Michigan natural gas case study, Detroit and Grand Rapids, Michigan. November 2026

Detroit-area natural gas capacity: no spare supply shown on the main utility's coldest day

DTE Gas told the Michigan Public Service Commission in February 2026 that on its January 2027 peak day supply equals requirements, with none unallocated, and storage processing equipment is forecast at maximum capacity; about 63% of supply is from storage.

0%DTE Gas's January 2027 peak day margin; supply equals the 2,507 MMcf (million cubic feet) per day requirement
1,497 MMcf per dayDTE Gas's January design day load (coldest planned day), Detroit/Ann Arbor area, of 2,498 MMcf per day system-wide
63%Share of DTE Gas's January 2027 peak day supply that will come from storage, company-wide
0Planned natural gas-fired generators in the six metro counties in EIA's September 2026 inventory

Metro used: the Detroit-Warren-Dearborn, MI metropolitan statistical area and the Grand Rapids-Wyoming-Kentwood, MI metropolitan statistical area, as the federal government defined them on July 21, 2023. The tariffs of DTE Gas Company (DTE Gas) and Consumers Energy Company (Consumers Energy) each name places in these counties, and SEMCO Energy Gas Company (SEMCO) names Port Huron.1 Only DTE Gas's tariff names the principal cities of the Grand Rapids metro, so that metro is added on the DTE Gas record.10

Key takeaways

  • The testimony covers DTE Gas's whole system and does not name which storage fields run at their limit. Redundant units do not exist at all storage fields.3
  • The filing prints no margin line; the margin is our calculation from the plan's own supply and requirements.3
  • The Detroit/Ann Arbor load area is wider than the metro because it includes Ann Arbor.2
  • Consumers Energy's figures are system-wide, and the record does not show how much serves the metro. Its public Exhibit A-33 shows supply equal to load.6
  • The Commission's September 10, 2026 order disallowed $6 million for a Belle River turbine exchange on timing; DTE Gas said running the turbine past 30,000 hours raises forced-outage risk.7

What is the outlook for Detroit gas capacity through 2029?

Discovery Energy rates the outlook for Detroit-area and Grand Rapids natural gas capacity through 2029 as High (confidence: Medium): DTE Gas's own design day plan shows a 0% margin on its January 2027 peak day, below the 5% reserve we treat as thin, and the plan leans on storage, with processing equipment at critical storage fields forecast to run at maximum capacity and no redundant units at all fields.3 We found no capacity addition with a date and a budget, and DTE Gas renewed some pipeline capacity only through October 31, 2028.4 Two documented risks, listed next, add to that concern. Documented risk factors: concentration, meaning DTE Gas said a single storage field can account for up to 35% of total system demand on a design day and that processing equipment at critical storage fields is forecast to run at maximum capacity without redundant units at all fields; the field is not named and the 35% is an upper bound. Expiring supply: DTE Gas renewed 50 MDth per day of ANR Southwest capacity and 17.5 MDth per day of winter Vector Alliance capacity only through October 31, 2028, which is 16.9% of its planned winter firm transportation, by our calculation, above the 10% we treat as a large share for a single contract. No replacement is decided in the record we reviewed. We did not count the storage share and the St. Clair County storage fields described above as a separate risk. Three developments would change the assessment: DTE Gas's next gas cost recovery plan and its updated design day plan, including any change to the statement that storage processing equipment is at maximum capacity; any DTE Gas project to add redundant processing or storage deliverability and the Commission's action on it, and the end of the renewed pipeline capacity; Consumers Energy's next peak day design exhibits, or a utility figure that allocates supply and storage to the metro.

Outlook levels, from least to most concern: Stable, Watch, Elevated, High, Severe. Levels describe the public record of capacity and supply risk; confidence is reported separately. They are qualitative assessments, not forecasts of outages.

Who serves the Detroit and Grand Rapids areas?

The record names places in both metros but does not show which utility serves which place, and most supply figures cover a whole utility system.

DTE Gas's tariff territory sheets (issued in 2013) name many Wayne County places and some townships in Oakland, Macomb and Livingston counties, and none in Lapeer or St. Clair counties. Consumers Energy's sheets (issued in 2019) list places in all six metro counties, including Warren, Sterling Heights, Southfield, Troy and Pontiac. SEMCO says it delivers gas in and around Port Huron.1

Inside the Detroit metro are DTE Gas's Belle River, Columbus and West Columbus storage fields in St. Clair County, and the places named in the two tariffs in the six counties.3 Inside the Grand Rapids metro are the places named in the two tariffs in its five counties, plus DTE Gas's Grand Rapids load area and design day temperature.10 The federal definition decides which items fall inside each metro.21

Other items are company-wide: DTE Gas's statewide design day, supply and contracts, its Alpena, Upper Peninsula and Traverse City load areas and Six Lakes storage field (the record does not give its county), and Consumers Energy's system-wide peak day design. DTE Gas assigns no supply or storage figure to the metro, so this page uses the statewide statements.

