Data centers in North Dakota

The latest data center news for North Dakota, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.

Campuses1100 MW or more
Announced700 MWAt full buildout
Expected by 2030700 MWWeighted by build stage
Added gas burn45.6 MMcf/dAverage day

Latest updates in North Dakota

No updates for North Dakota yet.

The buildout in North Dakota

We track 1 data center campus of 100 MW or more in North Dakota (1 operating). Together they announce 700 MW at full buildout; weighted by build stage, we expect about 700 MW to be running by 2030. That load lands on the SPP grid. The largest expected load is Atlas Power Williston (700 MW by 2030, operating). Added natural gas burn, from grid-supplied and on-site generation, comes to about 45.6 MMcf/d on an average day.

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyUtilityImpactLast change
Atlas Power WillistonAtlas PowerWilliston, NDOperating700700GridNot disclosedGridNov 4, 2026

Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.