Data centers in Missouri
The latest data center news for Missouri, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.
Latest updates in Missouri
No updates for Missouri yet.
The buildout in Missouri
We track 1 data center campus of 100 MW or more in Missouri (1 announced). Together they announce 1,200 MW at full buildout; weighted by build stage, we expect about 252 MW to be running by 2030. That load lands on the SPP grid. The largest expected load is Nebius Independence (252 MW by 2030, announced). Added natural gas burn, from grid-supplied and on-site generation, comes to about 16.4 MMcf/d on an average day.
| Campus | Location | Status | Announced MW | Expected MW 2030 | Power supply | Utility | Impact | Last change |
|---|---|---|---|---|---|---|---|---|
| Nebius IndependenceNebius | Independence, MO | Announced | 1,200 | 252 | Not disclosed | Not disclosed | Nov 4, 2026 |
Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.