The latest data center news for Pennsylvania, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses4100 MW or more
Announced11,100 MWAt full buildout
Expected by 20303,780 MWWeighted by build stage
Added gas burn370.7 MMcf/dAverage day

Latest updates in Pennsylvania

  1. · Grid · Kentucky, Pennsylvania

    PPL raises capital plan to $25B, proposes 645 MW Kentucky gas plant, cites 14.7 GW Kentucky load pipeline

    Utility Dive reports PPL raised its 2027-2030 capital plan to $25 billion, $2 billion above the prior plan, mainly for a proposed 645 MW Kentucky gas plant targeted for Q2 2032 with a CPCN filing expected in Q1 2027. PPL cites 14.7 GW of potential Kentucky load growth through 2032, including 12.8 GW from data centers, and 35.3 GW of advanced-stage Pennsylvania data center projects. Its Invitium venture signed a letter of intent with QTS for about 2 GW of generation for a Salem Township data center.

    Sources: Utility Dive · Data Center Index

The buildout in Pennsylvania

We track 4 data center campuses of 100 MW or more in Pennsylvania (2 under construction, 1 operating and expanding, 1 announced). Together they announce 11,100 MW at full buildout; weighted by build stage, we expect about 3,780 MW to be running by 2030. That load lands on the PJM grid. Named power suppliers: On-site; PPL. The largest expected load is TECfusions Keystone Connect (1,620 MW by 2030, operating, expanding). Added natural gas burn, from grid-supplied and on-site generation, comes to about 370.7 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
TECfusions Keystone ConnectTECfusionsUpper Burrell, PAOperating, expanding3,0001,620Not disclosedNot disclosedGridNov 4, 2026
Aligned Shippingport (Bruce Mansfield)Aligned Data CentersShippingport, PAUnder construction2,000960Not disclosedNot disclosedGridNov 4, 2026
Homer City Energy CampusHomer City RedevelopmentHomer City, PAUnder construction4,500864On-site gasOn-siteGas–
Wildcat Ridge AI CampusCornell Realty ManagementArchbald, PAAnnounced1,600336Not disclosedPPLGrid–

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.