Four points are unclear: which utility serves each place both tariffs name (the DTE Gas sheets do not list Warren, Troy or Southfield; the Consumers Energy sheets do), which county SEMCO's territory is in, how the Detroit/Ann Arbor load area relates to the metro, and which counties DTE Gas's Grand Rapids load area covers.

Grand Rapids-Wyoming-Kentwood

Counties and utilities. Both utilities name places in the Grand Rapids metro, and the record does not show which serves which. DTE Gas lists no locality in Barry County; Consumers Energy's tariff lists places in all five counties but not Grand Rapids, Kentwood or Wyoming, so the figures below are DTE Gas's.10

Figures for Grand Rapids. The record has none for supply or storage. DTE Gas's design day load for its Grand Rapids area is 613 MMcf per day in January 2027, 24.5% of the system-wide total by our calculation.24 The record does not say which counties the area covers.

DTE Gas's mean design day temperature for Grand Rapids is -7 degrees F at the end of January (Detroit: -6). DTE Gas said continued population growth in specific areas such as Kent County (major city Grand Rapids) will continue to change its peak-day load.10

What applies from the rest of the page. The load figures name no storage field in the five counties and no metro share of DTE Gas's customers, so the system-wide figures apply and the outlook rests on them for both metros.10 DTE Gas's Taggart compressor station is in Montcalm County, one of the five.29 The generator and Federal Register searches under the demand heading cover the Grand Rapids counties too.9

How much spare gas capacity does Detroit have on the coldest day?

DTE Gas's own plan for its coldest day shows no spare supply.

Pipelines supplying the Detroit and Grand Rapids area N ANR Pipeline ANR Pipeline ANR Pipeline ANR Pipeline ANR Pipeline ANR Pipeline Vector Pipeline Vector Pipeline Vector Pipeline Vector Pipeline ANR Pipeline ANR Pipeline Vector Pipeline Vector Pipeline ANR Pipeline ANR Pipeline Belle River Belle River Columbus Columbus Taggart Taggart West Columbus West Columbus Detroit Detroit Grand Rapids Grand Rapids Warren Warren Sterling Heights Sterling Heights Dearborn Dearborn Barry County Barry County Ionia County Ionia County Kent County Kent County Lapeer Co. Lapeer Co. Livingston Co. Livingston Co. Montcalm Co. Montcalm Co. Ottawa County Ottawa County Wayne Co. Wayne Co. Cleveland Cleveland Toledo Toledo Ann Arbor Ann Arbor Lansing Lansing South Bend South Bend I-94 I-94 I-80 I-75 I-75 I-69 I-69 I-96 US-131 US-127 I-90 US-23 I-196 US-31 US-10 Pipelines supplying the Detroit and Grand Rapids area Other gas pipelines Highways Detroit and Grand Rapids metro areas (11 counties) County lines Cities and towns Underground gas storage field named on this page
Figure 1. Major natural gas pipelines serving Detroit and Grand Rapids. Simplified, not to scale. Discovery Energy illustration from EIA and U.S. Census data; facility locations: EIA Atlas underground storage layer (2020). Counties, places, state outline and population: U.S. Census Bureau. Coastline, lakes and highways: Natural Earth (public domain).

In words: what the map shows

  • Pipelines labeled: ANR Pipeline; Vector Pipeline.
  • Underground gas storage fields marked: Belle River; Columbus; Taggart; West Columbus.
  • Metro counties outlined (11): Barry County; Ionia County; Kent County; Lapeer County; Livingston County; Macomb County; Montcalm County; Oakland County; Ottawa County; St. Clair County; Wayne County.
  • Cities and towns labeled include: Detroit; Cleveland; Toledo; Grand Rapids; Warren; Sterling Heights; Ann Arbor; Lansing.
  • Other gas pipelines in the area are drawn in gray and are not labeled.
  • Highways are drawn for orientation. A small state locator map sits in a corner.

DTE Gas's design day plan matches supply to requirements. For January it shows 2,507 MMcf per day of flowing and storage supply against 2,507 MMcf per day of requirements including fuel, with unallocated supply of 0.0. The filing prints no margin line, so the 0% margin is our calculation: 2,507 minus 2,507 is 0 MMcf per day. That is below the 5% reserve the outlook scale treats as thin, and the base level of the outlook rests on it.3

The plan leans on storage. DTE Gas said approximately 63% of its January 2027 peak day supply comes from storage, that a single storage field can account for up to 35% of total system demand on a design day, and that processing equipment at critical storage fields is forecasted to be operating at its maximum capacity, without redundant units at all fields. It did not name the fields. Three of its four storage fields (Belle River, Columbus and West Columbus) are in St. Clair County, a metro county.3

