PSE's gas territory. PSE's delivery system appendix lists the North Lacey Reinforcement there, covering Lacey and the north and east Olympia areas, with a date needed of "Existing" and a need identified in 2009; PSE said the current high-pressure supply system is undersized and falls below current design requirements during a peak demand event for existing gas loads.10
| Area | County | Customers | Need date | What PSE said | Fix in the pages we reviewed |
|---|---|---|---|---|---|
| North Lacey Reinforcement (Lacey and the north and east Olympia areas) | Thurston | About 21,000 | Existing; identified 2009 | The high-pressure supply system is undersized and falls below design requirements on a peak demand event for existing loads; two cold weather actions are scheduled along with 100 percent curtailments | Neither approved nor scheduled: detailed needs assessment and alternatives review expected in 2023; no solution, date or budget |
Local need in PSE's 2023 delivery system plan, Olympia-Lacey-Tumwater metro, by fix status under Discovery Energy's outlook scale. Source: Appendix G, section 3.4.2.10
PSE said the two cold weather actions scheduled for North Lacey are markedly insufficient; as for Bonney Lake, the plan does not say which customers would be curtailed, so this page does not treat it as a curtailment of firm customers.10 PSE expected to complete the detailed needs assessment and alternatives review in 2023, and the pages we reviewed give no selected solution, date or budget. The need has the same wording, utility, record and status as Bonney Lake, so the Olympia-Lacey-Tumwater metro is rated with the Seattle area.
How much spare gas capacity does Seattle have on the coldest day?
In words: what the map shows
- Pipelines labeled: Northwest Pipeline.
- Compressor stations marked: Sumner.
- Underground gas storage fields marked: Jackson Prairie.
- Metro counties outlined (4): King County; Pierce County; Snohomish County; Thurston County.
- Cities and towns labeled include: Seattle; Tacoma; Bellevue; Kent; Everett; Renton; Federal Way; Yakima.
- Other gas pipelines in the area are drawn in gray and are not labeled.
- Highways are drawn for orientation. A small state locator map sits in a corner.
PSE said it plans supply to meet firm loads on a 13 degree design peak day. For its whole system PSE's base forecast puts peak-day demand at 995 thousand Dth in 2024 and 1,043 thousand in 2030.2
PSE reported its capacity with Northwest Pipeline, its only direct-connect pipeline, as of November 2020.4
| Firm capacity to PSE's city gate | Dth per day |
|---|---|
| Northwest Pipeline TF-1, from the Westcoast interconnect at Sumas | 287,237 |
| Total year-round TF-1 transportation | 542,872 |
| Storage redelivery from Jackson Prairie | 447,057 |
| Total firm capacity to the city gate | 989,929 |
PSE's firm pipeline capacity as of November 2020, whole system, Dth per day, per PSE. Source: 2023 Gas Utility Integrated Resource Plan, Appendix E, Table E.1.4
PSE said that in its zero-growth demand forecast it has sufficient firm resources to meet peak day need throughout the study period if it automatically renews existing pipeline contracts, and that in the mid demand forecast the first resource need occurs in the winter of 2030-31 on the same assumption. Without pipeline renewals, PSE said, the need arises in the winter of 2025-26.3 PSE said its Northwest Pipeline contracts have automatic annual renewal provisions that PSE can cancel on one year's notice.4
PSE's resource figures are shown in charts, and the plan's text does not total its on-system peaking capacity against the design day, so the record we reviewed does not show a reserve margin for the coldest day; none is estimated here.
What is driving new natural gas demand?
