Data centers in North Dakota
The latest data center news for North Dakota, then every tracked campus of 100 MW or more with its status, size, power supply and impact rating.
Latest updates in North Dakota
No updates for North Dakota yet.
The buildout in North Dakota
We track 1 data center campus of 100 MW or more in North Dakota (1 operating). Together they announce 700 MW at full buildout; weighted by build stage, we expect about 700 MW to be running by 2030. That load lands on the SPP grid. The largest expected load is Atlas Power Williston (700 MW by 2030, operating). Added natural gas burn, from grid-supplied and on-site generation, comes to about 45.6 MMcf/d on an average day.
| Campus | Location | Status | Announced MW | Expected MW 2030 | Power supply | Utility | Impact | Last change |
|---|---|---|---|---|---|---|---|---|
| Atlas Power WillistonAtlas Power | Williston, ND | Operating | 700 | 700 | Grid | Not disclosed | Nov 4, 2026 |
Campus names link to full profiles on datacenterindex.info. Figures as of November 3, 2026. Source: Data Center Index (datacenterindex.info), Discovery Energy. How campuses are sized and rated: methodology.