DTE Gas also said it periodically assesses risks and has contingencies for design day operational challenges, that there is no imminent risk to the system, and that its design day assumptions are conservative, with the coldest temperature in each of sixteen regions presumed to occur on the same day.27

For the 2026-2027 plan year it plans to hold approximately 379 MMcf per day (400 MDth per day) of firm transportation for the winter. MDth means thousands of dekatherms, a unit of gas energy. These are company statements.3

The Commission's order approving the settlement, and Staff's testimony, make no finding on design day or capacity.5

For the Detroit/Ann Arbor area, DTE Gas's January design day load is 1,497 MMcf per day of 2,498 MMcf per day system-wide, 59.9% of the system total by our calculation.25 The record assigns no supply or storage to the area.2

Consumers Energy's figures are for its whole gas system, and the outlook rests on DTE Gas's. It said its winter peak day design is about 3,600 MMcf per day, with at least 49% of its peak day design requirements estimated to come from storage. MPSC Staff said it presented a reasonable and prudent peak day plan, in testimony that is partly confidential.

Its public Exhibit A-33 shows a total load requirement and total supply of 3,596 MMcf each in the 1/31/2027, 80-degree-day column, with storage and linepack (gas held in the pipelines) at 61% of supply in its normal-weather plan (page 1) and 57% in its design-colder-than-normal plan (page 2). We do not use its confidential or redacted passages.6

What is driving new natural gas demand?

The records searched document no new gas load in the six metro counties.

DTE Gas projects its customer count to grow, expects its energy waste reduction program to offset the higher volumes with a slight reduction in overall demand by the end of its five-year forecast, and names no new load.2

Consumers Energy said its forecast includes new natural gas-fueled electric generation in its service territory, and names no plant, county or service date.6

EIA's September 2026 generator inventory lists no planned natural gas-fired generator in Wayne, Oakland, Macomb, St. Clair, Lapeer or Livingston county, or in the five Grand Rapids counties, and shows two natural gas steam turbines of the Wyandotte municipal utility in Wayne County retired in June 2026. A search of Federal Register notices of the Federal Energy Regulatory Commission since January 1, 2025 finds none naming a metro county and a pipeline docket.9

The Midcontinent Independent System Operator's interconnection queue (its list of power projects waiting to connect) lists a 1,452 MW natural gas combined cycle project in Livingston County with a requested in-service date of April 1, 2030, and a 616 MW project in Ottawa County (Grand Rapids metro) with a requested in-service date of June 30, 2028. The entries name no gas supplier, so they do not show a gas load.12

A FERC notice of August 28, 2026 lists an interconnection agreement between the Michigan Electric Transmission Company and Consumers Energy for queue project J4160, a 55 MW gas combustion turbine in Ottawa County; the record we reviewed does not show whether Consumers Energy's gas system serves it.13

Data centers: As of October 29, 2026, we found no gas special contract or pipeline lateral for a data center on the DTE Gas, Consumers Energy or SEMCO systems in the records reviewed.11 On October 1, 2026 the Commission approved special contracts for DTE Electric to supply electricity to a Google data center in Van Buren Township, Wayne County, with service expected from December 2027 and maximum load by December 2028; they are electric contracts, and the record we reviewed does not show gas use.14

Nearby: DTE Electric contracts for a 1,383 MW data center in Saline Township, Washtenaw County, were conditionally approved on December 18, 2025. That is an electric item in a county that is not in either metro.15

Are upgrades arriving in time?

The public record we reviewed shows no capacity addition with a date and a budget for the metro. In its September 10, 2026 rate case order the Commission approved $2.4 million for DTE Gas's Belle River dehydration unit project, which no party opposed, and disallowed $6 million for the Belle River Unit #8 turbine exchange because DTE Gas had not shown the project advanced enough for rate base at this time. The judge said the dispute was about timing, not necessity, and DTE Gas said completion was planned for March 2027.

The order describes the turbine exchange as replacing the existing engine at the Belle River Compressor Station and no filing we reviewed says the dehydration unit project adds capacity, so we class both projects as maintenance of existing equipment, not capacity additions.30

DTE Gas said the turbine is needed to move gas in and out of its Belle River, Columbus and West Columbus fields and will exceed the recommended 30,000 hours of run-time during the test year.7

DTE Gas renewed 50 MDth per day of ANR Southwest capacity and 17.5 MDth per day of winter Vector Alliance capacity through October 31, 2028, with rights of first refusal that it said apply in the future. By our calculation, that 67.5 MDth per day is 64.0 MMcf per day at the filing's 1.054 MMBtu per Mcf, 2.55% of the January design day and 16.9% of the 400 MDth per day of firm transportation DTE Gas plans to hold for winter 2026-27.4

On January 31, 2026 the federal Pipeline and Hazardous Materials Safety Administration ordered ANR Pipeline to cut operating pressure by 20% along its 501 mainline and the parallel loop line between its Shelbyville and Celestine compressor stations, after a January 27, 2026 rupture of the loop line near Columbus, Indiana. The order describes the loop line as running from near Eunice, Louisiana to near Ann Arbor, Michigan, does not say how much of DTE Gas's supply moves on that segment, and the filings we reviewed do not include a later release of the restriction.28

What does this mean for business gas costs?