PSE's plan forecasts demand for its whole system from customer counts and weather and does not name a large new gas load inside the three counties. A search of other official records found no further documented gas load there, and EIA's September 2026 generator inventory lists no planned natural gas-fired generator there.8
Our Federal Register search since January 1, 2025 found one notice of the Federal Energy Regulatory Commission (FERC) that names metro counties (Snohomish and Pierce) for a pipeline project, Northwest Pipeline's Huntingdon Connector, listed in note 23; it ties the project to no gas load and to no utility's system.23
Data centers: As of October 29, 2026, we found no data center gas load in King, Pierce, Snohomish or Thurston County. PSE told an April 2, 2026 symposium that its 2025 large load requests of more than 20 MW equaled almost 50% of its current peak load, driven by data centers, tech campuses, manufacturing and multi-family developments; the slide concerns its electric system and names no gas load or county.14 EIA's September 2026 inventory lists no planned or recent gas-unit retirement or addition in the four counties, and no FERC notice published from July 31 to October 29, 2026 names any of them.15
Nearby: Woodfibre LNG, an export project in British Columbia, will pull 300 thousand Dth per day out of the Sumas market hub using previously acquired firm capacity, PSE said, and there is growing concern over the availability of uncommitted gas at Sumas when Woodfibre starts up in 2027; PSE sources part of its supply at Sumas.6
Are upgrades arriving in time?
For the supply plan, PSE's plan does not show a resource need inside the three heating seasons this page covers if pipeline contracts are renewed, and PSE said it is not studying pipeline expansion projects in its 2023 plan because, among other reasons, it has sufficient capacity on the Northwest and Westcoast pipelines.7 For the local delivery needs above, the 2023 plan shows no fix that is approved or scheduled: PSE's projects for Bonney Lake, North Lacey and the marine crossing are in the initiation phase, with no funding approval, date or budget in the pages we reviewed.10
PSE's February 27, 2026 rate case exhibit says a Resiliency Project to address the risk of failure of the marine crossing is in progress, and that more than 12 sites need cold weather actions; it names no Bonney Lake or North Lacey project.16
For the resource plan, PSE's near-term priorities (2024 to 2029) include acquiring Plymouth liquefied natural gas capacity rights and 15 thousand Dth per day of deliverability on Northwest Pipeline, and its long-term priorities (2030 to 2050) include reducing transport pipeline capacity contracts when the gas sales portfolio becomes surplus from decreasing loads.5 Its preferred portfolio shows 59 thousand Dth per day of pipeline renewals not made in 2024, rising to 142 thousand by 2030.5
The Washington Utilities and Transportation Commission (UTC) docket for the plan, UG-220242, shows an open meeting on June 26, 2023 and does not show a Commission approval of the plan.9
Winter and market context
NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 temperature outlook favors above-normal temperatures for, among other areas, the northern tier from the Pacific Northwest eastward, a discussion that names regions and not counties.B1 National inventory, El Nino and liquefied natural gas export figures do not bear on PSE's system and sit in a note.21
Northwest Pipeline posted a notice on March 12, 2026 saying PSE, the operator of Jackson Prairie storage, had reported a malfunctioning component that prevented injections, and it declared a Stage II (8%) underrun entitlement for parties north of its Kemmerer compressor station from March 14, 2026; PSE's plan counts storage redelivery from that facility in its firm capacity.17 We did not find a notice saying when the entitlement ended.
Winter weather and NOAA's outlook
Seattle. Heating degree days, a measure of how much heating the weather called for, were below the 1991-2020 normal at the Seattle-Tacoma airport station in 2023-24 and 2025-26 and above it in 2024-25.18 NOAA's Climate Prediction Center outlook issued October 15, 2026 gives the Seattle area at least a 50% chance of above-normal temperatures for November 2026 to January 2027 and for December 2026 to February 2027.19 The airport is one station standing in for the metro, and NOAA's figures are probabilities for a three-month average.20
Olympia. Heating degree days at the Olympia airport station were below the normal in all three winters.18 NOAA gives the Olympia area the same at least 50% chance of above-normal temperatures for both periods.19 That airport is one station standing in for the metro, not the metro itself.20
| Winter (November to March) | Seattle-Tacoma airport: degree days | Normal | Difference | Olympia airport: degree days | Normal | Difference |
|---|---|---|---|---|---|---|
| 2023-24 | 3055 | 3098 | -1.4% | 3168 | 3580 | -11.5% |
| 2024-25 | 3215 | 3098 | +3.8% | 3449 | 3580 | -3.7% |
| 2025-26 | 2906 | 3098 | -6.2% | 3271 | 3580 | -8.6% |
Heating degree days at the Seattle-Tacoma and Olympia airport stations, base 65 degrees F, against the 1991-2020 normal. Source: NOAA Regional Climate Centers.
