The latest data center news for Illinois, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses3100 MW or more
Announced3,800 MWAt full buildout
Expected by 2030786 MWWeighted by build stage
Added gas burn61.5 MMcf/dAverage day

Latest updates in Illinois

  1. · Build · Illinois

    TerraWatt proposes a data center campus at the former Alton Steel site

    TerraWatt has a contingent deal to buy the 381-acre Alton Steel site in Alton, Illinois. Rezoning and an Ameren Illinois load study are still pending. Added to the index as DC-086 (proposed, 200 MW).

    Sources: St. Louis Public Radio · DatacenterDynamics · Data Center Index

The buildout in Illinois

We track 3 data center campuses of 100 MW or more in Illinois (2 announced, 1 proposed). Together they announce 3,800 MW at full buildout; weighted by build stage, we expect about 786 MW to be running by 2030. That load lands on the MISO, PJM grids. Named power suppliers: Ameren Illinois; ComEd. The largest expected load is Joliet Technology Center (378 MW by 2030, announced). Added natural gas burn, from grid-supplied and on-site generation, comes to about 61.5 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Joliet Technology CenterHillwood / PowerHouseJoliet, ILAnnounced1,800378Not disclosedComEdGrid–
Project CardinalPioneer DevelopmentYorkville, ILAnnounced1,800378Not disclosedComEdGrid–
TerraWatt Alton (former Alton Steel)TerraWattAlton (Madison County), ILProposed20030Not disclosedAmeren IllinoisGridOct 21, 2026