The record gives no cost figure for capacity by customer class, so none is given here. The positions and decisions on file:

  • The Commission's October 1, 2026 order says its September 10, 2026 final decision authorized DTE Gas to increase its annual revenues by $149.318 million for service on and after October 1, 2026, against a request of $237.5 million.7
  • A group of large industrial customers argued for a design day demand capacity allocator aligned with DTE Gas's planning criteria, in place of the average and peak allocator. This is a party's position.7
  • The approved gas cost recovery settlement bills a supplier of last resort reservation charge to gas cost recovery customers. MPSC Staff noted DTE Gas's firm pipeline reservation charges of $74 million for 2026-2027 are approximately 36% higher than the $54 million of the previous plan year.5

Who bears the cost of any future storage capacity work is not decided in the record we reviewed.

Who gets gas first in a shortage?

In a shortage, both utilities' tariffs set an order for cutting back gas to customers, called curtailment.

DTE Gas's tariff (Rule C3.2) sets five curtailment priorities. Priority One includes residential service, plant protection, essential public health and safety uses, and commercial and industrial requirements of 1,250 Mcf (thousand cubic feet) or less per base period month.8 Priorities Two, Three and Four cover commercial and industrial requirements above 1,250, 8,334 and 41,667 Mcf, each up to the next threshold. Priority Five is non-residential customers above 41,667 Mcf with alternate fuel capability, for the alternate fuel load only.

Consumers Energy's tariff (Rule C3) treats firm sales and transportation customers equally under five priority categories, with Priority Five curtailed first and Priority One last.8

Winter and market context

NOAA's Climate Prediction Center said on October 15, 2026 that its November 2026 to January 2027 outlook gives the highest odds of warmer than normal conditions to the Great Lakes, a discussion that names regions and not counties.B1 National gas inventory figures are in a note and do not set the outlook.26

Winter weather and NOAA's outlook

The table shows heating degree days, a measure of how cold the weather was, from November to March in winters 2023-24, 2024-25 and 2025-26, with each winter's share of the 1991-2020 normal.16

Station 2023-24 2024-25 2025-26 1991-2020 normal
Detroit Metro Airport 4,130 (85%) 4,570 (94%) 4,972 (102%) 4,871
Gerald R. Ford International Airport (Grand Rapids) 4,335 (86%) 4,853 (96%) 5,162 (102%) 5,053

Heating degree days, November to March, with the share of the 1991-2020 normal in brackets. Source: NOAA ACIS.22

Detroit. On October 15, 2026, NOAA's Climate Prediction Center gave Detroit, for November 2026 to January 2027 and December 2026 to February 2027, at least a 50% chance of above-normal temperatures, about 33% near-normal and no more than 17% below-normal; the first is a floor and the last a ceiling.17 These are probabilities for a three-month average, not a forecast of days, and a warm lean does not rule out cold days.23

Grand Rapids. NOAA's outlook for Grand Rapids gives the same probabilities for both periods, and the same limits apply.

What's new (as of October 29, 2026)

On September 10, 2026 the Commission denied DTE Gas's $284.1 million request to replace its aging Taggart compressor station, which is in Montcalm County and was proposed for service in September 2027 to address equipment obsolescence and outages.1829 On October 15, 2026 the Commission disallowed costs in Consumers Energy's gas rate case for storage pipeline replacement projects, finding the plans premature and the timelines uncertain.19 DTE Gas announced on September 10, 2026 that it intends to file another gas rate case in November, according to the Michigan Attorney General's September 11, 2026 release.20

What should Detroit-area facilities check now?

  • Tariffs and charges, through a utility audit. Confirm each account is on the right rate class and tariff, and that riders, demand charges and capacity-related charges are billed correctly. Over 70% of the clients Discovery Energy has audited were billed incorrectly. An audit verifies tariffs and charges and recovers overcharges before winter costs rise.
  • Which utility, and which supply arrangement. Confirm whether each site is served by DTE Gas, Consumers Energy, SEMCO or another gas utility, and whether gas is bought from the utility or from a third-party supplier.
  • Your curtailment priority. Check each account's monthly requirement against the priority thresholds in DTE Gas's tariff (Rule C3.2) and whether alternate fuel capability is registered.
  • Backup plans and fuel. Check that alternate-fuel and curtailment plans are current and feasible, and that fuel inventories and resupply arrangements are in place before December.
  • Upcoming proceedings. Track DTE Gas's next gas cost recovery plan and any project at its Belle River storage complex.