What's new (as of October 29, 2026)
Northwest Pipeline, PSE's only direct-connect pipeline, extended maintenance at its Mt. Vernon compressor station in Skagit County through September 29, 2026 and scheduled work at its Sumner compressor station in Pierce County from October 5 through October 7, 2026; the notices do not say whether deliveries to PSE were affected.12 On October 1, 2026 it filed non-conforming service agreements, including one naming Puget, to take effect November 1, 2026 (FERC docket RP27-2-000); the notice gives no terms.13
What should Seattle-area facilities check now?
- Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
- Which service. Confirm whether each site takes firm or interruptible service from PSE, and read the interruption terms in the current approved tariff.
- Your area. If a site is in the Bonney Lake, Lake Tapps or South Prairie area of Pierce County, in the Lacey or north or east Olympia area of Thurston County, or on the Gig Harbor peninsula or Vashon/Maury Island, ask PSE about the status of the local reinforcement and its cold weather action plans.
- Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
- Upcoming proceedings. Track PSE's Integrated System Plan due January 1, 2027, and any notice about its pipeline contract renewals.
What to check in your contracts
| Area | What to check |
|---|---|
| Winter price spikes | Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes. |
| Delivery constraints | Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first. |
| Operational flow orders | What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you. |
| Expansion plans | Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date. |
Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.
Frequently asked questions
Will Seattle businesses face natural gas shortages this winter?
The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does Seattle have on the coldest day?'
Does Puget Sound Energy have spare gas capacity on the coldest day?
The plan's text does not total PSE's peaking resources, so the record we reviewed does not show a reserve margin. See 'How much spare gas capacity does Seattle have on the coldest day?'
What would happen if PSE did not renew its pipeline contracts?
PSE said that if no pipeline renewals are assumed, its need arises in the winter of 2025-26. See 'How much spare gas capacity does Seattle have on the coldest day?' for the contracts' automatic renewal and PSE's one year's notice.
Did the Washington UTC approve PSE's gas plan?
The UTC docket UG-220242 shows an open meeting on June 26, 2023 and does not show an approval. PSE's Integrated System Plan due January 1, 2027 replaces the gas plan. See 'Are upgrades arriving in time?'
Is a data center or power plant driving gas demand in Seattle?
The record does not show one. PSE did say Woodfibre LNG in British Columbia will draw on the Sumas hub from 2027. See 'What is driving new natural gas demand?'
Are there local gas capacity needs in the Seattle and Olympia areas?
PSE's 2023 delivery system plan lists Bonney Lake, North Lacey and the Gig Harbor and Vashon marine crossing as needs with no approved or scheduled fix in the pages we reviewed, and did not say which customers would be curtailed. See 'What local needs does PSE's delivery system plan show?'
Related case studies
Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.
- Portland area natural gas capacity case study (outlook: Elevated)
- Spokane natural gas capacity case study (outlook: Stable)
- Boise natural gas capacity case study (outlook: Watch)
- Salt Lake City area natural gas capacity case study (outlook: High)
All gas capacity ratings by U.S. metro
Background for commercial and industrial energy buyers: Utility cost intelligence
Understand your capacity exposure
Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.
Schedule a reviewWhat this page does not cover
- Whether PSE has had supply events since 2020. PSE's plan describes a 2018 Westcoast rupture and a February 2019 storage compressor failure, both before 2020, and we can't confirm a later event from an official record.
- How PSE splits costs among customer classes, and its interruption order. The gas tariff is not covered here.
- Whether Cascade Natural Gas or another utility serves part of the metro. The record we reviewed does not say.
