Data centers in Kansas

The latest data center news for Kansas, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses1100 MW or more
Announced2,000 MWAt full buildout
Expected by 2030420 MWWeighted by build stage
Added gas burn27.4 MMcf/dAverage day

Latest updates in Kansas

  1. · Policy · Ohio, Maine, Kansas, California

    Voters back data center limits in 40 of 41 local ballot measures across 10 states

    Baxtel, citing Ballotpedia's tally, reports voters limited data centers or rejected pro-development proposals in 40 of 41 local measures on Nov 3, with 21 in Ohio. Examples include bans in Hubbard and Granville, Ohio, a permanent ban above 10 MW in Emporia, Kansas, and moratoriums in Wells and Wiscasset, Maine. Results are unofficial, and the Washington Post counted a lower figure (at least 38 jurisdictions). Upcoming votes: Clarksville, Arkansas (Dec 1) and Mandan, North Dakota (Dec 15).

    Sources: Baxtel · Electric Choice · Data Center Index

The buildout in Kansas

We track 1 data center campus of 100 MW or more in Kansas (1 announced). Together they announce 2,000 MW at full buildout; weighted by build stage, we expect about 420 MW to be running by 2030. That load lands on the SPP grid. Named power suppliers: Evergy. The largest expected load is Digital Realty Astra Enterprise Park (420 MW by 2030, announced). Added natural gas burn, from grid-supplied and on-site generation, comes to about 27.4 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Digital Realty Astra Enterprise ParkDigital RealtyDe Soto, KSAnnounced2,000420Not disclosedEvergyGrid–

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.