What to check in your contracts

Area What to check
Winter price spikes Whether the gas is priced on a daily or a monthly index, how large the local basis (the gap between the local price and the national benchmark) has been in cold weather, and how much of your winter use is covered by fixed-price volumes.
Delivery constraints Whether your transportation is firm, what delivery obligations your supplier carries and what happens if it cannot deliver, and what the curtailment provisions say about who is cut first.
Operational flow orders What balancing obligations the contract places on you, and whether penalties that a pipeline or utility charges under an operational flow order are passed through to you.
Expansion plans Where a utility or pipeline plans added capacity, whether the utility has confirmed in writing the incremental hourly and daily capacity available to your site, and from what date.

Checks for gas supply and transportation contracts. They are questions to put to your supplier or utility, not financial advice.

Frequently asked questions

Will Detroit businesses face natural gas shortages this winter?

The record does not show a shortage, and this page makes no prediction about outages. See 'How much spare gas capacity does Detroit have on the coldest day?'

Does DTE Gas have enough capacity for its coldest day?

Its own plan shows no spare supply on the January 2027 peak day, and two further documented risks, set out in the outlook section, put the outlook at High. See 'What is the outlook for Detroit gas capacity through 2029?'

How much of DTE Gas's coldest day comes from storage?

DTE Gas's plan leans heavily on storage, a company-wide figure, and it did not name the field that can supply up to 35% of design day demand. See 'How much spare gas capacity does Detroit have on the coldest day?'

Which gas utility serves the Detroit area?

Check your bill or ask the utility which one serves a site. See 'Who serves the Detroit and Grand Rapids areas?'

Who is cut off first if gas is short?

Under both DTE Gas's and Consumers Energy's tariffs, Priority Five is curtailed first and Priority One last. See 'Who gets gas first in a shortage?'

Is new gas-fired power or a data center adding gas demand in the metro?

No filing we reviewed documents one, and the testimony we reviewed names no new load. See 'What is driving new natural gas demand?'

Does this case study cover Grand Rapids?

Yes. The Grand Rapids-Wyoming-Kentwood metro has its own section, and the figures are DTE Gas's for its whole system, since its tariff names Grand Rapids, Kentwood and Wyoming. See 'Who serves the Detroit and Grand Rapids areas?'

Discovery Energy publishes gas capacity case studies for other metros, using the same method and outlook scale.

All gas capacity ratings by U.S. metro

Background for commercial and industrial energy buyers: Utility cost intelligence

Understand your capacity exposure

Discovery Energy reviews service elections, interruption terms and regulatory proceedings for organizations across the U.S. and Canada, so capacity changes are understood before they reach the bill.

Schedule a review

What this page does not cover

  • Dated supply events since 2020. None appear in the filings we reviewed; the Staff testimony names only the 2019 polar vortex.
  • Which storage fields are at their processing limit.
  • Consumers Energy's confidential passages and any redacted figures, and any peak day or capacity figure for SEMCO.
  • Which utility serves which place.
  • Whether state air permits or county economic development filings show new gas loads. These were not available to us for this edition.
  • How the DTE Gas rate case allocates costs beyond the positions already described.