- What the 2023-2028 and 2028+ columns in the plan's Table E.1 mean. The table text does not say whether they mark contract expiry.
- Whether the Bonney Lake, North Lacey or marine crossing projects face court, permit or schedule problems. We found no court docket, permit denial or documented delay for them.
- Whether any data center in the four counties has a gas load. We found none in the records we reviewed.
Notes
- Puget Sound Energy, 2023 Gas Utility Integrated Resource Plan, Chapter Book, PDF 3 (About PSE); Washington UTC docket UG-220242. Utility statement. The metro counties are King, Pierce and Snohomish (Seattle-Tacoma-Bellevue, WA) and Thurston (Olympia-Lacey-Tumwater, WA), from the OMB Bulletin No. 23-01 delineation; the classification of each county is our own work. ↩
- Same plan, Chapter Six, PDF 107 (design peak day) and Chapter Five, PDF 85 (Table 5.5, base forecast). Utility statements. ↩
- Same plan, Chapter Six, PDF 107 and PDF 108. ↩
- Same plan, Appendix Book, Appendix E, PDF 177 to 181 (Tables E.1 and E.2 and notes), capacity as of November 1, 2020. Shares calculated by us and not used in the text (illustrative): the TF-1 capacity in the table column headed 2023-2028 is 18.85% of the 2024 base design day and 18.95% of total firm capacity to the city gate. ↩
- Same plan, Chapter One, PDF 18 (Table 1.1) and Chapter Two, PDF 22. ↩
- Same plan, Chapter Six, PDF 111. ↩
- Same plan, Chapter Six, PDF 107 (recommendations). ↩
- EIA-860M inventory for September 2026 (Planned sheet, operator-reported planned dates), filtered to King, Pierce and Snohomish counties by us, and a Federal Register search of FERC notices since January 1, 2025 by county phrase, both our own calculation. Our first search used the singular form (for example "Pierce County") and missed notices that name counties in the plural; a second search of the plural forms found the notice in note 23. A notice that spells a place differently would still be missed. ↩
- Washington Utilities and Transportation Commission, docket UG-220242 document list, accessed October 25, 2026. ↩
- Same plan, Appendix Book, Appendix G (Delivery System Planning): section 2.3, PDF 248; section 3.2.5, PDF 253; sections 3.4.1 to 3.4.3 and Table G.3, PDF 254 to 257. Utility statements as of March 2023. The county placement of Bonney Lake and the Gig Harbor peninsula, and of Lacey and Olympia, is general geography, not a quotation. Their status after March 2023 was searched by us (note 11). ↩
- Our search on October 26, 2026 for any approval, date or budget for these projects after March 2023: the pages of UTC dockets UG-230807, UG-220242 and PG-170423, PSE's 2023 IRP, IRP, projects and pending filings pages, and 348 PDFs listed on the UTC docket pages (the eight UG-230807 filings and 340 PSE testimony and exhibit files of 25 MB or less in PSE's 2024 general rate case, UG-240005), for the terms Bonney Lake, Lake Tapps and South Prairie. It found no funded fix, date or budget (four hits in the PDFs: an electric submarine cable table and three map labels). It did not search larger files, other dockets or PSE's capital budget documents, and the Integrated System Plan is not yet filed.
