Data centers in Louisiana
The latest data center news for Louisiana, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.
Latest updates in Louisiana
No updates for Louisiana yet.
The buildout in Louisiana
We track 1 data center campus of 100 MW or more in Louisiana (1 under construction). Together they announce 5,000 MW at full buildout; weighted by build stage, we expect about 1,200 MW to be running by 2030. That load lands on the MISO grid. Named power suppliers: Entergy Louisiana. The largest expected load is Meta Hyperion (1,200 MW by 2030, under construction). Added natural gas burn, from grid-supplied and on-site generation, comes to about 156.4 MMcf/d on an average day.
| Campus | Location | Status | Announced MW | Expected MW 2030 | Power supply | Utility | Impact | Last change |
|---|---|---|---|---|---|---|---|---|
| Meta HyperionMeta | Richland Parish (Holly Ridge), LA | Under construction | 5,000 | 1,200 | Grid, dedicated gas plants | Entergy Louisiana | – |
Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.