Notes

  1. DTE Gas Company Rate Book, M.P.S.C. No. 1 - Gas, Territory Served sheets A-16.00 and A-17.00 (issued February 6, 2013), PDF 17 and 18; Consumers Energy Company Rate Book, M.P.S.C. No. 3 - Gas, Territory Served sheets A-12.00 to A-23.00 (issued December 13, 2019), PDF 17 to 23; SEMCO Energy Gas Company, Company Description web page. Tariff territory lists, not customer counts. The federal definition is Office of Management and Budget Bulletin No. 23-01 (July 21, 2023). The Detroit metro counties are Lapeer, Livingston, Macomb, Oakland, St. Clair and Wayne; the Grand Rapids metro counties are Barry, Ionia, Kent, Montcalm and Ottawa. The DTE Gas sheets name townships in Oakland County (Commerce, Highland, Lyon and Milford), Macomb County (Chesterfield and Macomb, and part of St. Clair Shores) and Livingston County (Brighton, Deerfield and Unadilla). The tariffs list territory, not customers, so they do not show which utility serves which place; most figures on the page are company-wide, so they also cover areas beyond the two metros. ↩
  2. DTE Gas, revised application in Case U-21889, filed February 17, 2026, witness Chapel, PDF 11, 23 and 45 (customer and volume forecast, peaker load, Exhibit A-5). Utility statements. DTE Gas projects its customer count to grow from about 1.35 million rate schedule customers in 2025-2026 to about 1.39 million by 2029-2030. It said recent changes in the Detroit area reflect changes in peaker load, and that gas-fired generators are modeled using their most recent three years of activity. ↩
  3. Same filing, witness Bratu, PDF 124, 130 to 134 and 156 (design day plan, storage, contracts, Exhibit A-15). Utility statements, company-wide. DTE Gas's design day plan shows the same equality of supply and requirements in February and March. Earlier, after the 2013-2014 winter, DTE Gas purchased parking services and improved the Columbus and Belle River storage fields; these are older measures. The margin is our calculation. ↩
  4. Same filing, witness Madigan, PDF 54 and PDF 82 (renewed pipeline capacity; the Vector contract). ↩
  5. Michigan Public Service Commission, order approving settlement in Case U-21889 (August 6, 2026), PDF 2 and 5; MPSC Staff testimony of Laura Maio (May 7, 2026), PDF 14 and 16. A Commission order and a Staff analysis; neither makes a capacity finding. In the settlement, the supplier of last resort reservation charge is an additional $0.50 per Mcf billed to GCR customers and $0.34 per Mcf billed to GCC customers. ↩
  6. Consumers Energy, application in Case U-21887 (public redacted copy, filed December 22, 2025), witness McDonnell, PDF 42, 70, 82 and 84; MPSC Staff testimony of Nyrhe U. Royal (July 15, 2026, public redacted), PDF 17; Commission order of October 1, 2026, PDF 1. Utility statements, system-wide; Exhibits A-17 (PDF 139) and A-33 (PDF 216 and 217) are in the saved public copy, and confidential passages are not. Consumers Energy also said it relies heavily on storage with limited reliance on flowing pipeline supply and limited firm contract capacity on interstate pipelines. Its Exhibit A-33 shows storage and linepack at 57% of supply on page 2 of the exhibit (line 20, 1/31/2027 column; page labeled Design Colder than Normal; page 1, labeled Normal, shows 61% in the same column, and both pages show total supply of 3,596 MMcf), and its Exhibit A-17 lists a forecast total system peak day load of 3,596 MMcf for winter 2026/27. ↩
  7. Michigan Public Service Commission, final decision in Case U-21973 (DTE Gas rate case, September 10, 2026), PDF 61, 62, 99, 274 and 301; order approving tariffs (October 1, 2026), PDF 1. The $237.5 million request included a $74.8 million infrastructure recovery mechanism roll-in. The September 2026 rate case order summarizes parties' arguments about the ten-year Gas Delivery Plan. The Commission's earlier order asked DTE Gas for a ten-year Gas Delivery Plan that considers declining natural gas demand. ↩
  8. DTE Gas tariff, Rule C3.2 (PDF 53); Consumers Energy tariff, Rule C3 (PDF 48). ↩
  9. EIA-860M inventory for September 2026 (Planned sheet), filtered to the six Detroit metro counties and, in a later check on October 29, 2026, to the five Grand Rapids counties (Planned and Retired sheets; the only planned unit in the eleven counties that burns a gas is a 1.6 MW landfill gas engine in Barry County, and the Retired sheet lists Wyandotte Municipal Service Commission natural gas steam turbines 4 and 7, retired June 2026); and a search of Federal Register notices of FERC since January 1, 2025 by county name. A notice that spells a place differently would be missed. ↩
  10. DTE Gas Rate Book, M.P.S.C. No. 1 - Gas, Territory Served sheets A-18.00 to A-23.00 (PDF 19 to 24); Consumers Energy Rate Book, M.P.S.C. No. 3 - Gas, Territory Served sheets A-12.00 to A-21.00 (PDF 12, 16, 17, 20 and 21); DTE Gas, revised application in Case U-21889, witness Chapel, PDF 23, and Exhibit A-5, PDF 44 and 45; Grand Rapids metro counties from the OMB delineation file. Tariff territory lists, not customer counts; the sheets are in columns, and the match of cities to counties is general geography, not a quotation. The township counts, the absence of Barry County from the DTE Gas sheets and of Grand Rapids, Kentwood and Wyoming from the Consumers Energy sheets, and the 24.5% share are our calculations. The record does not show which utility serves each place, or supply or storage for the Grand Rapids area. The generator inventory and Federal Register searches also cover the Grand Rapids counties (see Note 9). DTE Gas's Territory Served sheets list the cities of Grand Rapids, East Grand Rapids, Kentwood, Walker, Wyoming, Grandville, Rockford and Cedar Springs, and township entries in four of the five counties: 16 in Kent, 10 in Montcalm, five in Ottawa and one in Ionia (Otisco). Consumers Energy's tariff (issued in 2019) lists the City of Lowell and eight townships in Kent County. The system-wide figures that apply to both metros are the January 2027 peak day plan with no spare supply, the dependence on storage and the pipeline capacity renewed only to October 31, 2028. ↩
  11. Sources for the new-load check: EIA-860M September 2026 (11 Detroit and Grand Rapids counties); MISO public interconnection queue; Federal Register FERC notices since July 30, 2026 for the county names; Michigan Public Service Commission order U-21973 and Attorney General releases. Federal Register FERC notices for July 31 to October 29, 2026 naming the eleven counties (singular and plural), Detroit, Grand Rapids, ANR Pipeline, Vector Pipeline, Great Lakes Gas Transmission, Panhandle Eastern, Consumers Energy and DTE Gas: no notice names a Michigan metro county, none is an abandonment filing, and none changes the items above. ↩
