Request a bill review
Data Center Index ยท United States

Data centers in Missouri

The latest data center news for Missouri, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses1100 MW or more
Announced1,200 MWAt full buildout
Expected by 2030252 MWWeighted by build stage
Added gas burn16.4 MMcf/dAverage day

Latest updates in Missouri

No updates for Missouri yet.

The buildout in Missouri

We track 1 data center campus of 100 MW or more in Missouri (1 announced). Together they announce 1,200 MW at full buildout; weighted by build stage, we expect about 252 MW to be running by 2030. That load lands on the SPP grid. The largest expected load is Nebius Independence (252 MW by 2030, announced). Added natural gas burn, from grid-supplied and on-site generation, comes to about 16.4 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Nebius IndependenceNebiusIndependence, MOAnnounced1,200252Not disclosedNot disclosedGridNov 4, 2026

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.