Request a bill review
Data Center Index · United States

Data centers in Wisconsin

The latest data center news for Wisconsin, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses1100 MW or more
Announced1,480 MWAt full buildout
Expected by 2030799 MWWeighted by build stage
Added gas burn62.5 MMcf/dAverage day

Latest updates in Wisconsin

No updates for Wisconsin yet.

The buildout in Wisconsin

We track 1 data center campus of 100 MW or more in Wisconsin (1 operating and expanding). Together they announce 1,480 MW at full buildout; weighted by build stage, we expect about 799 MW to be running by 2030. That load lands on the MISO grid. Named power suppliers: We Energies. The largest expected load is Microsoft Fairwater 1 (799 MW by 2030, operating, expanding). Added natural gas burn, from grid-supplied and on-site generation, comes to about 62.5 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Microsoft Fairwater 1MicrosoftMount Pleasant, WIOperating, expanding1,480799GridWe EnergiesGrid–

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.