  12. Midcontinent Independent System Operator, Generator interconnection queue, public project list (API), dated September 30, 2026, accessed October 28, 2026; MISO queue entry J3799: fuelType Gas, facilityType Combined Cycle, summerNetMW 1452.0, poiName BLACKFOOT - MADRID 345.0kV, applicationStatus Pending Revision Approval, studyCycle DPP-2025. Midcontinent Independent System Operator, Generator interconnection queue, public project list (API), dated September 30, 2026, accessed October 28, 2026; MISO queue entry J4159: fuelType Gas, facilityType Combined Cycle, summerNetMW 616.0, poiName ROOSEVELT, applicationStatus Active, studyCycle DPP-2026. The Ottawa County project was queued August 13, 2025 and the Livingston County project April 18, 2024. ↩
  13. Federal Register / Federal Energy Regulatory Commission, Combined Notice of Filings, Federal Register 2026-17635 (August 28, 2026), ER26-3608-000, dated August 28, 2026, accessed October 28, 2026; Federal Register 2026-17635, entry for the interconnection agreement between the Michigan Electric Transmission Company and Consumers Energy. ↩
  14. Michigan Public Service Commission, News release, DTE Electric and Google data center contracts, Case U-22058, dated October 1, 2026, accessed October 28, 2026, first paragraph; same release, in-service paragraph. ↩
  15. Michigan Public Service Commission, News release, DTE Electric contracts for Saline Township data center, Case U-21990, dated December 18, 2025, accessed October 28, 2026, first paragraph. ↩
  16. NOAA Regional Climate Centers, Applied Climate Information System (ACIS) StnData web service, monthly heating degree days (base 65F) and 1991-2020 normals, November to March of winters 2023-24 to 2025-26, accessed October 26 to 28, 2026: DETROIT METRO AIRPORT; GRAND RAPIDS GERALD R FORD INTL AP. Sums computed. ↩
  17. NOAA Climate Prediction Center, seasonal temperature outlook issued October 15, 2026, map data for November to January and for December to February, read at each metro's coordinates. The map gives the favored category and the lower edge of its probability band; NOAA's own explanation (Link) keeps near-normal at 33.3% and gives the opposite category the rest, so the above-normal figure is a floor and the below-normal figure a ceiling. At the two metros, for both periods, NOAA gives the chance of above-normal temperatures as at least 50%, near-normal as about 33% and below-normal as no more than 17%. ↩
  18. Michigan Public Service Commission, Final order, Case U-21973 (DTE Gas rate case), September 10, 2026, dated September 10, 2026, accessed October 28, 2026; PDF page 99 (denial) and PDF page 94 (the $284.1 million request and September 2027 service date); Michigan Public Service Commission, news release on the DTE Gas rate case order, Case U-21973, dated September 10, 2026, Taggart bullet. ↩
  19. Michigan Public Service Commission, News release, Consumers Energy gas rate case order, Case U-21981, dated October 15, 2026, accessed October 28, 2026, disallowed costs paragraph. ↩
  20. Michigan Department of Attorney General, press release, DTE announces another new rate case, dated September 11, 2026, accessed October 28, 2026, first paragraph. ↩
  21. Metro boundaries are the federal government's definition of each metro area, OMB Bulletin No. 23-01 (July 21, 2023). Record items on this page are sorted by whether they fall inside the Detroit or Grand Rapids metro using that definition. Sources: DTE Gas and Consumers Energy tariffs; DTE Gas revised application, February 2026. ↩
  22. Heating degree day sums and shares of the 1991-2020 normal were computed from NOAA ACIS monthly data (see Note 16). ↩
  23. NOAA's Climate Prediction Center outlook was read at each metro's coordinates; the map gives the lower edge of the favored category's probability band, so the above-normal figure is a floor and the below-normal figure a ceiling (see Note 17). ↩
  24. Grand Rapids area share of DTE Gas's system-wide January 2027 design day load, supporting the 24.5% figure: 613 divided by 2,498 MMcf per day, our illustrative calculation. ↩
  25. Detroit/Ann Arbor area share of DTE Gas's system-wide January design day load, supporting the 59.9% figure: 1,497 divided by 2,498 MMcf per day, our illustrative calculation. ↩
  26. NOAA's Climate Prediction Center discussion of October 15, 2026 also gives the highest odds of warmer than normal conditions to Southeast Alaska and the upper Mississippi Valley. The U.S. Energy Information Administration said on October 6, 2026 that it expects U.S. natural gas inventories to enter the winter heating season 2% above the previous five-year average (source A1). ↩
  27. DTE Gas said its design day assumptions are conservative: minimum storage balances, statewide coldest record temperatures, maximum midstream withdrawal rates and high end-use transportation withdrawal rates occur simultaneously, and the coldest temperature in each of sixteen regions is presumed to occur on the same day. ↩
  28. U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, Corrective Action Order, CPF 12026031 to ANR Pipeline Company, January 31, 2026, PDF page 2 (the rupture, with the finding of likely stress corrosion cracking, and the description of Loop Line 1-501), page 4 (definitions of the affected segments and the failure) and page 5 (item 1, the operating pressure restriction). A federal safety order; the order gives no share of DTE Gas's supply. ↩
  29. Michigan Department of Environment, Great Lakes, and Energy, Renewable Operating Permit staff report MI-ROP-N3392-2020 for the DTE Gas Company Taggart Compressor Station (Six Lakes, Montcalm County), August 17, 2020, Source Description, PDF page 4. The DTE Gas application in Case U-21889 (PDF 124) places the Six Lakes storage field, the fourth of DTE Gas's storage fields, in central Michigan without naming a county. ↩
  30. Michigan Public Service Commission, final decision in Case U-21973 (September 10, 2026): on the turbine exchange, PDF 60 (the project "replaces the Solar Turbines Taurus 70 engine at the Belle River Compressor Station to preserve reliable injection and withdrawal operations") and PDF 61 (DTE Gas's "routine gas storage projects"); on the dehydration unit, PDF 99 ("DTE Gas included $2.4 million in this case for its Belle River Dehydration Unit project"), with no description of the unit. Separately, DTE Gas's revised application in Case U-21889 (filed February 17, 2026), testimony of witness Bratu, PDF 136, says a new dehydration unit at the Belle River Mills storage field "can be used as backup if the old dehydration unit would fail" and was commissioned in 2025; neither document says that this is the project funded in Case U-21973, so we do not link them. ↩

