Data Center Index ยท Canada

Data centers in Alberta

The latest data center news for Alberta, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses3100 MW or more
Announced8,730 MWAt full buildout
Expected by 2030838 MWWeighted by build stage
Added gas burn118.8 MMcf/dAverage day

Latest updates in Alberta

No updates for Alberta yet.

The buildout in Alberta

We track 3 data center campuses of 100 MW or more in Alberta (1 announced, 1 proposed, 1 approved). Together they announce 8,730 MW at full buildout; weighted by build stage, we expect about 838 MW to be running by 2030. That load lands on the Alberta (AESO) grid. Named power suppliers: AESO grid; AESO grid + dedicated gas plant; Off-grid / on-site. The largest expected load is Meta Sturgeon County (350 MW by 2030, announced). Added natural gas burn, from grid-supplied and on-site generation, comes to about 118.8 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Meta Sturgeon CountyMetaSturgeon County, ABAnnounced1,000350Dedicated gas plant ($4.6B, Pembina-led)AESO grid + dedicated gas plantGrid + gasโ€“
Wonder ValleyO'Leary VenturesGreenview (MD), ABProposed7,500338On-site gasOff-grid / on-siteGasโ€“
TransAlta Keephills data centreTransAltaKeephills (Parkland County), ABApproved230150GridAESO gridGridโ€“

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.