The latest data center news for Michigan, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses2100 MW or more
Announced1,740 MWAt full buildout
Expected by 20301,012 MWWeighted by build stage
Added gas burn79.1 MMcf/dAverage day

Latest updates in Michigan

  1. · Build · Michigan

    Michigan economic group pitches a 700 MW data center near Lansing; the host township objects

    LEAP and Lighthouse Sustainability pitched a campus of up to 700 MW, reported at $10 billion or more, on 423 acres in Delhi Township. No application is filed and no end user is named. The township learned of it from the media, ended its LEAP membership and is under a data center moratorium until April 2027. It is on the watch list and not included in the index totals.

    Sources: Baxtel · WKAR / Michigan Public · Data Center Index

The buildout in Michigan

We track 2 data center campuses of 100 MW or more in Michigan (1 under construction, 1 operating). Together they announce 1,740 MW at full buildout; weighted by build stage, we expect about 1,012 MW to be running by 2030. That load lands on the MISO, PJM grids. Named power suppliers: DTE. The largest expected load is Stargate Michigan 'The Barn' (672 MW by 2030, under construction). Added natural gas burn, from grid-supplied and on-site generation, comes to about 79.1 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Stargate Michigan 'The Barn'Related Digital (OpenAI / Oracle)Saline Township, MIUnder construction1,400672Grid (DTE)DTEGrid–
Hyperscale Data MichiganHyperscale Data, Inc.Dowagiac, MIOperating340340GridNot disclosedGridNov 4, 2026

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.