- Northwest Pipeline LLC informational postings, from Northwest Pipeline's own posting site (northwest.williams.com), accessed October 29, 2026: Northwest Notice 26-195, posted September 23, 2026 (Mt Vernon Outage Extended Clarification), which extends work at the Mt. Vernon compressor station, Skagit County (MP 1440.18), from September 10 through September 29, 2026, with the station limited to 1,113,000 Dth per day southbound; and Northwest Notice 26-204, posted October 1, 2026, which schedules work at the Sumner compressor station, Pierce County (MP 1351.64), from October 5 to October 7, 2026, with the station limited to 872,000 Dth per day southbound. Neither notice says whether deliveries to PSE were affected. PSE said Northwest Pipeline is its only direct-connect pipeline (2023 Gas Utility Integrated Resource Plan, Appendix Book, Appendix E, PDF 177 to 181). ↩
- Federal Energy Regulatory Commission, Combined Notice of Filings, Federal Register document 2026-20747, published October 9, 2026, docket RP27-2-000 (Northwest Pipeline LLC, Sec. 4(d) rate filing, filed October 1, 2026: non-conforming service agreements for Idaho Power, Questar and Puget, effective November 1, 2026). The notice does not further identify "Puget" and gives no terms, and we did not read the filing itself. ↩
- Puget Sound Energy, "Data Centers: The Opportunity, The Risk, and The Reality," presentation of April 2, 2026 (Eleanor Ewry, Manager, Transmission Strategy and Planning), slide 4 (PDF page 4), accessed October 29, 2026. It concerns electric large loads (requests of more than 20 MW, spread across PSE's electric service territory) and names no county, site or gas volume. ↩
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026 (Operating, Planned and Retired sheets), filtered by us to King, Pierce, Snohomish and Thurston counties, Washington: no planned natural gas unit and no gas unit retired since 2024; existing gas units there (for example Frederickson in Pierce County) are not new loads. Federal Register search of Federal Energy Regulatory Commission notices published July 31 to October 29, 2026 for each county phrase, accessed October 29, 2026: no results; a place spelled differently would be missed. ↩
- Puget Sound Energy, Exh. MLV-12 (eleventh exhibit to the prefiled direct testimony of Michelle L. Vargo, February 27, 2026), Washington UTC dockets UE-260005 and UG-260006 (2026 general rate case), PDF page 4 (Business Need) and PDF page 3 (spending authorization CSA0127, created February 10, 2023, a Pipeline Mod: System Reliability program with amounts by fiscal year; the approval history on PDF page 7 ends May 22, 2025). The exhibit says the Resiliency Project addresses the risk of failure of the marine crossing serving about 14,000 customers, and that PSE has more than 12 sites identified for cold weather actions; the sites are not named, and our search of all 25 pages found no mention of Bonney Lake, Lake Tapps, South Prairie or Lacey. The approvals shown are the company's own, not a regulator's, and the exhibit gives program-level amounts, not a project budget, so we did not change the fix status in the tables from the 2023 plan. ↩
- Northwest Pipeline LLC informational posting, Northwest Notice 26-038, March 12, 2026 (critical notice; unplanned maintenance at Jackson Prairie and declared entitlement), from Northwest Pipeline's own posting site (northwest.williams.com), accessed October 29, 2026: PSE "has notified Northwest of a malfunctioning component at JP Storage currently preventing injection capability"; the notice describes an injection limit, not a withdrawal limit. PSE's plan lists 447,057 Dth per day of Jackson Prairie storage redelivery in its firm capacity (Appendix Book, Appendix E, Table E.1, PDF 177 to 181). ↩
- NOAA Regional Climate Centers, ACIS station data, heating degree days, base 65 degrees F, November to March, against the 1991-2020 normal, accessed October 29, 2026. Seattle-Tacoma airport station (USW00024233): 3,055 in 2023-24 against a normal of 3,098 (-1.4%), 3,215 in 2024-25 (+3.8%) and 2,906 in 2025-26 (-6.2%). Olympia airport station (USW00024227): 3,168 in 2023-24 against a normal of 3,580 (-11.5%), 3,449 in 2024-25 (-3.7%) and 3,271 in 2025-26 (-8.6%). ↩
- NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026 (shapefile download, accessed October 29, 2026). For both the Seattle and Olympia areas: November 2026 to January 2027 and December 2026 to February 2027 each favor above-normal temperatures, with at least a 50% chance of above-normal, about 33.3% of near-normal and no more than 16.7% of below-normal (the lower edge of NOAA's shaded probability band for the favored category). ↩