Market and weather sources

Public web sources, as of October 25, 2026. They are context, separate from the regulatory record cited in the Notes. The Climate Prediction Center issues its seasonal outlook once each month near mid-month; this section is refreshed on the publication date.

  1. A1. U.S. Energy Information Administration, press release, "EIA expects a mixed picture for winter fuel costs this year," October 6, 2026. Link
  2. B1. NOAA Climate Prediction Center, Prognostic Discussion for Long-Lead Seasonal Outlooks, issued October 15, 2026. Link ↩

Sources

  1. Michigan Public Service Commission, Case U-21889, DTE Gas Company revised application (February 17, 2026), Staff testimony of Laura Maio (May 7, 2026) and order approving settlement (August 6, 2026). Link
  2. Michigan Public Service Commission, Case U-21887, Consumers Energy Company application (public redacted), Staff testimony of Nyrhe U. Royal, and order (October 1, 2026). Link
  3. Michigan Public Service Commission, Case U-21973, final decision of September 10, 2026 and order approving tariffs of October 1, 2026. Link
  4. DTE Gas Company, Rate Book, M.P.S.C. No. 1 - Gas. Link
  5. Consumers Energy Company, Rate Book for Natural Gas Service, M.P.S.C. No. 3 - Gas. Link
  6. SEMCO Energy Gas Company, Company Description. Link
  7. Office of Management and Budget, OMB Bulletin No. 23-01, Revised Delineations of Metropolitan Statistical Areas, Micropolitan Statistical Areas, and Combined Statistical Areas, July 21, 2023.
  8. U.S. Energy Information Administration, EIA-860M Preliminary Monthly Electric Generator Inventory, September 2026. Link
  9. Federal Register, API search of Federal Energy Regulatory Commission notices by county. Link
  10. U.S. DOT Pipeline and Hazardous Materials Safety Administration, Corrective Action Order, CPF 12026031, ANR Pipeline Company, January 31, 2026. Link
  11. Michigan Department of Environment, Great Lakes, and Energy (EGLE), Renewable Operating Permit staff report MI-ROP-N3392-2020, DTE Gas Company Taggart Compressor Station. Link

Corrected November 9, 2026: the earlier version said the generator and Federal Register searches covered the six Detroit counties only; they also covered the five Grand Rapids counties. It said the record names no station or storage field in those counties; DTE Gas's Taggart compressor station is in Montcalm County. It gave Consumers Energy's storage and linepack share as 61% only; the share is 61% in its normal-weather plan and 57% in its design-colder-than-normal plan. The page now classes the $2.4 million Belle River dehydration unit project as maintenance, because no filing we reviewed says it adds capacity.