Request a bill review
Data Center Index · United States

Data centers in Tennessee

The latest data center news for Tennessee, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses1100 MW or more
Announced1,000 MWAt full buildout
Expected by 2030900 MWWeighted by build stage
Added gas burn148.6 MMcf/dAverage day

Latest updates in Tennessee

No updates for Tennessee yet.

The buildout in Tennessee

We track 1 data center campus of 100 MW or more in Tennessee (1 operating and expanding). Together they announce 1,000 MW at full buildout; weighted by build stage, we expect about 900 MW to be running by 2030. That load lands on the Southeast utilities grid. Named power suppliers: TVA / MLGW + on-site gas. The largest expected load is xAI Colossus 1 + 2 (900 MW by 2030, operating, expanding). Added natural gas burn, from grid-supplied and on-site generation, comes to about 148.6 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
xAI Colossus 1 + 2xAIMemphis / Southaven, TNOperating, expanding1,000900Grid + on-site gasTVA / MLGW + on-site gasGas–

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.