- NOAA Climate Prediction Center, explanation of the seasonal temperature outlook (erf_info page), accessed October 28, 2026: the outlook gives probabilities for a three-month average, and the middle category stays at 33.33%. ↩
- NOAA's Climate Prediction Center said on October 15, 2026 that the probability of at least a strong El Nino continuing through January to March 2027 is 80%. The U.S. Energy Information Administration said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average, and that prolonged periods of cold weather could increase withdrawals beyond its forecast; it lists U.S. liquefied natural gas gross exports of 15 billion cubic feet per day in 2025, 18 in 2026 and 19 in 2027. These are national and regional facts, not statements about PSE's system. ↩
- Same plan, Appendix Book, Appendix E, PDF 177 to 181: Northwest Pipeline is PSE's only direct-connect pipeline, and Jackson Prairie storage redelivery is part of its firm capacity to the city gate; Chapter Six, PDF 111, on supply at the Sumas hub. ↩
- Federal Register, Federal Energy Regulatory Commission, Northwest Pipeline LLC, Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, document 2026-04357, published March 5, 2026, pages 10805 and 10806 (docket CP26-94-000): Northwest filed on February 19, 2026 a prior notice request for facilities at its Sumas, Mt. Vernon, Snohomish and Sumner compressor stations, including uprates of compressor unit 9 at Sumas and unit 2 at Snohomish from 13,000 to 15,900 horsepower; the facilities are "located in Whatcom, Skagit, Snohomish, and Pierce Counties, Washington (Huntingdon Connector Project)", which would provide 77,999 Dth per day of incremental firm transportation from Sumas to three existing delivery points along the I-5 corridor, at an estimated cost of $26,454,114; protests were due May 1, 2026. Snohomish and Pierce are metro counties. The notice names no shipper, no utility and no gas load, and we did not read the filing itself. ↩
Market and weather sources
Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.
- A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
- A2. U.S. Energy Information Administration, Short-Term Energy Outlook, October 2026 (natural gas storage). Link
- B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩
Sources
- Puget Sound Energy, 2023 Gas Utility Integrated Resource Plan, Chapter Book. Link
- Puget Sound Energy, 2023 Gas Utility Integrated Resource Plan, Appendix Book. Link
- Washington Utilities and Transportation Commission, docket UG-220242 (Puget Sound Energy's 2023 Gas Integrated Resource Plan). Link
- Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
- U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
- Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
- Puget Sound Energy (presentation to the Northwest Energy Systems Symposium, posted by the University of Washington), Data Centers: The Opportunity, The Risk, and The Reality, April 2, 2026. Link
- Northwest Pipeline LLC (own informational postings), Northwest Notice 26-195, September 23, 2026 (Mt Vernon Outage Extended Clarification). Link
- Northwest Pipeline LLC (own informational postings), Northwest Notice 26-204, October 1, 2026 (Sumner Cyclone Filter Removal and other maintenance). Link
- Federal Energy Regulatory Commission (Federal Register notice), Combined Notice of Filings, Federal Register document 2026-20747, October 9, 2026. Link
- Puget Sound Energy (exhibit in Washington UTC dockets UE-260005 and UG-260006), Exh. MLV-12, eleventh exhibit to the prefiled direct testimony of Michelle L. Vargo, February 27, 2026. Link
- Northwest Pipeline LLC (own informational postings), Northwest Notice 26-038, March 12, 2026 (Jackson Prairie unplanned maintenance and underrun entitlement). Link
- NOAA Regional Climate Centers (ACIS web service), Monthly heating degree days base 65F and 1991-2020 normals, station USW00024233 (Seattle-Tacoma airport). Link
- Federal Energy Regulatory Commission (Federal Register), Federal Register document 2026-04357, 2026-03-05. Link
Corrected November 9, 2026: the earlier version said our Federal Register search found no pipeline notice naming the metro counties; it found one notice, for Northwest Pipeline's Huntingdon Connector, naming Snohomish and Pierce Counties. It also said our search found no approval, date or budget for the local projects without excluding the marine crossing, where a Resiliency Project is in progress, and it said no resource need falls inside the three heating seasons without the condition that pipeline contracts are renewed.